Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.26
Bid: 0.22
Ask: 0.30
Change: 0.035 (15.56%)
Spread: 0.08 (36.364%)
Open: 0.225
High: 0.00
Low: 0.00
Prev. Close: 0.225
EME Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

31 Mar 2006 08:52

Empyrean Energy PLC31 March 2006 31 March 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Drilling UpdateAIM quoted Empyrean Energy PLC today announces the following update on the EagleNorth-1 well, California, USA: Victoria Petroleum NL as operator for the Eagle North-1 well has advised that atat 0600 hours Central Pacific Time today, that current operations at the EagleNorth-1 horizontal well was tripping at 4,032 metres (13,230 feet) to change thedrill bit and bottom hole assembly to drill ahead after having milled a newwindow in the casing at 4,028 metres (13,215 feet) and drilled new formation to4,032 metres (13,230 ft). An evaluation of the drilling difficulties previously experienced have resultedin a revision of the horizontal drilling plan and the adoption of a conservativemedium radius curve to achieve the horizontal well path into the target oilsands. This has required a new horizontal well to commence from a measured depth of4,028 metres (13,215 feet) in the vertical Eagle North-1 well bore. Further technical details are in the annexure to this announcement. A further update will be made as information becomes available. Executive Director - Tom Kelly commented "This is a very exciting time for ourcompany and we hope that testing can proceed smoothly from here as the delayshave been due to mechanical problems and do not diminish the technical merit ofthe project." The information contained in this announcement and annexure was completed andreviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc(Hons) who has over 40 years experience as a petroleum geologist. For further information Laurence Read/ Angus Prentice Toby Howell ChrisLambertConduit PR HB-Corporate Empyrean Energy plcTel: +44 (0) 207 429 6603 Tel: +44(0)207 510 8600 Tel : +44(0) 207 932 2442Mob: +44 (0) 7974 982 512 Annexure Using a less severe curve approach, which was successful in achieving ahorizontal well path in the previous Eagle-1 well, it is believed that theobjective of completing an oil producing horizontal well in the oil bearingsands between Eagle North-1 and Mary Bellochi-1 will be achieved. During the drilling of the horizontal well a 41/2 inch liner is planned to berun as an intermediate step to case off the Kreyenhagen shale at a measureddepth of 4,252 metres (13,950 feet). With the setting of the Kreyenhagen Shale behind the 41/2 inch liner theGatchell target oil sands will be drilled with a normal pressured water basedKCL-Clarizan mud minimising formation invasion and maximing the evaluation ofthe oil bearing potential of the oil sand. Following setting of the intermediate 41/2 inch liner which will put theKreyenhagen Shale behind pipe, a 3 3/4 inch horizontal well bore will then bedrilled over a distance of 320 metres to within 30 metres of the MaryBellocchi-1 oil well. This horizontal well bore will then be completed forproduction with a 2 7/8 inch slotted production liner. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
13th Jun 20247:00 amRNSBlock 29/11 China update
5th Apr 20247:00 amRNSDirector/PDMR Shareholding
28th Mar 20247:57 amRNSMako Gas Sale Key Terms Signed with PGN
23rd Feb 20247:39 amRNSMinisterial Approval of Mako Gas Price
13th Feb 20247:00 amRNSEmpyrean completes £700,000 Placing
31st Jan 20247:00 amRNSDuyung PSC Update
18th Dec 202311:34 amRNSInterim Results
20th Nov 20232:40 pmRNSChange of Nominated Adviser
27th Sep 202312:58 pmRNSResult of AGM
15th Sep 20237:00 amRNSIssue of Salary Sacrifice Shares
12th Sep 20237:13 amRNSKey Terms Agreed for Long-Term Gas Sales Agreement
4th Sep 20237:00 amRNSPosting of Annual Report and Notice of AGM
1st Sep 202312:30 pmRNSFinal Results
30th May 20237:36 amRNSCapital raising, Debt Restructure & Company Update
2nd May 20237:00 amRNSMako gas field - Update
4th Jan 20234:40 pmRNSSecond Price Monitoring Extn
4th Jan 20234:35 pmRNSPrice Monitoring Extension
3rd Jan 20234:40 pmRNSSecond Price Monitoring Extn
3rd Jan 20234:35 pmRNSPrice Monitoring Extension
20th Dec 20227:00 amRNSInterim Results
23rd Nov 20224:36 pmRNSPrice Monitoring Extension
8th Nov 20227:00 amRNSMako Gas - Approval of Updated Plan of Development
19th Oct 20221:19 pmRNSResults of General Meeting
27th Sep 202212:54 pmRNSResult of AGM
26th Sep 202212:01 pmRNSPosting of Annual Report and Notice of GM
16th Sep 20227:08 amRNSFinal Results
9th Sep 20227:00 amRNSMako Gas Project - Updated Plan of Development
2nd Sep 20229:04 amRNSPosting of Notice of Annual General Meeting
10th Jun 20227:00 amRNSSecond phase of exploration for Topaz Prospect
7th Jun 20227:00 amRNSChange of Registered Office Address
23rd May 20228:40 amRNSHolding(s) in Company
12th May 20224:41 pmRNSSecond Price Monitoring Extn
12th May 20224:36 pmRNSPrice Monitoring Extension
10th May 202211:45 amRNSCapital raising, drill analysis & debt restructure
4th May 20227:33 amRNSProposed drilling of Topaz Prospect
27th Apr 20227:00 amRNSJade well reached Total Depth
25th Apr 202211:59 amRNSHolding(s) in Company
21st Apr 20228:37 amRNSExercise of Warrants
19th Apr 20227:00 amRNSBlock 29/11, China - Jade drilling update
13th Apr 20227:43 amRNSDrilling update at Jade prospect
11th Apr 202212:32 pmRNSExercise of Warrants
11th Apr 20227:00 amRNSDrilling commences at Jade prospect
8th Apr 20229:55 amRNSExercise of Warrants
8th Apr 20227:00 amRNSBlock 29/11, China - NH9 rig on Jade location
4th Apr 20227:00 amRNSBlock 29/11, China – NH9 rig to mobilise
30th Mar 20228:16 amRNSBlock 29/11, China - Jade well update
28th Mar 20228:01 amRNSPartial Conversion of Convertible Note
25th Mar 20227:34 amRNSRig Mobilisation and Anticipated Spud Date
16th Mar 20229:52 amRNSPartial Conversion of Convertible Note
11th Mar 20227:42 amRNSBlock 29/11, China – Jade drilling update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.