Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

Share Price is delayed by 15 minutes
Get Live Data
0.0575    0.00 (0.00%)
Bid:
0.055
Ask:
0.06
Spread: 0.005 (9.091%)
Market Cap: £3.29m
EME Live PriceLast checked at - London Stock Exchange

Intraday Empyrean Share Chart

Operations Update

17 Oct 2006 15:30

Empyrean Energy PLC17 October 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Operations Update - Eagle North-1 in California, USA AIM quoted Empyrean Energy Plc today announces the following update on the EagleNorth-1 well, San Joaquin Basin, California, USA. Victoria Petroleum NL as operator for the Eagle North-1 horizontal well on theEagle Oil Pool Development Project in the San Joaquin Basin has advised that thedeep workover rig at the Eagle North-1 location has completed fishing operationsand is currently preparing the Eagle North-1 well bore for a future re-entry andside track to drill, complete and test the lower Gatchell oil sand zone. It is not considered cost effective to continue operations to retrieve theproduction valve and tubing conveyed guns in the horizontal well bore. The jointventure partners have decided that the money spent continuing the work overwould best be spent on a future re-entry and side track from the current casedEagle North-1 well bore. Planning has commenced for this future operation with the exact timing of theoperation subject to the availability of the required deep drilling rig,equipment and personel. The target zone for the re-entry and side track will be the 177 metres (580feet) of the lower Mary Bellocchi Gatchell oil sand in the horizontal well boreover the interval from 4,209 - 4,386 metres (13,810 - 14,390 feet). The lower Gatchell oil sands have produced at rates of up to 223 barrels of oilper day and 0.7 million cubic feet of gas per day from the 12 metre (39 feet)interval of lower Mary Bellocchi sand in the Mary Bellocchi-1 vertical well, 366metres to the southeast. A successful Eagle North-1 horizontal well and its subsequent productionperformance in the longer term will provide an indication of the potential sizeof the Eagle Oil Pool. Empyrean's Commercial Director, Tom Kelly commented - "The Eagle Oil Poolremains a very attractive appraisal target as we know that oil is there - wejust need to flow test." The information contained in this announcement has been reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. For further information Angus Prentice/Laurence ReadConduit PRTel: +44 (0) 207 429 6603Mob: +44 (0) 79974 982512 Empyrean Energy plcTel : +44 (0) 207 932 2442 Imran Ahmad/ Cecil JordaanHB-CorporateTel: +44(0) 207 510 8600 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
9th Apr 20107:00 amRNSPlacing to raise ?1.5m
1st Apr 20101:03 pmRNSSugarloaf Project Block B Update
1st Apr 20107:35 amRNSConvertible Loan Facility
30th Mar 20107:40 amRNSRiverbend Project Quinn-3H Well Update
26th Mar 20107:37 amRNSHercules Prospect Update
25th Mar 20107:39 amRNSSugarloaf Project Block B Update
17th Mar 20107:42 amRNSAquarius Prospect, McMillan Well Update
17th Mar 20107:38 amRNSSugarloaf Project Block B Update
16th Mar 20102:33 pmRNSExercise of Options and Director Shareholdings
9th Mar 20107:41 amRNSBP America well reaches total depth on Hercules
9th Mar 20107:38 amRNSMcMillan Well spuds on the Aquarius Prospect
3rd Mar 20107:38 amRNSSugarloaf Project, Block B Update
24th Feb 20107:36 amRNSSugarloaf Project, Block B Update
23rd Feb 20107:42 amRNSHercules Prospect Update
19th Feb 20107:37 amRNSSugarloaf Project, Block B, Update
5th Feb 20108:08 amRNSSugarloaf Project Block B Update
4th Feb 20107:52 amRNSRiverbend Project, onshore Texas, USA
1st Feb 20107:38 amRNSSugarloaf Project Update
28th Jan 20107:34 amRNSSugarloaf Project Update
22nd Jan 20107:41 amRNSSugarloaf Project Update
15th Jan 20107:21 amRNSSugarloaf Project, Block B, Update
13th Jan 20109:00 amRNSRiverbend Project, onshore Texas, USA
7th Jan 20108:05 amRNSKowalik-1H update and new well preparations
30th Dec 20097:00 amRNSKowalik-1H Fracture Stimulation Program
23rd Dec 20098:23 amRNSSugarloaf Project, Block B, Texas USA
15th Dec 20097:39 amRNSParticipation in 10% of Aquarius Prject, Texas
10th Dec 20097:41 amRNSParticipation in 10% of Hercules Prospect, Texas
4th Dec 20093:21 pmRNSInterim Results
19th Nov 20097:00 amRNSSugarloaf Block B Update
16th Nov 20097:00 amRNSDrilling Report
10th Nov 20097:00 amRNSDrilling Report
30th Oct 20099:44 amRNSHolding(s) in Company
28th Oct 200910:01 amRNSHolding(s) in Company
6th Oct 20097:17 amRNSSugarloaf Block B Work Program
1st Oct 20099:01 amRNSHolding(s) in Company
21st Sep 20097:51 amRNSFarm-out of Block B Sugarloaf
18th Sep 20097:53 amRNSUpdate Eagle Oil Pool Development Project
10th Sep 200910:22 amRNSHolding(s) in Company
3rd Sep 20097:47 amRNSRiverbend Project commencement of operations
1st Sep 200910:43 amRNSHolding(s) in Company
17th Aug 20098:14 amRNSRiverbend Project update
13th Jul 200910:32 amRNSExercise of Options
8th Jul 200911:30 amRNSHolding(s) in Company
3rd Jul 20092:16 pmRNSResult of AGM
15th Jun 20097:00 amRNSChange of Name of Nominated Adviser and Broker
9th Jun 20099:59 amRNSHolding(s) in Company
8th Jun 20093:57 pmRNSNotice of AGM
4th Jun 20097:00 amRNSIssue of Equity
1st Jun 20098:19 amRNSPlacing of ?816,000, Farm-in to Riverbend Project
26th May 200912:20 pmRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.