The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNighthawk Energy Regulatory News (HAWK)

  • There is currently no data for HAWK

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Devon Project Update

10 Mar 2009 07:00

RNS Number : 5798O
Nighthawk Energy plc
10 March 2009
 



Nighthawk Energy plc

Update on Commercialisation of Devon Project

The directors of Nighthawk Energy plc ("Nighthawk" or "the Company") (AIM: HAWK), the US focused hydrocarbon and production company, are pleased to announce an operational update on the commercialisation of the Devon Oilfield waterflood project, located in Bourbon County, Kansas. Nighthawk holds an 80 per cent. interest in the project which covers an area of 1,764 acres. Running Foxes Petroleum Inc. ("Running Foxes") is the operator and holds the remaining 20 per cent.

The Devon Oilfield, one of Nighthawk's six development and production projects located in the US mid-west, has seen strong progress during the last six months, including:

Continuing drilling success
The ongoing construction of production and sales off-take facilities at the Vogel, Graham and Cleaver locations
Further construction of surface facilities
Expansion of the water injection process throughout the project area

Discovery of a new natural gas reservoir within the Graham area of the project

To date, Nighthawk has invested approximately US$6 million net in the Devon Oilfield project. All the wells drilled have targeted the Bartlesville channel sandstones at shallow depths of between 350 and 500 feet. The current status of drilling is as follows:

34 oil wells on primary production awaiting waterflooding to take effect
29 wells awaiting completion for production and tie in to surface facilities
11 wells drilled, cased and cemented for production
6 wells shut in awaiting infrastructure
15 injector wells injecting water
6 test wells designed to define the edges of the Bartlesville reservoir plugged and abandoned
20 wells permitted for future drilling

The current drilling success rate for the Devon Oilfield is 94 per cent., an excellent rate for any development project.

The rate of primary production is increasing as more wells are brought on stream and is on target to be in excess of 100 barrels of oil per day equivalent (gross), by 31 March 2009. The Directors expect this rate to increase markedly as additional wells are brought on stream.

Primary oil production should be considered a bonus prior to the waterflood process taking effect and a major positive indication. The water injection process is ongoing and the full effect on production is only expected to be observed during Summer 2009.  At this stage of development, it is not possible to accurately predict optimum production levels, however, expectations currently range from 500 to 1,500 barrels per day (gross) for the developed acreage at the Devon Oilfield.

In addition to the oil production, a new and positive development is the discovery of a primarily natural gas reservoir at the Devon project, as announced o19 February 2009. The Graham 6-36D-3 well was tested from the Lower Bartlesville formation at a depth of 430 to 438 feet resulting in a stabilised open flow test of 627 MCFGPD (thousand cubic feet of gas per day) through a one inch choke.

The well has been hooked up to a local pipeline and gathering system and natural gas is now producing at a choked off rate of 210 MCFGPD per day, a significant increase on production last reported of 160 MCFGPD.

A further five wells have subsequently been drilled with similar results to the Graham 6-36D-3 well and have all been cased as producers from the same Bartlesville formation. These wells are expected be hooked up to a pipeline and sale of product to commence within the next ten days.

David Bramhill, Managing Director, commented "Running Foxes is making excellent progress on the continuing development of the Devon Oilfield. We currently have six projects that are either in early production or at the development stage. It is interesting to note that our Buchanan Group waterflood projects located in neighbouring Missouri, and contiguous to the Devon Oilfield with similar geology, cover in excess of 40,000 acres, a multiple of 24 times that at the Devon Oilfield.

"With the ongoing and successful development of our core projects, namely Jolly Ranch, Buchanan Group and the Devon Oilfield, expectations remain high.  The current financial environment does not allow the value being created to be reflected in the share price. However, with our project portfolio, we believe we have the opportunity to build Nighthawk into a successful mid-tier enterprise within a reasonable timeframe When the eventual upturn in both general market confidence and oil and gas prices happens, Nighthawk will be well positioned to benefit."

David Racher B.Sc (Hons) Geology, who is a consultant to Nighthawk and has over 37 years of experience in the hydrocarbons industry and previously managed the Lasmo plc onshore US portfolio in KansasLouisianaSouth DakotaTexas and Wyoming, has approved the technical information contained in this announcement.

