Less Ads, More Data, More Tools Register for FREE

Pin to quick picksJubilee Metals Regulatory News (JLP)

Share Price Information for Jubilee Metals (JLP)

Share Price is delayed by 15 minutes
Get Live Data
2.80    -0.10 (-3.45%)
Bid:
2.70
Ask:
2.90
Spread: 0.20 (7.407%)
Market Cap: £90.25m
JLP Live PriceLast checked at - London Stock Exchange

Intraday Jubilee Metals Share Chart

Operations Update

16 Feb 2012 11:00

RNS Number : 5473X
Jubilee Platinum PLC
16 February 2012
 



AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN GB0031852162 16 February 2012

Jubilee Platinum PLC

("Jubilee" or the "Company")

Update

Jubilee, the AIM and JSE quoted mine to metal specialist is pleased to report an update on its Middelburg ferroalloy smelting operation (70% owned by Jubilee Smelting and Refining (Pty) Ltd.) and development on its Leinster nickel tailings project (the "Nickel Tailings Project" or "Project") in Western Australia.

HIGHLIGHTS

·; Middelburg smelter achieved record 774 tonnes ferroalloy production in January 2012, with continued ramp up of its new furnace;

 

·; Jubilee Smelting and Refining (Pty) Ltd ("JSR") received its environmental permitting to implement both the ConRoast smelting process as well as the refining of the produced PGM (platinum group metal) alloy at its Middelburg Smelting facility; and

 

·; Jubilee's Australian subsidiary, Braemore Nickel (Pty) Ltd ("Braemore") concluded a drilling program on the Leinster nickel sulphide tailings to obtain fresh samples for testwork at Mintek South Africa, in order to refine the scoping flowsheet on the Nickel Tailings Project.

Leon Coetzer, CEO of Jubilee Platinum commented: "We are pleased with the continued improved performance at our Middelburg smelting operation. We have met our set throughput targets for January and will continue to ramp up production through this quarter as we target full production. We have continued acquiring PGM containing feed material as we migrate our smelter capacity from ferroalloy smelting to PGM smelting. 

"With regard to our Australian nickel tailings project, we are pleased to have reached this stage on the project and look forward to the outcome of the confirmation testwork at Mintek with a view towards the potential development of the tailings".

Middelburg Smelter

JSR ramped up production from its new 5MW AC furnace with a record total 774 tonnes of ferroalloy output for January for the smelter operation.

 JSR remains focussed, in the short term, on ramping up the new furnace to its planned combined ferroalloy production of 1,100 tonnes per month in order to maximise cash flow. The extended ramp-up of the furnace was due mainly to initial refractory lining concerns and the nature of the stainless steel material, which prevented running the furnace at full capacity. This has now been resolved.

The Department of Economic Development, Environment and Tourism issued JSR with an Atmospheric Emission Licence in respect of its current and submitted new planned operations. JSR's smelter operation is now fully permitted for the implementation of the ConRoast process and associated refining of the PGM containing alloy. This, together with maximising cash flow from the ferroalloy smelting process, significantly advances JSR's medium term mission for the implementation of the complete ConRoast platinum smelting process and further strengthens its position in negotiations in sourcing PGM-rich chromite tailings.

Nickel Tailings Project

Braemore drilled and obtained fresh samples in January this year from the tailings in Western Australia ("Tailings") for further testwork. The samples have been despatched to Mintek, South Africa's national mineral research organisation, which has been contracted to carry out the testwork. This testwork is towards completion of an Engineering Study and Economic Evaluation (ESEE) of the Project, currently being carried out by Bateman Engineering Projects of South Africa ("Bateman").

Bateman's technical-economic review of the Project recommended testwork comprising pre concentration of the Tailings using a combination of classification and flotation methods in order to refine the Project scoping flowsheet and demonstrate from the ESEE the potential of the Project to meet the criteria stipulated in the Tailings Supply Agreement ("TSA Criteria"). Should the testwork and the ESEE demonstrate the potential to meet the TSA Criteria, the Company would anticipate progressing to a Definitive Feasibility Study on the Project thereafter.

