Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNighthawk Energy Regulatory News (HAWK)

  • There is currently no data for HAWK

Devon and Buchanan Update

3 Jun 2009 07:00

RNS Number : 2488T
Nighthawk Energy plc
03 June 2009
Β 

ο»Ώ

Nighthawk Energy plc

QuantificationΒ ofΒ theΒ DevonΒ Oilfield and Buchanan GroupΒ Waterflood Projects

Well Status atΒ DevonΒ Oilfield and Buchanan Group Projects

The directors of Nighthawk Energy plc ("Nighthawk" or "the Company") (AIM : HAWK), the US focused hydrocarbon production and development companyΒ are pleased to announceΒ the quantification of the Company`s subsurface assets in respect of the Devon OilfieldΒ ("Devon")Β and Buchanan GroupΒ ("Buchanan")Β waterfloodsΒ and a well status report on both projects.

NighthawkΒ holds an 80 and 50 per cent. working interest in theΒ DevonΒ and BuchananΒ projects respectively. The operator, Running FoxesΒ Petroleum Inc.,Β holds the remaining equity.

The last 18 months has seen ongoing major drilling campaigns being conductedΒ onΒ both projects. Numerous wells have been drilledΒ and in-houseΒ evaluations completed.Β Β Nighthawk is now in a position to mandate third party expertise to provide an independent reviewΒ in respect of theΒ DevonΒ and the BuchananΒ projects as part of the overall strategy to define value within the portfolio.

Oilfield Production Consultants Ltd ("OPC") has been commissioned by NighthawkΒ to complete this exercise which willΒ alsoΒ include the calculation ofΒ theΒ oil in place ("OIP")Β in the core areas of the projects as well asΒ in the peripheral areas where development isΒ ongoing. OPC are calculating the OIP in the reservoir intervals using both probabilistic and deterministic methods. These exercises include theΒ review and assessment of open hole log analysis, core and production data, reservoir rock petrophysical propertiesΒ and the determination of reservoir fluid saturations and productivity.

In addition, 3-D Petrel petrophysical models are to be generated.Β Β These models will provide information to calculate the OIP, provide 3-D visualisation of the prospective waterflood intervals and assist in the compilation of structure and net isopach maps.Β 

Analysis for the first of these reports coveringΒ theΒ DevonΒ projectΒ is well advanced and the current preliminary results are considered to beΒ well in line, if notΒ markedlyΒ better,Β than CompanyΒ expectations. Final resultsΒ are anticipated before the end of June.Β 

Evaluation for Buchanan,Β which isΒ a considerably larger project area thanΒ Devon,Β is underway.Β Β ResultsΒ of this studyΒ are expected during Q3 2009.

Well Status atΒ DevonΒ Oilfield and Buchanan Group Projects

Devon

The Devon project covers an area of approximately 3,000 acres and is located inΒ Bourbon County,Β Kansas.

138 wells have beenΒ successfullyΒ drilled orΒ currentlyΒ permitted on theΒ project,Β of which theΒ status is as follows:

Producing

54

Awaiting completion

43

Shut in

7

Injection

16

Permitted

18

Buchanan

The Buchanan project covers approximately 32,000 acres and is located inΒ VernonΒ andΒ Bates Counties,Β Missouri.

109Β wells have been successfully drilled orΒ are currentlyΒ permitted on the project,Β of which theΒ status is as follows:

Producing

39

Awaiting completion

36

Injection

7

Permitted

27

BothΒ DevonΒ and Buchanan projects are at various stages of water injection. Primary oilΒ and natural gasΒ production continues on both projects and product is being sold. Once the impact ofΒ thisΒ water injectionΒ processΒ takes effect theΒ expected production ratesΒ range between 5-20 barrels of oil per dayΒ per well.

For optimum recovery, wells are orientated in a "five spot" pattern on ten acreΒ spacing atΒ DevonΒ and Buchanan. On this basis there are in excess of 3,500Β potential well sites within the current project area.

Pipelines, surface facilities, pump jacksΒ and other production infrastructure continue to be installed at both projects and drilling is ongoing.