Enquiries:

Nighthawk Energy plc

David Bramhill, Managing Director

Tim Heeley, Commercial Director

01271 882160

020 7887 1454

07956 525433

office@nighthawkenergy.net

www.nighthawkenergy.net

Hanson Westhouse Limited 

Tim Feather

Matthew Johnson

0113 246 2610

tim.feather@hansonwesthouse.com

matthew.johnson@hansonwesthouse.com

Bishopsgate Communications Limited

Nick Rome

020 7562 3395

nick@bishopsgatecommunications.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCJLMPTMMBMBBL
Date   Source Headline
31st Aug 20114:35 pmRNSPrice Monitoring Extension
25th Aug 20114:27 pmRNSChange of Adviser
17th Aug 20114:35 pmRNSPrice Monitoring Extension
12th Aug 20114:40 pmRNSSecond Price Monitoring Extn
12th Aug 20114:35 pmRNSPrice Monitoring Extension
9th Aug 20112:13 pmRNSHolding(s) in Company
4th Aug 20114:40 pmRNSSecond Price Monitoring Extn
4th Aug 20114:35 pmRNSPrice Monitoring Extension
3rd Aug 20117:00 amRNSQ2 Production and Operations Update
27th Jul 20114:36 pmRNSPrice Monitoring Extension
19th Jul 20117:00 amRNSAppointment of Chief Operating Officer
13th Jul 20114:35 pmRNSPrice Monitoring Extension
11th Jul 20114:40 pmRNSSecond Price Monitoring Extn
11th Jul 20114:35 pmRNSPrice Monitoring Extension
6th Jul 20117:00 amRNSChange of Registered Office
4th Jul 20114:35 pmRNSPrice Monitoring Extension
29th Jun 20114:04 pmRNSDirector/PDMR Shareholding
28th Jun 20113:14 pmRNSDirector/PDMR Shareholding
14th Jun 20114:35 pmRNSPrice Monitoring Extension
14th Jun 20119:41 amRNSDirectorate Change
9th Jun 20114:35 pmRNSPrice Monitoring Extension
7th Jun 20114:35 pmRNSPrice Monitoring Extension
2nd Jun 20114:35 pmRNSPrice Monitoring Extension
1st Jun 20117:00 amRNSGrant of Options
26th May 20117:00 amRNSDirector/PDMR Shareholding
18th May 20117:00 amRNSJolly Ranch Q1 2011 Production & Operations Update
9th May 20114:35 pmRNSPrice Monitoring Extension
9th May 20117:00 amRNSAppointment of CFO
28th Apr 20117:00 amRNSJolly Ranch Reserves Report
30th Mar 201111:23 amRNSHolding(s) in Company
29th Mar 20117:00 amRNSHalf Yearly Report
8th Mar 20117:00 amRNSJolly Ranch Operations Update & Drilling Schedule
4th Mar 201111:10 amRNSElectronic Communication with Shareholders
1st Mar 20117:00 amRNSTotal Voting Rights
8th Feb 20117:00 amRNSJolly Ranch Quarterly Production Update
1st Feb 20117:00 amRNSDraw down of funds and issue of equity
24th Jan 20117:00 amRNSJolly Ranch Reservoir Simulation Study
6th Jan 20117:00 amRNSJolly Ranch Operations Update
31st Dec 201012:35 pmRNSPrice Monitoring Extension
30th Dec 20104:40 pmRNSSecond Price Monitoring Extn
30th Dec 20104:35 pmRNSPrice Monitoring Extension
21st Dec 20104:35 pmRNSPrice Monitoring Extension
6th Dec 20104:35 pmRNSPrice Monitoring Extension
3rd Dec 20103:16 pmRNSDirector/PDMR Shareholding
3rd Dec 20102:36 pmRNSTotal Voting Rights
1st Dec 20101:12 pmRNSResult of AGM
29th Nov 20107:00 amRNSStrategic Review
11th Nov 20107:00 amRNSDraw down of funds and issue of equity
20th Oct 20107:00 amRNSFinal Results
14th Oct 20107:00 amRNSGBP25 million Equity Financing Facility

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.