Rainbow Rare Earths Phalaborwa project shaping up to be one of the lowest cost producers globally. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.276
Bid: 0.225
Ask: 0.265
Change: -0.055 (-18.33%)
Spread: 0.04 (17.778%)
Open: 0.27
High: 0.276
Low: 0.27
Prev. Close: 0.30
EME Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Sugarloaf Update

20 Nov 2007 08:58

Empyrean Energy PLC20 November 2007 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Sugarloaf Prospect, ("Sugarloaf"), Block B, Texas USA ----------------------------------------------------- •Kennedy - 1 Well electric logs indicate several extended zones ofpotential gas pay for testing Empyrean, the AIM listed oil and gas explorer and producer with assets inGermany and USA today announces the following: Kennedy - 1 Well---------------- Well logging operations over the open horizontal portion of the Kennedy-1 wellhave been completed and a 4-1/2 inch liner is presently being run to themeasured total depth of 16,750 feet. Interpretation of the logs indicates several extended zones of potential pay inthe Austin Chalk upper zone. A liner is presently being run as the first step inan extensive fracture stimulation and testing program. The Kennedy-1 well log results are encouraging. We are still in the early stagesof appraising a new reservoir and stratigraphic play which will require thecareful selection of a fracture stimulation program to optimise the flow andrecoverability of hydrocarbons from this horizontal well. A further update willbe given when the date for commencement of the fracture stimulation and testingprogram becomes known. Sugarloaf-1 Well---------------- The well is currently shut-in and the Operator is preparing to run completiontubing in order to carry out longer term production and pressure tests. Since the last report on Wednesday 14th November, gas and condensate productionhas continued to decline and gas, condensate and water flows becameintermittent. During this test period gas was produced at a maximum rate of387,000 cubic feet per day. A total of 51 barrels of condensate and 391 barrelsof water (mostly frac fluid but with formation water being produced in thelatter stages of the test) were also recovered over the period. Analyses of the formation water are characteristic of a formation below theAustin Chalk and it is likely that the frac has penetrated to below the AustinChalk target zone and is allowing water production into the well. Further welltesting will be required in order to confirm the source of the formation waterand hydrocarbons. The Operator, Texas Crude Energy Inc. has advised that it does not expectfurther tests to be carried out on the Sugarloaf 2 and 3 (middle and upper)zones until the test on the Kennedy well has been concluded. Further updates will be provided following developments. The information contained in this announcement was completed and reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. For further information:Charlie Geller/ Ed PortmanConduit PRTel: +44 (0) 207 429 6605/+44 (0) 7979955923 Rod VenablesHB CorporateTel: +44(0) 207 510 8600 Empyrean Energy plcTel : +44(0) 207 182 1746 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
13th Jun 20247:00 amRNSBlock 29/11 China update
5th Apr 20247:00 amRNSDirector/PDMR Shareholding
28th Mar 20247:57 amRNSMako Gas Sale Key Terms Signed with PGN
23rd Feb 20247:39 amRNSMinisterial Approval of Mako Gas Price
13th Feb 20247:00 amRNSEmpyrean completes £700,000 Placing
31st Jan 20247:00 amRNSDuyung PSC Update
18th Dec 202311:34 amRNSInterim Results
20th Nov 20232:40 pmRNSChange of Nominated Adviser
27th Sep 202312:58 pmRNSResult of AGM
15th Sep 20237:00 amRNSIssue of Salary Sacrifice Shares
12th Sep 20237:13 amRNSKey Terms Agreed for Long-Term Gas Sales Agreement
4th Sep 20237:00 amRNSPosting of Annual Report and Notice of AGM
1st Sep 202312:30 pmRNSFinal Results
30th May 20237:36 amRNSCapital raising, Debt Restructure & Company Update
2nd May 20237:00 amRNSMako gas field - Update
4th Jan 20234:40 pmRNSSecond Price Monitoring Extn
4th Jan 20234:35 pmRNSPrice Monitoring Extension
3rd Jan 20234:40 pmRNSSecond Price Monitoring Extn
3rd Jan 20234:35 pmRNSPrice Monitoring Extension
20th Dec 20227:00 amRNSInterim Results
23rd Nov 20224:36 pmRNSPrice Monitoring Extension
8th Nov 20227:00 amRNSMako Gas - Approval of Updated Plan of Development
19th Oct 20221:19 pmRNSResults of General Meeting
27th Sep 202212:54 pmRNSResult of AGM
26th Sep 202212:01 pmRNSPosting of Annual Report and Notice of GM
16th Sep 20227:08 amRNSFinal Results
9th Sep 20227:00 amRNSMako Gas Project - Updated Plan of Development
2nd Sep 20229:04 amRNSPosting of Notice of Annual General Meeting
10th Jun 20227:00 amRNSSecond phase of exploration for Topaz Prospect
7th Jun 20227:00 amRNSChange of Registered Office Address
23rd May 20228:40 amRNSHolding(s) in Company
12th May 20224:41 pmRNSSecond Price Monitoring Extn
12th May 20224:36 pmRNSPrice Monitoring Extension
10th May 202211:45 amRNSCapital raising, drill analysis & debt restructure
4th May 20227:33 amRNSProposed drilling of Topaz Prospect
27th Apr 20227:00 amRNSJade well reached Total Depth
25th Apr 202211:59 amRNSHolding(s) in Company
21st Apr 20228:37 amRNSExercise of Warrants
19th Apr 20227:00 amRNSBlock 29/11, China - Jade drilling update
13th Apr 20227:43 amRNSDrilling update at Jade prospect
11th Apr 202212:32 pmRNSExercise of Warrants
11th Apr 20227:00 amRNSDrilling commences at Jade prospect
8th Apr 20229:55 amRNSExercise of Warrants
8th Apr 20227:00 amRNSBlock 29/11, China - NH9 rig on Jade location
4th Apr 20227:00 amRNSBlock 29/11, China – NH9 rig to mobilise
30th Mar 20228:16 amRNSBlock 29/11, China - Jade well update
28th Mar 20228:01 amRNSPartial Conversion of Convertible Note
25th Mar 20227:34 amRNSRig Mobilisation and Anticipated Spud Date
16th Mar 20229:52 amRNSPartial Conversion of Convertible Note
11th Mar 20227:42 amRNSBlock 29/11, China – Jade drilling update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.