Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Drilling Report

31 Mar 2006 08:52

Empyrean Energy PLC31 March 2006 31 March 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Drilling UpdateAIM quoted Empyrean Energy PLC today announces the following update on the EagleNorth-1 well, California, USA: Victoria Petroleum NL as operator for the Eagle North-1 well has advised that atat 0600 hours Central Pacific Time today, that current operations at the EagleNorth-1 horizontal well was tripping at 4,032 metres (13,230 feet) to change thedrill bit and bottom hole assembly to drill ahead after having milled a newwindow in the casing at 4,028 metres (13,215 feet) and drilled new formation to4,032 metres (13,230 ft). An evaluation of the drilling difficulties previously experienced have resultedin a revision of the horizontal drilling plan and the adoption of a conservativemedium radius curve to achieve the horizontal well path into the target oilsands. This has required a new horizontal well to commence from a measured depth of4,028 metres (13,215 feet) in the vertical Eagle North-1 well bore. Further technical details are in the annexure to this announcement. A further update will be made as information becomes available. Executive Director - Tom Kelly commented "This is a very exciting time for ourcompany and we hope that testing can proceed smoothly from here as the delayshave been due to mechanical problems and do not diminish the technical merit ofthe project." The information contained in this announcement and annexure was completed andreviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc(Hons) who has over 40 years experience as a petroleum geologist. For further information Laurence Read/ Angus Prentice Toby Howell ChrisLambertConduit PR HB-Corporate Empyrean Energy plcTel: +44 (0) 207 429 6603 Tel: +44(0)207 510 8600 Tel : +44(0) 207 932 2442Mob: +44 (0) 7974 982 512 Annexure Using a less severe curve approach, which was successful in achieving ahorizontal well path in the previous Eagle-1 well, it is believed that theobjective of completing an oil producing horizontal well in the oil bearingsands between Eagle North-1 and Mary Bellochi-1 will be achieved. During the drilling of the horizontal well a 41/2 inch liner is planned to berun as an intermediate step to case off the Kreyenhagen shale at a measureddepth of 4,252 metres (13,950 feet). With the setting of the Kreyenhagen Shale behind the 41/2 inch liner theGatchell target oil sands will be drilled with a normal pressured water basedKCL-Clarizan mud minimising formation invasion and maximing the evaluation ofthe oil bearing potential of the oil sand. Following setting of the intermediate 41/2 inch liner which will put theKreyenhagen Shale behind pipe, a 3 3/4 inch horizontal well bore will then bedrilled over a distance of 320 metres to within 30 metres of the MaryBellocchi-1 oil well. This horizontal well bore will then be completed forproduction with a 2 7/8 inch slotted production liner. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
13th Dec 20177:14 amRNSDirector Retirement
12th Dec 20173:15 pmRNSInterim Results
11th Dec 20179:46 amRNSDempsey and Sacramento Basin Q&A report
8th Dec 20177:57 amRNSDempsey 1-15 well production update
4th Dec 20177:38 amRNSDempsey Gas well update
14th Nov 20177:28 amRNSDempsey Gas Well Update
1st Nov 20177:12 amRNSDempsey Gas Well Update
4th Oct 20177:00 amRNSDempsey Gas Well Update
28th Sep 201712:26 pmRNSNew Company Website
18th Sep 20177:45 amRNSDempsey Gas Well to Flow Test Multiple Zones
13th Sep 20177:23 amRNSFurther Significant Gas Shows at Dempsey
12th Sep 201710:00 amRNSHolding(s) in Company
11th Sep 20171:03 pmRNSResults of AGM
11th Sep 201710:08 amRNSCorporate Presentation
8th Sep 20177:29 amRNSSignificant Gas Shows at Dempsey 1-15 Well
7th Sep 20177:00 amRNSSeismic Data Results Exceed Expectations
4th Sep 20177:26 amRNSSignificant Gas Shows Continue at Dempsey
1st Sep 20177:11 amRNSHolding(s) in Company
31st Aug 20177:22 amRNSSignificant Gas Shows Continue at Dempsey
30th Aug 20178:21 amRNSSignificant Gas Shows in reservoir at Dempsey
29th Aug 20177:00 amRNSSignificant Gas Shows
23rd Aug 20177:25 amRNS3D survey Completed in Block 29/11 Offshore China
21st Aug 20177:51 amRNSDempsey 1-15 Natural Gas Well Drilling Update
18th Aug 201710:17 amRNSPosting of Annual Report and Notice of AGM
15th Aug 20171:30 pmRNSFinal Results
14th Aug 20177:20 amRNSDempsey 1-15 Natural Gas Well Drilling Update
9th Aug 20177:20 amRNSDempsey 1-15 Natural Gas Well Drilling Update
3rd Aug 20177:37 amRNS1Tcf+ Dempsey Natural Gas Well Drilling Ahead
2nd Aug 20173:30 pmRNSRaises £1,000,000 before costs at 8.5p per share
1st Aug 20178:01 amRNSDrilling to commence at Dempsey Well, California
20th Jul 20177:47 amRNSOperations Update for 1+ Tcf Dempsey Gas Well
10th Jul 20177:02 amRNSDrilling Contract Signed for 1Tcf+ Dempsey Well
6th Jul 20177:10 amRNSDrilling Permit Granted for 1Tcf+ Dempsey Well
5th Jul 20178:09 amRNSCompletion of Mako Well and Stabilised Flow Rates
28th Jun 20177:38 amRNSMako South-1 Gas Flow Test Results
26th Jun 20177:48 amRNSMako South-1 Well Drilling and Testing Update
21st Jun 20177:53 amRNSIncreased interest in Sacramento Basin Projects
20th Jun 20175:31 pmRNSEmpyrean raises £660,000
19th Jun 201711:15 amRNSHolding(s) in Company
19th Jun 20178:17 amRNSMako South-1 Well Drilling Update
16th Jun 20177:45 amRNSProjects Update
15th Jun 20179:11 amRNSOperational Presentation
15th Jun 20178:00 amRNSHolding(s) in Company
14th Jun 20179:16 amRNSAppointment of Board Director
13th Jun 201711:10 amRNSPlacing and Option Exercise to Advance Portfolio
13th Jun 201710:00 amRNSOption Amendment
8th Jun 201711:00 amRNS3D Survey Commences on Block 29/11, China
30th May 201712:30 pmRNSProjects Update
15th May 20171:43 pmRNSMulti Project Farm-In, Sacramento Basin,California
15th May 20179:30 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.