Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

Share Price is delayed by 15 minutes
Get Live Data
0.245    0.00 (0.00%)
Bid:
0.23
Ask:
0.26
Spread: 0.03 (13.043%)
Market Cap: £8.68m
ECR Live PriceLast checked at - London Stock Exchange

Intraday ECR Minerals Share Chart

Renewable Energy Partnership

15 Jun 2010 10:17

MERCATOR GOLD plc ("Mercator Gold", "Mercator" or "the Company")

AIM: MCR US OTC: MTGDY

Renewable Energy Partnership

London 15 June 2010

Mercator Gold plc is pleased to announce that it has entered into a partnership with Remote Energy Solutions, LLC ("RES"), an established renewable energy developer, in relation to the Warm Springs solar power project ("the Warm Springs project") in New Mexico, USA. The Warm Springs project is being developed in close proximity to the Copper Flat copper-gold-molybdenum-silver project ("Copper Flat") by Mercator's subsidiary Warm Springs Renewable Energy Corporation ("WSREC").

Highlights:

- 20-80MW solar power project planned, with RES to coordinate planning, permitting and development

- Permitting targeted for completion in 2010 and construction targeted to commence during 2011

- Mercator to hold minimum 70% interest in WSREC; RES to hold initial 10% with right to acquire up to 30% by contributing to construction costs

- New Mexico an optimal location for solar power development

Warm Springs Solar Project

The initial objective of the Warm Springs project is the construction of a 20MW solar power plant, with permitting targeted for completion by the end of 2010 and construction targeted to commence during 2011 subject to ongoing feasibility work. Feasibility and permitting is expected to cost up to US$750,000.

The estimated construction cost of a 20MW facility is in the range of US$60-80 million. It is anticipated that this capital requirement will be met by means of project-level debt and equity financing. Numerous innovative potential financing mechanisms taking advantage of available development incentives and tax schemes have been identified and are being evaluated in order to select the most advantageous solution.

Discussions have been initiated with a number of solar power plant constructors and technology providers. Both traditional flat plate photovoltaic and newer concentrating solar technologies are being evaluated.

WSREC believes that there may be potential for the expansion of the initial 20MW facility to 80MW capacity.

In addition to the sale of electricity, WSREC is exploring the potential for the sale of Renewable Energy Certificates ("RECs"), demand for which is expected to grow considerably in the US as under Renewable Portfolio Standard ("RPS") regulations, utilities are increasingly required to generate a substantial proportion of the electricity they sell from renewable sources. The purchase of RECs allows utilities to satisfy their RPS obligations.

The Warm Springs project will be operated and financed independently of Copper Flat, and Mercator's interest in WSREC and the Warm Springs project is unaffected by the sale of the Company's exclusive option to acquire a 100% interest in Copper Flat to THEMAC Resources Group Ltd.

Locality

From a climatic, regulatory and power transmission standpoint, New Mexico is an excellent location for solar energy development. The state has been designated to become a hub for the US power grid, which is being modified to achieve a greater degree of interconnection between different regions of the country.

Furthermore, New Mexico is seeking to become a centre for renewable energy and related industries, with the implication that the New Mexico authorities are expected to be supportive of the activities of WSREC. Grants, tax breaks and other incentives for renewable energy projects are available.

The Warm Springs project will be located, along with the Copper Flat project, in a rural area of New Mexico, and can be expected to boost local economic growth and aid economic diversification. This aligns with regional and national efforts to foster the development of renewable energy sources, and may provide additional opportunities for the Warm Springs project to qualify for federal development incentives.

Remote Energy Solutions, LLC

RES has particular expertise in providing renewable energy solutions to the mining sector, and will lead the development of the Warm Springs project. On this basis, Ann Carpenter, President of RES, has been appointed Chief Operating Officer of WSREC. RES will coordinate the state and federal permitting of the Warm Springs project, along with interconnection and transmission studies, stakeholder engagement, technology selection and financing.

RES is to be issued an initial 10% of WSREC's outstanding shares, and at such time as WSREC enters into a power purchase agreement or comparable instrument and makes arrangements to finance the construction of the Warm Springs project, RES may acquire an additional 15% of WSREC's outstanding shares by contributing 15% of WSREC's debt and equity capital requirements. At such time as WSREC enters into definitive agreements for construction financing, RES may acquire a further 5% of WSREC's outstanding shares by contributing a further 5% of WSREC's debt and equity capital requirements and reimbursing WSREC for 5% of its costs and expenses accrued to that date.

