Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Sugarloaf Block B Work Program

6 Oct 2009 07:17

RNS Number : 2897A
Empyrean Energy PLC
06 October 2009
 



6 October 2009

Empyrean Energy PLC 

("Empyrean" or the "Company"; Ticker: (EME))

Sugarloaf Project, ("Sugarloaf"), Block B, Texas USA

Sugarloaf Block B Work Program

Empyrean is pleased to announce that it has been advised by Texas Crude Energy Inc ("TCEI"), the operator of Block B on the Sugarloaf Project that is part of the Sugarkane Gas & Condensate Field ("Sugarkane") in onshore Texas, USA, that planning and initial preparatory work has commenced on the stimulation and completion program for the three existing horizontal wells within Block B. This work forms the first stage of the workscope required to be funded by Hilcorp Energy ("Hilcorp") to earn its interests as per the recently announced farmin deal.

The wells will be stimulated using a fracture design that is based upon recent operations within the Eagle Ford Shale trend as well as taking account of the specific nature of the Sugarkane field. TCEI has advised that the major part of the work program is likely to start in November 2009, subject to the availability of rigs and equipment. In preparation for the fracture stimulation operations shallow water wells will be drilled and holding pits will be dug at each well location. This work has commenced at the Weston-1H well.

Prior to this a rig will be mobilised to the Kowalik-1H well location to attempt to pull the slotted liner which was originally deployed in the horizontal open hole of this well. If successful the rig will then run and cement a conventional liner and the well will be fracture stimulated in similar fashion to that planned for the other two horizontal wells. If the slotted liner is unable to be recovered, it is likely that an acid stimulation will be attempted on the well. This alternative treatment has been successfully applied locally within the Austin Chalk.

In addition, planning has commenced for a 2010 drilling program as part of the recently announced farmin deal, with the first wells drilled in this program likely to be within Block B. Under the terms of the farmout agreement all 3 new horizontal wells must have started by mid-2011 for Hilcorp to qualify for its full interest in Sugarloaf.

Whilst this program of work remains subject to change, it does represent a significant acceleration of activity on Block B over the coming months. In addition to the Sugarloaf Block B wells, Hilcorp will also be involved in drilling up to 7 additional wells targeting the same play in adjoining acreage. As a result of this activity and the significant number of wells scheduled for drilling by competitor companies in the Eagle Ford Shale regional play near to the Sugarloaf Project, we can expect to see continuous improvement in the understanding of and value of our asset.

For further information 

Empyrean Energy plc 

Tom Kelly

Tel: +618 9321 6988 

Astaire Securities Plc

Shane Gallwey / Jerry Keen

Tel: +44 (0)207 448 4400 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAKEKEFKNFEE
Date   Source Headline
15th Aug 20088:00 amRNSAppointment of New Nominated
13th Aug 20087:54 amRNSSugarloaf Update, Block B
1st Aug 20087:30 amRNSSugarloaf Block A Update
31st Jul 20089:26 amRNSSugarloaf Update Block B
21st Jul 20087:42 amRNSSugarloaf Block B - Update
18th Jul 20087:13 amRNSSugarloaf - Block A-4 Update
10th Jul 20088:05 amRNSSugarloaf Block B - Update
30th Jun 20087:00 amRNSTotal Voting Rights
26th Jun 20081:45 pmRNSResult of AGM
24th Jun 20087:00 amRNSSugarloaf Block A Update
23rd Jun 20087:07 amRNSSugarloaf Block B Update
19th Jun 200810:10 amRNSHolding(s) in Company
10th Jun 20087:00 amRNSIssue of Equity
3rd Jun 20085:52 pmRNSHolding(s) in Company
3rd Jun 20082:42 pmRNSAnnual Report and Accounts
3rd Jun 20081:48 pmRNSNotice of AGM
28th May 20087:10 amRNSSugarloaf Block A
27th May 20087:00 amRNSTrading Statement
19th May 20087:03 amRNSSugarloaf Block B Update
7th May 20087:05 amRNSSugarloaf Block B Update
30th Apr 20088:10 amRNSSugarloaf Block A Update
23rd Apr 20089:56 amRNSHolding(s) in Company
21st Apr 20087:00 amRNSSugarloaf Block A Update
17th Apr 20087:10 amRNSSugarloaf Block A - Update
14th Apr 20087:15 amRNSSugarloaf Block A Update
17th Mar 20089:19 amRNSPartner Announcement
27th Feb 20082:39 pmRNSGrant of Options
19th Feb 200812:07 pmRNSStatement re Share Price
18th Feb 20087:54 amRNSProjects Update
11th Feb 20087:00 amRNSBondi Prospect Update
10th Jan 20082:16 pmRNSHolding(s) in Company
10th Jan 20089:36 amRNSBondi Update
18th Dec 20072:39 pmRNSHolding(s) in Company
14th Dec 20077:50 amRNSSugarloaf Block B Update
11th Dec 20071:15 pmRNSInterim Results
10th Dec 20077:33 amRNSBondi Prospect Update
6th Dec 20077:31 amRNSSugarloaf Block B Update
20th Nov 20078:58 amRNSSugarloaf Update
15th Nov 20077:05 amRNSDrilling Report
14th Nov 20079:06 amRNSDrilling Report
8th Nov 20077:46 amRNSDrilling Report
5th Nov 20079:02 amRNSDrilling Report
1st Nov 20077:59 amRNSDrilling Report
31st Oct 20077:12 amRNSDrilling Report
25th Oct 200711:36 amRNSHolding(s) in Company
24th Oct 20077:39 amRNSSugarloaf Update
18th Oct 20077:53 amRNSDrilling Report
10th Oct 20077:35 amRNSBondi Prospect Update
10th Oct 20077:00 amRNSSugarloaf Prospect Update
5th Oct 20077:00 amRNSSugarloaf - Drilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.