Proposed Directors of Tirupati Graphite explain why they have requisitioned an GM. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNighthawk Energy Regulatory News (HAWK)

  • There is currently no data for HAWK

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Devon Project Update

10 Mar 2009 07:00

RNS Number : 5798O
Nighthawk Energy plc
10 March 2009
 



Nighthawk Energy plc

Update on Commercialisation of Devon Project

The directors of Nighthawk Energy plc ("Nighthawk" or "the Company") (AIM: HAWK), the US focused hydrocarbon and production company, are pleased to announce an operational update on the commercialisation of the Devon Oilfield waterflood project, located in Bourbon County, Kansas. Nighthawk holds an 80 per cent. interest in the project which covers an area of 1,764 acres. Running Foxes Petroleum Inc. ("Running Foxes") is the operator and holds the remaining 20 per cent.

The Devon Oilfield, one of Nighthawk's six development and production projects located in the US mid-west, has seen strong progress during the last six months, including:

Continuing drilling success
The ongoing construction of production and sales off-take facilities at the Vogel, Graham and Cleaver locations
Further construction of surface facilities
Expansion of the water injection process throughout the project area

Discovery of a new natural gas reservoir within the Graham area of the project

To date, Nighthawk has invested approximately US$6 million net in the Devon Oilfield project. All the wells drilled have targeted the Bartlesville channel sandstones at shallow depths of between 350 and 500 feet. The current status of drilling is as follows:

34 oil wells on primary production awaiting waterflooding to take effect
29 wells awaiting completion for production and tie in to surface facilities
11 wells drilled, cased and cemented for production
6 wells shut in awaiting infrastructure
15 injector wells injecting water
6 test wells designed to define the edges of the Bartlesville reservoir plugged and abandoned
20 wells permitted for future drilling

The current drilling success rate for the Devon Oilfield is 94 per cent., an excellent rate for any development project.

The rate of primary production is increasing as more wells are brought on stream and is on target to be in excess of 100 barrels of oil per day equivalent (gross), by 31 March 2009. The Directors expect this rate to increase markedly as additional wells are brought on stream.

Primary oil production should be considered a bonus prior to the waterflood process taking effect and a major positive indication. The water injection process is ongoing and the full effect on production is only expected to be observed during Summer 2009.  At this stage of development, it is not possible to accurately predict optimum production levels, however, expectations currently range from 500 to 1,500 barrels per day (gross) for the developed acreage at the Devon Oilfield.

In addition to the oil production, a new and positive development is the discovery of a primarily natural gas reservoir at the Devon project, as announced o19 February 2009. The Graham 6-36D-3 well was tested from the Lower Bartlesville formation at a depth of 430 to 438 feet resulting in a stabilised open flow test of 627 MCFGPD (thousand cubic feet of gas per day) through a one inch choke.

The well has been hooked up to a local pipeline and gathering system and natural gas is now producing at a choked off rate of 210 MCFGPD per day, a significant increase on production last reported of 160 MCFGPD.

A further five wells have subsequently been drilled with similar results to the Graham 6-36D-3 well and have all been cased as producers from the same Bartlesville formation. These wells are expected be hooked up to a pipeline and sale of product to commence within the next ten days.

David Bramhill, Managing Director, commented "Running Foxes is making excellent progress on the continuing development of the Devon Oilfield. We currently have six projects that are either in early production or at the development stage. It is interesting to note that our Buchanan Group waterflood projects located in neighbouring Missouri, and contiguous to the Devon Oilfield with similar geology, cover in excess of 40,000 acres, a multiple of 24 times that at the Devon Oilfield.

"With the ongoing and successful development of our core projects, namely Jolly Ranch, Buchanan Group and the Devon Oilfield, expectations remain high.  The current financial environment does not allow the value being created to be reflected in the share price. However, with our project portfolio, we believe we have the opportunity to build Nighthawk into a successful mid-tier enterprise within a reasonable timeframe When the eventual upturn in both general market confidence and oil and gas prices happens, Nighthawk will be well positioned to benefit."

