Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Sugarloaf Update Block B

14 Jan 2009 07:00

RNS Number : 6030L
Empyrean Energy PLC
14 January 2009
 



14 January 2009

Empyrean Energy PLC 

("Empyrean" or the "Company"; Ticker: (EME))

Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

Empyrean Energy Plc, the oil and gas explorer and producer with assets in Germany and the USA, provides the following update on operations on the Sugarloaf Project which is part of the Sugarkane Gas and Condensate Field:

Weston-1H

Empyrean has been advised by the Operator Texas Crude Energy Inc (TCEI) that on 13 January 2009 the well was drilling ahead at a measured depth of 12,935 ft within the target horizon of the Austin Chalk. During the week, an additional run was made once the well was landed out to condition and smooth the kick-off bend. Gas levels within the Chalk have increased from a background of 20 - 30 units to approximately 250 units.

Kowalik-1H

Empyrean has also been advised that the well has been cleaned out to the toe of the well (16,480 ft) with 4% KCl and a mud cleaning agent conveyed by coiled tubing. The cleanout removed a number of blockages over the bottom 1,500 ft section of well - a zone which encountered several strong flares during drilling. On initial flowback, the well flowed 131 barrels of oil, 577 thousand cubic feet of gas and 10 barrels of water over a 24 hour period which represents a small increase over the pre-washout rate. The well is continuing to unload.

Now that it has been confirmed that coiled tubing can be run to the bottom of the well, the forward plan for consideration is to conduct an acid stimulation of the bottom section of the well. The use of acid in Sugarloaf Area A wells is believed to have proved beneficial by enhancing the permeability of natural fractures. The timing of this operation is subject to finalisation of program design and availability of equipment.

Further updates will be provided following developments.

The information contained in this announcement was completed and reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.

For further information 

Empyrean Energy plc 

Tom Kelly

Tel: +44(0) 207 182 1746 

 

Blue Oar Securities Plc

Olly Cairns / Jerry Keen

Tel: (+61) 8 6430 1631 / (+44) 207 448 4400 

 

Jonathan Charles / Fiona Hyland

Conduit PR 

Tel: +44 (0) 207 429 6611 / +44 (0) 7791 892 509 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSFWSMLSUSEIF
Date   Source Headline
23rd Dec 20107:00 amRNSHalf Yearly Report
20th Dec 20107:25 amRNSSugarloaf Project Operations Update
10th Dec 201011:01 amRNSSugarloaf Project Operations and Production Update
29th Nov 20107:00 amRNSSugarloaf Project, ("Sugarloaf"), Block B, Texas
23rd Nov 20107:27 amRNSSugarloaf Project ("Sugarloaf") Block B, Texas USA
18th Nov 20109:01 amRNSDraw down of Convertible Loan Facility
18th Nov 20107:00 amRNSChange of Adviser
9th Nov 20107:39 amRNSHercules Prospect, onshore Texas
5th Nov 20107:30 amRNSRiverbend Project, onshore Texas
3rd Nov 20107:00 amRNSNominated adviser and broker change of name
28th Oct 20101:09 pmRNSHolding(s) in Company
26th Oct 20108:58 amRNSSugarloaf Project - Update
26th Oct 20108:58 amRNSSugarloaf Project - Update
26th Oct 20107:00 amRNSCompany Secretary and Principal Office Change
26th Oct 20107:00 amRNSCompany Secretary and Principal Office Change
22nd Oct 20109:55 amRNSConvertible Loan Facility
22nd Oct 20109:55 amRNSConvertible Loan Facility
22nd Oct 20107:28 amRNSHercules Prospect, onshore Texas
22nd Oct 20107:28 amRNSHercules Prospect, onshore Texas
14th Oct 20107:41 amRNSSugarloaf Project Block B Update
23rd Sep 20107:24 amRNSSugarloaf Project Block B Update
13th Sep 20109:16 amRNSHolding(s) in Company
13th Sep 20107:29 amRNSRiverbend Project Update
8th Sep 20107:00 amRNSSugarloaf Project Block B Update
6th Sep 20107:05 amRNSHercules Prospect, BP America Well Update
20th Aug 20107:15 amRNSRiverbend Project Update
13th Aug 20107:45 amRNSSugarloaf Project Block B Update
13th Aug 20107:41 amRNSBulletin Board investigation
5th Aug 20107:41 amRNSSugarloaf Project Block B Update
15th Jul 20107:43 amRNSSugarloaf Project Block B Update
6th Jul 20107:58 amRNSSugarloaf Project Block B Update
2nd Jul 20107:55 amRNSSugarloaf Project Block B Update
28th Jun 201012:11 pmRNSDirector/PDMR Shareholding
23rd Jun 201010:16 amRNSResult of AGM
17th Jun 20107:58 amRNSHercules Prospect Update
8th Jun 20107:37 amRNSSugarloaf Project Block B Update
4th Jun 20107:00 amRNSSugarloaf Project Block B Update
1st Jun 20107:52 amRNSCartwright No.1 well spuds
28th May 201011:30 amRNSGrant of Options
28th May 20107:00 amRNSNotice of AGM
28th May 20107:00 amRNSFinal Results
21st May 20107:21 amRNSSugarloaf Project Block B Update
5th May 20107:20 amRNSSugarloaf Project Block B Update
4th May 20108:08 amRNSSugarloaf Project Block B Update
4th May 20108:05 amRNSGlantal Project
22nd Apr 20107:38 amRNSSugarloaf Project Block B Update
19th Apr 20107:58 amRNSSugarloaf Project Block B Update
14th Apr 20108:45 amRNSFurther Placing brings total raise to ?3.6 million
13th Apr 20107:42 amRNSSugarloaf Project Block B Update
9th Apr 201011:44 amRNSPlacing to raise ?1.5m announcement replacement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.