Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Operations Update

17 Oct 2006 15:30

Empyrean Energy PLC17 October 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Operations Update - Eagle North-1 in California, USA AIM quoted Empyrean Energy Plc today announces the following update on the EagleNorth-1 well, San Joaquin Basin, California, USA. Victoria Petroleum NL as operator for the Eagle North-1 horizontal well on theEagle Oil Pool Development Project in the San Joaquin Basin has advised that thedeep workover rig at the Eagle North-1 location has completed fishing operationsand is currently preparing the Eagle North-1 well bore for a future re-entry andside track to drill, complete and test the lower Gatchell oil sand zone. It is not considered cost effective to continue operations to retrieve theproduction valve and tubing conveyed guns in the horizontal well bore. The jointventure partners have decided that the money spent continuing the work overwould best be spent on a future re-entry and side track from the current casedEagle North-1 well bore. Planning has commenced for this future operation with the exact timing of theoperation subject to the availability of the required deep drilling rig,equipment and personel. The target zone for the re-entry and side track will be the 177 metres (580feet) of the lower Mary Bellocchi Gatchell oil sand in the horizontal well boreover the interval from 4,209 - 4,386 metres (13,810 - 14,390 feet). The lower Gatchell oil sands have produced at rates of up to 223 barrels of oilper day and 0.7 million cubic feet of gas per day from the 12 metre (39 feet)interval of lower Mary Bellocchi sand in the Mary Bellocchi-1 vertical well, 366metres to the southeast. A successful Eagle North-1 horizontal well and its subsequent productionperformance in the longer term will provide an indication of the potential sizeof the Eagle Oil Pool. Empyrean's Commercial Director, Tom Kelly commented - "The Eagle Oil Poolremains a very attractive appraisal target as we know that oil is there - wejust need to flow test." The information contained in this announcement has been reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. For further information Angus Prentice/Laurence ReadConduit PRTel: +44 (0) 207 429 6603Mob: +44 (0) 79974 982512 Empyrean Energy plcTel : +44 (0) 207 932 2442 Imran Ahmad/ Cecil JordaanHB-CorporateTel: +44(0) 207 510 8600 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
23rd Dec 20107:00 amRNSHalf Yearly Report
20th Dec 20107:25 amRNSSugarloaf Project Operations Update
10th Dec 201011:01 amRNSSugarloaf Project Operations and Production Update
29th Nov 20107:00 amRNSSugarloaf Project, ("Sugarloaf"), Block B, Texas
23rd Nov 20107:27 amRNSSugarloaf Project ("Sugarloaf") Block B, Texas USA
18th Nov 20109:01 amRNSDraw down of Convertible Loan Facility
18th Nov 20107:00 amRNSChange of Adviser
9th Nov 20107:39 amRNSHercules Prospect, onshore Texas
5th Nov 20107:30 amRNSRiverbend Project, onshore Texas
3rd Nov 20107:00 amRNSNominated adviser and broker change of name
28th Oct 20101:09 pmRNSHolding(s) in Company
26th Oct 20108:58 amRNSSugarloaf Project - Update
26th Oct 20108:58 amRNSSugarloaf Project - Update
26th Oct 20107:00 amRNSCompany Secretary and Principal Office Change
26th Oct 20107:00 amRNSCompany Secretary and Principal Office Change
22nd Oct 20109:55 amRNSConvertible Loan Facility
22nd Oct 20109:55 amRNSConvertible Loan Facility
22nd Oct 20107:28 amRNSHercules Prospect, onshore Texas
22nd Oct 20107:28 amRNSHercules Prospect, onshore Texas
14th Oct 20107:41 amRNSSugarloaf Project Block B Update
23rd Sep 20107:24 amRNSSugarloaf Project Block B Update
13th Sep 20109:16 amRNSHolding(s) in Company
13th Sep 20107:29 amRNSRiverbend Project Update
8th Sep 20107:00 amRNSSugarloaf Project Block B Update
6th Sep 20107:05 amRNSHercules Prospect, BP America Well Update
20th Aug 20107:15 amRNSRiverbend Project Update
13th Aug 20107:45 amRNSSugarloaf Project Block B Update
13th Aug 20107:41 amRNSBulletin Board investigation
5th Aug 20107:41 amRNSSugarloaf Project Block B Update
15th Jul 20107:43 amRNSSugarloaf Project Block B Update
6th Jul 20107:58 amRNSSugarloaf Project Block B Update
2nd Jul 20107:55 amRNSSugarloaf Project Block B Update
28th Jun 201012:11 pmRNSDirector/PDMR Shareholding
23rd Jun 201010:16 amRNSResult of AGM
17th Jun 20107:58 amRNSHercules Prospect Update
8th Jun 20107:37 amRNSSugarloaf Project Block B Update
4th Jun 20107:00 amRNSSugarloaf Project Block B Update
1st Jun 20107:52 amRNSCartwright No.1 well spuds
28th May 201011:30 amRNSGrant of Options
28th May 20107:00 amRNSNotice of AGM
28th May 20107:00 amRNSFinal Results
21st May 20107:21 amRNSSugarloaf Project Block B Update
5th May 20107:20 amRNSSugarloaf Project Block B Update
4th May 20108:08 amRNSSugarloaf Project Block B Update
4th May 20108:05 amRNSGlantal Project
22nd Apr 20107:38 amRNSSugarloaf Project Block B Update
19th Apr 20107:58 amRNSSugarloaf Project Block B Update
14th Apr 20108:45 amRNSFurther Placing brings total raise to ?3.6 million
13th Apr 20107:42 amRNSSugarloaf Project Block B Update
9th Apr 201011:44 amRNSPlacing to raise ?1.5m announcement replacement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.