Adrian Hargrave, CEO of SEEEN, explains how the new funds will accelerate customer growth Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNighthawk Energy Regulatory News (HAWK)

  • There is currently no data for HAWK

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Devon and Buchanan Update

3 Jun 2009 07:00

RNS Number : 2488T
Nighthawk Energy plc
03 June 2009
 



Nighthawk Energy plc

Quantification of the Devon Oilfield and Buchanan Group Waterflood Projects

Well Status at Devon Oilfield and Buchanan Group Projects

The directors of Nighthawk Energy plc ("Nighthawk" or "the Company") (AIM : HAWK), the US focused hydrocarbon production and development company are pleased to announce the quantification of the Company`s subsurface assets in respect of the Devon Oilfield ("Devon") and Buchanan Group ("Buchanan") waterfloods and a well status report on both projects.

Nighthawk holds an 80 and 50 per cent. working interest in the Devon and Buchanan projects respectively. The operator, Running Foxes Petroleum Inc., holds the remaining equity.

The last 18 months has seen ongoing major drilling campaigns being conducted on both projects. Numerous wells have been drilled and in-house evaluations completed Nighthawk is now in a position to mandate third party expertise to provide an independent review in respect of the Devon and the Buchanan projects as part of the overall strategy to define value within the portfolio.

Oilfield Production Consultants Ltd ("OPC") has been commissioned by Nighthawk to complete this exercise which will also include the calculation of the oil in place ("OIP") in the core areas of the projects as well as in the peripheral areas where development is ongoing. OPC are calculating the OIP in the reservoir intervals using both probabilistic and deterministic methods. These exercises include the review and assessment of open hole log analysis, core and production data, reservoir rock petrophysical properties and the determination of reservoir fluid saturations and productivity.

In addition, 3-D Petrel petrophysical models are to be generated.  These models will provide information to calculate the OIP, provide 3-D visualisation of the prospective waterflood intervals and assist in the compilation of structure and net isopach maps. 

Analysis for the first of these reports covering the Devon project is well advanced and the current preliminary results are considered to be well in line, if not markedly better, than Company expectations. Final results are anticipated before the end of June. 

Evaluation for Buchanan, which is a considerably larger project area than Devon, is underway Results of this study are expected during Q3 2009.

Well Status at Devon Oilfield and Buchanan Group Projects

Devon

The Devon project covers an area of approximately 3,000 acres and is located in Bourbon CountyKansas.

138 wells have been successfully drilled or currently permitted on the project, of which the status is as follows:

Producing

54

Awaiting completion

43

Shut in

7

Injection

16

Permitted

18

Buchanan

The Buchanan project covers approximately 32,000 acres and is located in Vernon and Bates CountiesMissouri.

109 wells have been successfully drilled or are currently permitted on the project, of which the status is as follows:

Producing

39

Awaiting completion

36

Injection

7

Permitted

27

Both Devon and Buchanan projects are at various stages of water injection. Primary oil and natural gas production continues on both projects and product is being sold. Once the impact of this water injection process takes effect the expected production rates range between 5-20 barrels of oil per day per well.

For optimum recovery, wells are orientated in a "five spot" pattern on ten acre spacing at Devon and Buchanan. On this basis there are in excess of 3,500 potential well sites within the current project area.

Pipelines, surface facilities, pump jacks and other production infrastructure continue to be installed at both projects and drilling is ongoing.

Managing Director, David Bramhill, commented "To now be in a position with Devon and Buchanan to be able to obtain independent opinion in respect of our subsurface resources is a major step forward and a further milestone in Nighthawk`s project development plan.  Preliminary indications of oil in place at Devon, as calculated by OPC are particularly pleasing and support the pace and magnitude of the development programmes being seen at Devon and the nearby Buchanan project."