Managing Director, David Bramhill, commented "To now be in a position with Devon and Buchanan to be able to obtain independent opinionΒ in respect of our subsurface resourcesΒ is a major step forward and aΒ furtherΒ milestone in Nighthawk`s project development plan.Β Β Preliminary indications of oil in place atΒ Devon, as calculated by OPCΒ are particularly pleasing and supportΒ theΒ pace and magnitude of theΒ development programmesΒ being seen atΒ DevonΒ and the nearby Buchanan project."

Enquiries:

Nighthawk Energy plc

David Bramhill, Managing Director

Tim Heeley, Commercial Director

07914 050512

07956 525433Β 

020 7887Β 1454

Hanson Westhouse LimitedΒ 

TimΒ Feather

Matthew Johnson

020 7601 6100

tim.feather@hansonwesthouse.com

matthew.johnson@hansonwesthouse.com

Bishopsgate Communications Limited

Nick Rome

020 7562 3395

nick@bishopsgatecommunications.com

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
DRLDLLFBKQBEBBL
Date   Source Headline
19th Jul 20187:00 amRNSUpdate on Chapter 11 cases
29th Jun 20187:00 amRNSChapter 11 update and resignation of Nomad
26th Jun 20187:00 amRNSUpdate on Chapter 11 cases
11th Jun 20187:00 amRNSCancellation of GM and Chapter 11 Update
31st May 20183:06 pmRNSNotice of General Meeting
16th May 20187:00 amRNSChapter 11 update
14th May 20185:48 pmRNSUpdate on Chapter 11 proceedings
10th May 20187:00 amRNSRequisition of general meeting
4th May 20185:17 pmRNSDirectorate Change
1st May 20187:30 amRNSSuspension - Nighthawk Energy Plc
1st May 20187:00 amRNSNotice of Chapter 11 and Suspension
20th Apr 20187:00 amRNSUpdate on CBA Loan
11th Apr 20187:00 amRNSProduction update
23rd Mar 20187:00 amRNSProduction update
28th Feb 201810:22 amRNSSenior management appointment
20th Feb 20187:00 amRNSProduction Update
14th Feb 20187:00 amRNSSenior management change
25th Jan 20187:00 amRNSAppointment of US Investment Bank
12th Jan 20187:00 amRNSProduction Update
5th Jan 20185:19 pmRNSHolding(s) in Company
28th Dec 20177:00 amRNSAmendment to Existing Bank Agreement
28th Nov 20178:30 amRNSProduction update
22nd Nov 20177:00 amRNSResource Update
7th Nov 20177:00 amRNSDirectorate Change
1st Nov 20177:00 amRNSFarmout Option Agreement
25th Oct 20177:00 amRNSCompany Update
3rd Oct 20177:00 amRNSReserves Based Loan Covenant Compliance
26th Sep 20177:00 amRNSHalf-year Report
14th Sep 20177:00 amRNSCompany Update
30th Aug 20177:00 amRNSAmendment of Loan Notes
3rd Aug 20177:00 amRNSCompany Presentation and Operational Update
3rd Jul 20177:00 amRNSBanking Agreement
23rd Jun 201710:36 amRNSProduction Update and Result of AGM
31st May 20179:36 amRNSReserves Based Loan Covenant Compliance
26th May 20174:03 pmRNSFinal Results
2nd May 20177:00 amRNSReserves Based Loan Covenant Compliance
26th Apr 20177:00 amRNSProduction update
5th Apr 20174:16 pmRNSResults of General Meeting
15th Mar 20177:00 amRNSNotice of GM - Rule 9 Waiver
15th Feb 20177:00 amRNSUpdate re Operations and Year-end Reserves
26th Jan 20177:00 amRNSCorrection - Production Update
24th Jan 20177:00 amRNSProduction Update
18th Jan 20174:35 pmRNSPrice Monitoring Extension
12th Jan 20177:00 amRNSOperations Update
3rd Jan 20177:00 amRNSCompany Update
21st Dec 20164:35 pmRNSPrice Monitoring Extension
16th Dec 20167:00 amRNSMonarch JDA Settlement Agreement
12th Dec 20164:35 pmRNSPrice Monitoring Extension
7th Dec 20164:35 pmRNSPrice Monitoring Extension
2nd Dec 20164:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.