Contacts

Jubilee Platinum plc

Colin Bird/Leon Coetzer

Tel +44 (0) 20 7584 2155 / Tel +27 (0)11 465 1913

Andrew Sarosi

Tel +44 (0) 1752 221937

finnCap Ltd

Matthew Robinson/Rose Herbert - corporate finance

Joanna Weaving - corporate broking

Tel +44 (0) 20 7600 1658 

Shore Capital Stockbrokers Limited (Joint Broker)

Jerry Keen/ Edward Mansfield

Tel: +44 (0) 20 7 408 4090

Sasfin Capital

Leonard Eiser /Sharon Owens

Tel +27 (0) 11 809 7500

Bishopsgate Communications Ltd

Nick Rome/Shabnam Bashir

Tel +44 (0) 20 7562 3350

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDMGMZGVDGZZM
Date   Source Headline
24th Apr 20237:00 amRNSCompany Update
23rd Mar 20234:35 pmRNSPrice Monitoring Extension
20th Mar 20237:00 amRNSHalf-Yearly Financial Report to 31 December 2022
17th Mar 20237:00 amRNSNotice of Results
17th Feb 20231:00 pmRNSDirector/PDMR Shareholding
17th Feb 20237:00 amRNSDirector/PDMR Shareholding
16th Feb 20237:00 amRNSInvestor Presentation
15th Feb 20239:05 amRNSSecond Price Monitoring Extn
15th Feb 20239:00 amRNSPrice Monitoring Extension
15th Feb 20237:00 amRNSOperations Update 6 months to 31 December 2022
24th Jan 202312:11 pmRNSTR-1: Notification of major holdings
23rd Jan 20238:00 amRNSExercise of Warrants
18th Jan 20233:48 pmRNSExercise of Warrants - Correction
18th Jan 20238:00 amRNSIssue of Equity
13th Jan 20232:05 pmRNSSecond Price Monitoring Extn
13th Jan 20232:00 pmRNSPrice Monitoring Extension
12th Jan 20234:40 pmRNSSecond Price Monitoring Extn
12th Jan 20234:35 pmRNSPrice Monitoring Extension
19th Dec 20227:00 amRNSZambia Update, Corporate Update & Warrant Exercise
24th Nov 20227:30 amRNSExercise of Warrants
22nd Nov 20228:51 amRNSCopper and Cobalt Operations Update
18th Nov 202212:00 pmRNSExercise of Warrants
16th Nov 20223:48 pmRNSResult of AGM
4th Nov 20227:00 amRNSExercise of Warrants
25th Oct 20227:02 pmEQSJubilee Metals on course for next level after transformational year, says CEO
25th Oct 20222:50 pmEQSJubilee Metals on course for next level after transformational year, says CEO
25th Oct 20227:00 amRNSAudited Results for the year ended 30 June 2022
21st Oct 20227:00 amRNSNotice of Results
7th Oct 20224:35 pmRNSPrice Monitoring Extension
14th Sep 20224:30 pmRNSExercise of Warrants
9th Sep 20224:35 pmRNSPrice Monitoring Extension
5th Sep 20227:00 amRNSProject Roan Achieves Nameplate Capacity
25th Aug 20222:25 pmRNSExercise of Warrants
10th Aug 20227:00 amRNSOperations Update for the 6 months to 30 June 2022
26th Jul 20227:00 amRNSExercise of Warrants
14th Jul 20227:00 amRNSBoard Appointment and Update on Board Committees
13th Jul 20227:00 amRNSZambia Progress Update
13th Jun 20223:51 pmRNSDirector/PDMR Shareholding
30th May 20227:00 amRNSExercise of Options
27th May 20227:00 amRNSGranting of Options
26th May 20227:00 amRNSAppointment of New Chairman and Joint Broker
16th May 20221:00 pmRNSResults of General Meeting
16th May 20227:00 amRNSCompany Update
20th Apr 202211:30 amRNSCorrection: Notice of General Meeting
19th Apr 20227:00 amRNSNotice of General Meeting
24th Mar 20227:00 amRNSInterim Results for Six Months to 31 December 2021
14th Mar 20227:00 amRNSHolding(s) in Company
11th Mar 20224:10 pmRNSHolding(s) in Company
7th Mar 20227:00 amRNSJubilee Settles All Historical Debt
8th Feb 20227:00 amRNSSix Month Operations Update - H2 2021

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.