Enquiries:

Nighthawk Energy plc

David Bramhill, Managing Director

Tim Heeley, Commercial Director

07914 050512

07956 525433 

020 7887 1454

Hanson Westhouse Limited 

Tim Feather

Matthew Johnson

020 7601 6100

tim.feather@hansonwesthouse.com

matthew.johnson@hansonwesthouse.com

Bishopsgate Communications Limited

Nick Rome

020 7562 3395

nick@bishopsgatecommunications.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDLLFBKQBEBBL
Date   Source Headline
31st Aug 20114:35 pmRNSPrice Monitoring Extension
25th Aug 20114:27 pmRNSChange of Adviser
17th Aug 20114:35 pmRNSPrice Monitoring Extension
12th Aug 20114:40 pmRNSSecond Price Monitoring Extn
12th Aug 20114:35 pmRNSPrice Monitoring Extension
9th Aug 20112:13 pmRNSHolding(s) in Company
4th Aug 20114:40 pmRNSSecond Price Monitoring Extn
4th Aug 20114:35 pmRNSPrice Monitoring Extension
3rd Aug 20117:00 amRNSQ2 Production and Operations Update
27th Jul 20114:36 pmRNSPrice Monitoring Extension
19th Jul 20117:00 amRNSAppointment of Chief Operating Officer
13th Jul 20114:35 pmRNSPrice Monitoring Extension
11th Jul 20114:40 pmRNSSecond Price Monitoring Extn
11th Jul 20114:35 pmRNSPrice Monitoring Extension
6th Jul 20117:00 amRNSChange of Registered Office
4th Jul 20114:35 pmRNSPrice Monitoring Extension
29th Jun 20114:04 pmRNSDirector/PDMR Shareholding
28th Jun 20113:14 pmRNSDirector/PDMR Shareholding
14th Jun 20114:35 pmRNSPrice Monitoring Extension
14th Jun 20119:41 amRNSDirectorate Change
9th Jun 20114:35 pmRNSPrice Monitoring Extension
7th Jun 20114:35 pmRNSPrice Monitoring Extension
2nd Jun 20114:35 pmRNSPrice Monitoring Extension
1st Jun 20117:00 amRNSGrant of Options
26th May 20117:00 amRNSDirector/PDMR Shareholding
18th May 20117:00 amRNSJolly Ranch Q1 2011 Production & Operations Update
9th May 20114:35 pmRNSPrice Monitoring Extension
9th May 20117:00 amRNSAppointment of CFO
28th Apr 20117:00 amRNSJolly Ranch Reserves Report
30th Mar 201111:23 amRNSHolding(s) in Company
29th Mar 20117:00 amRNSHalf Yearly Report
8th Mar 20117:00 amRNSJolly Ranch Operations Update & Drilling Schedule
4th Mar 201111:10 amRNSElectronic Communication with Shareholders
1st Mar 20117:00 amRNSTotal Voting Rights
8th Feb 20117:00 amRNSJolly Ranch Quarterly Production Update
1st Feb 20117:00 amRNSDraw down of funds and issue of equity
24th Jan 20117:00 amRNSJolly Ranch Reservoir Simulation Study
6th Jan 20117:00 amRNSJolly Ranch Operations Update
31st Dec 201012:35 pmRNSPrice Monitoring Extension
30th Dec 20104:40 pmRNSSecond Price Monitoring Extn
30th Dec 20104:35 pmRNSPrice Monitoring Extension
21st Dec 20104:35 pmRNSPrice Monitoring Extension
6th Dec 20104:35 pmRNSPrice Monitoring Extension
3rd Dec 20103:16 pmRNSDirector/PDMR Shareholding
3rd Dec 20102:36 pmRNSTotal Voting Rights
1st Dec 20101:12 pmRNSResult of AGM
29th Nov 20107:00 amRNSStrategic Review
11th Nov 20107:00 amRNSDraw down of funds and issue of equity
20th Oct 20107:00 amRNSFinal Results
14th Oct 20107:00 amRNSGBP25 million Equity Financing Facility

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.