Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Sugarloaf Block B Work Program

6 Oct 2009 07:17

RNS Number : 2897A
Empyrean Energy PLC
06 October 2009
 



6 October 2009

Empyrean Energy PLC 

("Empyrean" or the "Company"; Ticker: (EME))

Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

Sugarloaf Block B Work Program

Empyrean is pleased to announce that it has been advised by Texas Crude Energy Inc ("TCEI"), the operator of Block B on the Sugarloaf Project that is part of the Sugarkane Gas & Condensate Field ("Sugarkane") in onshore Texas, USA, that planning and initial preparatory work has commenced on the stimulation and completion program for the three existing horizontal wells within Block B. This work forms the first stage of the workscope required to be funded by Hilcorp Energy ("Hilcorp") to earn its interests as per the recently announced farmin deal.

The wells will be stimulated using a fracture design that is based upon recent operations within the Eagle Ford Shale trend as well as taking account of the specific nature of the Sugarkane field. TCEI has advised that the major part of the work program is likely to start in November 2009, subject to the availability of rigs and equipment. In preparation for the fracture stimulation operations shallow water wells will be drilled and holding pits will be dug at each well location. This work has commenced at the Weston-1H well.

Prior to this a rig will be mobilised to the Kowalik-1H well location to attempt to pull the slotted liner which was originally deployed in the horizontal open hole of this well. If successful the rig will then run and cement a conventional liner and the well will be fracture stimulated in similar fashion to that planned for the other two horizontal wells. If the slotted liner is unable to be recovered, it is likely that an acid stimulation will be attempted on the well. This alternative treatment has been successfully applied locally within the Austin Chalk.

In addition, planning has commenced for a 2010 drilling program as part of the recently announced farmin deal, with the first wells drilled in this program likely to be within Block B. Under the terms of the farmout agreement all 3 new horizontal wells must have started by mid-2011 for Hilcorp to qualify for its full interest in Sugarloaf.

Whilst this program of work remains subject to change, it does represent a significant acceleration of activity on Block B over the coming months. In addition to the Sugarloaf Block B wells, Hilcorp will also be involved in drilling up to 7 additional wells targeting the same play in adjoining acreage. As a result of this activity and the significant number of wells scheduled for drilling by competitor companies in the Eagle Ford Shale regional play near to the Sugarloaf Project, we can expect to see continuous improvement in the understanding of and value of our asset.

For further information 

Empyrean Energy plc 

Tom Kelly

Tel: +618 9321 6988 

Astaire Securities Plc

Shane Gallwey / Jerry Keen

Tel: +44 (0)207 448 4400 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAKEKEFKNFEE
Date   Source Headline
28th Jul 20061:30 pmRNSDrilling Report
20th Jul 20068:57 amRNSDrilling Report
5th Jul 20069:05 amRNSDrilling Update
8th Jun 20061:09 pmRNSOperations Update
7th Jun 20061:52 pmRNSDrilling Update
6th Jun 200611:04 amRNSNotice of AGM
1st Jun 200611:17 amRNSFinal Results
23rd May 20068:28 amRNSOperations Update
22nd May 20069:13 amRNSDrilling Timetable
16th May 20062:04 pmRNSDrilling Report
8th May 20069:58 amRNSDrilling Report
27th Apr 20068:23 amRNSDrilling Report
26th Apr 20063:25 pmRNSIssue of Equity
24th Apr 20067:01 amRNSHolding(s) in Company
18th Apr 20069:05 amRNSDrilling Report
13th Apr 20069:57 amRNSDrilling Report
6th Apr 20067:00 amRNSAcquisition
4th Apr 20064:50 pmRNSIssue of Equity
31st Mar 20068:52 amRNSDrilling Report
21st Mar 200611:27 amRNSDrilling Report
7th Mar 20065:08 pmRNSIssue of Equity
7th Mar 20067:57 amRNSDrilling Update
2nd Mar 20064:12 pmRNSIssue of Equity
27th Feb 20068:15 amRNSTesting update
20th Feb 20068:39 amRNSDrilling Report
16th Feb 20068:47 amRNSDrilling Update
14th Feb 20067:40 amRNSDrilling Report
31st Jan 20068:25 amRNSDrilling Update
17th Jan 200611:12 amRNSDrilling Update
13th Jan 20068:55 amRNSDrilling Report
30th Nov 20057:00 amRNSDrilling Report
21st Nov 200511:36 amRNSDrilling Report
26th Oct 20057:00 amRNSInterim Results
6th Oct 20059:33 amRNSStatement re New Project
30th Sep 20059:44 amRNSDrilling Report
27th Jul 200512:11 pmRNSAIM Admission

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.