The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.495
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.19 (47.50%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.495
EME Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Block 29/11, China - Jade drilling update

19 Apr 2022 07:00

RNS Number : 5567I
Empyrean Energy PLC
19 April 2022
 

This announcement contains inside information

 

Empyrean Energy Plc / Index: AIM / Epic: EME / Sector: Oil & Gas

 

Empyrean Energy plc

 

Block 29/11, China - Elevated methane (C1) recorded in interpreted "Gas Cloud" zone

 

19 April 2022

 

Empyrean Energy plc ("Empyrean" or the "Company"), the oil and gas development company with interests in China, Indonesia and the United States, is pleased to provide the following update on drilling at the Jade prospect at its 100% owned Block 29/11 permit, offshore China:

 

HIGHLIGHTS

 

· LH 17-2-1 well at the Jade prospect drilled 12-1/4" section to 2150 metres Measured Depth ("MD")

o Elevated methane (C1) ranging from 227ppm to 15440 ppm was recorded while drilling 12-1/4" section.

o Higher values of methane (C1) ranging from 4190 ppm to 15440 ppm were recorded in the pre-drill interpreted "gas cloud" zone between 1550 metres to 1800 metres MD.

o CNOOC has confirmed comparable methane ranges in their oil discovery well LH 23-1-1d that is located 10km Southwest of the Jade prospect which also had a "gas cloud" feature

· Drilling results have validated the pre-drill interpretation of seismic data including the presence of gas clouds over the Jade as well as Topaz prospects

· Based on the results thus far, Empyrean has upgraded its internal Geological Chance of Success ("GCoS") over the Jade prospect from 41% to 65% and Topaz prospect from 35% to 47%

· Current operations are the installation of 9-5/8" casing before drilling 8-1/2" hole to the Total Depth ("TD") of 2860 metres MD

 

 

Empyrean is the operator of Block 29/11 in China and has 100% working interest during the exploration phase. In the event of a commercial discovery, its partner, China National Offshore Oil Company ("CNOOC"), may assume a 51% participating interest in the development and production phase.

 

Progress

 

The NH9 Semisubmersible drilling rig made excellent progress at LH 17-2-1 with the drilling of the 12-1/4" section to 2150 metres MD and current operations are preparations for running 9-5/8" casing.

 

During drilling of the 12-1/4" section, elevated methane (C1) ranging from 227 parts per million ("ppm") to 15440 ppm was recorded at the gas chromatograph during mudlogging. Negligible C2 and no C3 components were recorded. Higher values of methane (C1) ranging from 4190 ppm to 15440 ppm were recorded in the zone between 1550 metres to 1800 metres MD which was interpreted pre-drill to be a "gas cloud" zone.

 

During the drilling of this section, EME was in regular communication with CNOOC to fully understand and cross check the significance of elevated methane (C1) against CNOOC discovery wells. CNOOC has confirmed comparable methane ranges in their oil discovery well LH 23-1-1d that is located 10km Southwest of the Jade prospect. LH 23-1-1d also exhibited a gas cloud on seismic data. The elevated methane readings to date have validated the Company's pre-drill interpretation of seismic data, including the presence of a gas cloud in overburden above the Jade prospect, a feature also present over the Topaz prospect. It is also the case that two dry wells drilled by AMOCO in the 1990s on the eastern flank of Empyrean's Block 29/11 permit area did not display any gas clouds nor did they have elevated methane (C1) whilst drilling the same geological formation.

 

Based on the latest elevated methane (C1) readings, Empyrean has upgraded its internal Geological Chance of Success ("GCoS") for the Jade prospect from 41% to 65%. It has also upgraded the GCoS for its Topaz prospect from 35% to 47%.

 

Prospect

GCoS Factor (after gas cloud study) - pre drill

GCoS

Trap/ Seal

Reservoir

Source

Timing

Jade

0.9

0.95

0.68

0.7

41%

Topaz

0.9

0.85

0.7

0.65

35%

Prospect

GCoS Factor (after elevated C1) - during drilling

GCoS

Trap/ Seal

Reservoir

Source

Timing

Jade

0.9

0.95

0.95

0.8

65%

Topaz

0.9

0.85

0.95

0.65

47%

 

Forward plan

 

Following the setting of 9-5/8" casing, the 8-1/2" hole will be drilled to the TD of 2860 metres MD.

 

Well Objective

The 2021 drilling campaign is targeting a world class conventional oil target in the Jade prospect, to which Gaffney Cline & Associates ("GCA") assigned a GCoS of 32%. Subsequent to this independent assessment, the Company completed a gas cloud study and post stack seismic inversion study that it believes further mitigates risk and increases the GCoS to 41%. Following the elevated methane readings whilst drilling through the "gas cloud" zone, the internal Company GCoS is now 65%.

The Jade prospect has a GCA audited mean in place potential of 225 MMbbl and a P10 in place upside of 395 MMbbl. Four recent nearby discoveries by CNOOC immediately to the West of the Jade prospect are filled to their P10 potential or better. All four CNOOC discoveries have gas clouds showing in the overburden on seismic.