David Racher B.Sc (Hons) Geology, who is a consultant to Nighthawk and has over 37 years of experience in the hydrocarbons industry and previously managed the Lasmo plc onshore US portfolio in KansasLouisianaSouth DakotaTexas and Wyoming, has approved the technical information contained in this announcement.

Enquiries:

Nighthawk Energy plc

David Bramhill, Managing Director

Tim Heeley, Commercial Director

01271 882160

020 7887 1454

07956 525433

office@nighthawkenergy.net

www.nighthawkenergy.net

Hanson Westhouse Limited 

Tim Feather

Matthew Johnson

0113 246 2610

tim.feather@hansonwesthouse.com

matthew.johnson@hansonwesthouse.com

Bishopsgate Communications Limited

Nick Rome

020 7562 3395

nick@bishopsgatecommunications.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCJLMPTMMBMBBL
Date   Source Headline
30th Nov 20167:00 amRNSProduction Update
16th Nov 20164:40 pmRNSSecond Price Monitoring Extn
16th Nov 20164:35 pmRNSPrice Monitoring Extension
11th Nov 201610:15 amRNSUpdate re Water Flood Pilot Project
1st Nov 20167:00 amRNSUpdate re Water Flood Pilot Project
30th Sep 20167:00 amRNSHalf-year Report
20th Sep 20164:35 pmRNSPrice Monitoring Extension
20th Sep 20167:00 amRNSSettlement of litigation
9th Sep 20167:00 amRNSCompany Update
9th Aug 20164:35 pmRNSPrice Monitoring Extension
3rd Aug 20167:00 amRNSWater Flood Pilot Project Update
1st Aug 20167:00 amRNSWater Flood Financing and Amendment of Loan Notes
27th Jul 20164:40 pmRNSSecond Price Monitoring Extn
27th Jul 20164:35 pmRNSPrice Monitoring Extension
14th Jul 20164:40 pmRNSSecond Price Monitoring Extn
14th Jul 20164:35 pmRNSPrice Monitoring Extension
1st Jul 20164:40 pmRNSSecond Price Monitoring Extn
1st Jul 20164:35 pmRNSPrice Monitoring Extension
30th Jun 201611:01 amRNSResult of AGM
30th Jun 20167:00 amRNSBanking Agreement
28th Jun 20167:00 amRNSProduction Update
10th Jun 20167:00 amRNSBank Negotiation Update
8th Jun 20167:00 amRNSWater Flood Approval
2nd Jun 20167:00 amRNSFinal Results
20th May 20164:40 pmRNSSecond Price Monitoring Extn
20th May 20164:35 pmRNSPrice Monitoring Extension
16th May 20163:17 pmRNSBank Negotiation
11th May 20167:00 amRNSWater Flood Approval Update
4th May 20167:00 amRNSWater Flood Approval and Year End Reserves Update
29th Apr 20167:00 amRNSBank negotiation
18th Apr 20167:00 amRNSBank Negotiation
5th Apr 20162:49 pmRNSProduction Update - Correction
5th Apr 20167:00 amRNSLitigation Update
1st Apr 20167:00 amRNSBorrowing Base Redetermination & Production Update
10th Mar 20164:20 pmRNSWater Flood Approval and Year End Reserves Update
4th Mar 20164:35 pmRNSPrice Monitoring Extension
4th Mar 20163:39 pmRNSHolding(s) in Company
19th Feb 20164:35 pmRNSPrice Monitoring Extension
12th Feb 20164:40 pmRNSSecond Price Monitoring Extn
12th Feb 20164:35 pmRNSPrice Monitoring Extension
8th Feb 20164:35 pmRNSPrice Monitoring Extension
1st Feb 20167:00 amRNSProduction Update
27th Jan 20164:35 pmRNSPrice Monitoring Extension
26th Jan 20164:35 pmRNSPrice Monitoring Extension
25th Jan 20164:35 pmRNSPrice Monitoring Extension
22nd Jan 20164:40 pmRNSSecond Price Monitoring Extn
22nd Jan 20164:35 pmRNSPrice Monitoring Extension
21st Jan 20164:40 pmRNSSecond Price Monitoring Extn
21st Jan 20164:35 pmRNSPrice Monitoring Extension
20th Jan 20164:40 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.