Empyrean's excellent quality 3D seismic indicates that there is a classic "fill to spill" geological setup in the basin, and a robust regional seal, that provides the Jade and Topaz prospects with a very real possibility of being filled in a similar fashion to nearby discoveries. The Jade and Topaz prospects both have gas clouds, similar to nearby discoveries, in the overburden on 3D seismic. Dry wells nearby do not have gas clouds. The Jade prospect is the first of the three identified prospects within Block 29/11, which also contains the Topaz and Pearl prospects. The combined audited mean in place potential of all three prospects is 884 MMbbl and a P10 in place upside of 1,588 MMbbl. The post stack seismic inversion study showed Jade and Topaz both have the potential for excellent carbonate buildup reservoir quality with excellent porosity and permeability. Any oil discovered is expected to be light oil in the 38-41 API range, similar to nearby discoveries. These attributes combined with the potential for exceptional natural reservoir drive supports the potential for excellent recovery rates.

The objective of the Jade well is to test for hydrocarbons down to TD of 2860 metres MD.

The information contained in this announcement has been reviewed by Empyrean's Executive Technical director, Gaz Bisht, who has over 31 years' experience as a hydrocarbon geologist and geoscientist.

 

 

Empyrean CEO, Tom Kelly, stated:

"The first technical objective of the Jade well has now been drilled. The validation of "gas clouds" through the presence of elevated methane levels in exactly the depth zone we interpreted on the excellent quality seismic data proves that the gas clouds exist and supports the Company's pre-drill interpretation that the methane is probably coming from light oil in the anticipated reservoir section. This is a major box now ticked, if we are to make a light oil discovery at Jade. The comparisons to nearby CNOOC discovery wells look very compelling. Drilling operations continue to run smoothly and safely, with progress to date right on schedule".

 

For further information please contact the following:

Empyrean Energy plc

Tom Kelly

Tel: +61 6146 5325

Cenkos Securities plc (Nominated Advisor and Broker)

Neil McDonald

Tel: +44 (0) 20 7297 8900

Pete Lynch

Pearl Kellie

First Equity (Joint Broker)

Jason Robertson

Tel: +44 (0) 20 7330 1883

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLILMATMTTBMTT
Date   Source Headline
5th Apr 20247:00 amRNSDirector/PDMR Shareholding
28th Mar 20247:57 amRNSMako Gas Sale Key Terms Signed with PGN
23rd Feb 20247:39 amRNSMinisterial Approval of Mako Gas Price
13th Feb 20247:00 amRNSEmpyrean completes £700,000 Placing
31st Jan 20247:00 amRNSDuyung PSC Update
18th Dec 202311:34 amRNSInterim Results
20th Nov 20232:40 pmRNSChange of Nominated Adviser
27th Sep 202312:58 pmRNSResult of AGM
15th Sep 20237:00 amRNSIssue of Salary Sacrifice Shares
12th Sep 20237:13 amRNSKey Terms Agreed for Long-Term Gas Sales Agreement
4th Sep 20237:00 amRNSPosting of Annual Report and Notice of AGM
1st Sep 202312:30 pmRNSFinal Results
30th May 20237:36 amRNSCapital raising, Debt Restructure & Company Update
2nd May 20237:00 amRNSMako gas field - Update
4th Jan 20234:40 pmRNSSecond Price Monitoring Extn
4th Jan 20234:35 pmRNSPrice Monitoring Extension
3rd Jan 20234:40 pmRNSSecond Price Monitoring Extn
3rd Jan 20234:35 pmRNSPrice Monitoring Extension
20th Dec 20227:00 amRNSInterim Results
23rd Nov 20224:36 pmRNSPrice Monitoring Extension
8th Nov 20227:00 amRNSMako Gas - Approval of Updated Plan of Development
19th Oct 20221:19 pmRNSResults of General Meeting
27th Sep 202212:54 pmRNSResult of AGM
26th Sep 202212:01 pmRNSPosting of Annual Report and Notice of GM
16th Sep 20227:08 amRNSFinal Results
9th Sep 20227:00 amRNSMako Gas Project - Updated Plan of Development
2nd Sep 20229:04 amRNSPosting of Notice of Annual General Meeting
10th Jun 20227:00 amRNSSecond phase of exploration for Topaz Prospect
7th Jun 20227:00 amRNSChange of Registered Office Address
23rd May 20228:40 amRNSHolding(s) in Company
12th May 20224:41 pmRNSSecond Price Monitoring Extn
12th May 20224:36 pmRNSPrice Monitoring Extension
10th May 202211:45 amRNSCapital raising, drill analysis & debt restructure
4th May 20227:33 amRNSProposed drilling of Topaz Prospect
27th Apr 20227:00 amRNSJade well reached Total Depth
25th Apr 202211:59 amRNSHolding(s) in Company
21st Apr 20228:37 amRNSExercise of Warrants
19th Apr 20227:00 amRNSBlock 29/11, China - Jade drilling update
13th Apr 20227:43 amRNSDrilling update at Jade prospect
11th Apr 202212:32 pmRNSExercise of Warrants
11th Apr 20227:00 amRNSDrilling commences at Jade prospect
8th Apr 20229:55 amRNSExercise of Warrants
8th Apr 20227:00 amRNSBlock 29/11, China - NH9 rig on Jade location
4th Apr 20227:00 amRNSBlock 29/11, China – NH9 rig to mobilise
30th Mar 20228:16 amRNSBlock 29/11, China - Jade well update
28th Mar 20228:01 amRNSPartial Conversion of Convertible Note
25th Mar 20227:34 amRNSRig Mobilisation and Anticipated Spud Date
16th Mar 20229:52 amRNSPartial Conversion of Convertible Note
11th Mar 20227:42 amRNSBlock 29/11, China – Jade drilling update
10th Mar 20227:00 amRNSEmpyrean moves to SETS trading platform

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.