Benefits for Copper Flat Project

The development of the Warm Springs project is intended to be complementary to the recommencement of production at Copper Flat.

Although the reconnection of Copper Flat to the power grid would be straightforward, Copper Flat is likely to benefit from association with the Warm Springs project as a result of efficiencies that are expected to be realised in the permitting process and as a result of public awareness of Copper Flat being increased in a positive manner.

Potential sustainability initiatives for Copper Flat in the areas of energy efficiency and water conservation are also being researched.

ACS Asia

ACS Asia, the steel products business in which Mercator holds a 70% interest, is capable of providing the steelwork typically required for the construction of solar power facilities, and has already quoted on a number of contracts of this type in the US and Australia. Some 20-40% of the capital cost of a solar development is usually accounted for by steelwork.

ACS Asia is in a strong position to fulfil the steelwork requirements of the Warm Springs project, and continued exposure to the solar sector through WSREC is expected to assist ACS Asia in further developing its business in this field.

Patrick Harford, Managing Director of Mercator, comments:

"Copper Flat will have a genuine claim to be considered one of the most environmentally sustainable mines in the world on the basis of its association with the Warm Springs project.

Besides complementing the Copper Flat permitting process, the Warm Springs project is projected to be highly profitable in its own right, and the involvement of ACS Asia has the potential to aid the growth of that business substantially."

About the Copper Flat Project

Copper Flat is a former producing mine with substantial infrastructure still in place. Mercator, through its wholly owned subsidiary New Mexico Copper Corporation ("NMCC"), holds an exclusive option to acquire a 100% interest in Copper Flat.

The sale of Mercator's option over Copper Flat to THEMAC Resources Group Ltd ("THEMAC"), a company listed on the TSX Venture Exchange (ticker: MAC.H), is in the process of being completed.

As a result of the transaction Mercator will acquire a substantial interest in THEMAC and will therefore retain a very significant interest in Copper Flat's future development.

About Mercator

Mercator is a diversified mineral development company dedicated to creating value for its shareholders through a process of finding value, adding value and realising value. Mercator has an experienced management team with expertise in the structuring and execution of value accretive transactions.

For further information please contact:

Mercator Gold plc

Michael Silver, Chairman

Tel: +44 (0)20 7929 1010

Patrick Harford, Managing Director

Tel: +1 646 239 9087

Email: info@mercatorgold.com

Website: www.mercatorgold.com

Daniel Stewart & Company plc

Oliver Rigby

Tel: + 44 (0)20 7776 6550

Old Park Lane Capital plc

Forbes Cutler

Tel: +44 (0) 20 7518 2603

Bankside Consultants Ltd

Simon Rothschild/Oliver Winters

Tel: +44 (0) 20 7367 8888

Barry Kaplan Associates

Larry Kaplan

Tel: +1 732 747 0702

Copyright Business Wire 2010

Date   Source Headline
10th Aug 20237:15 amBUSRock Chip Results from Tambo Licence EL7484 and Renewal of Bailieston Licence EL5433
8th Aug 20237:06 amBUSLatest Results for Lolworth Gold, Niobium, Tantalum and REE Samples
20th Jul 20233:15 pmBUSFurther Gold Results from Soil Sampling at Quartz Hill, Creswick
19th Jul 20232:57 pmBUSInitial interpretations of pXRF analysis from the first Lolworth Range Niobium Soil Grid
12th Jul 202312:18 pmBUSPotential Exploration Targets Defined from LIDAR Survey at Hurricane Project
30th Jun 202310:42 amBUSHalf-year Report
25th May 202312:38 pmBUSPotential for Rare Earth Minerals at the Lolworth Range Project, Queensland
22nd May 20237:59 amBUSVictoria Exploration and Queensland Project Updates
9th May 20238:30 amBUS2023 Exploration Season Commences at the Lolworth Range Project, Queensland
9th May 20237:04 amBUSFunds From Sale of Bailieston Property Now Received
2nd May 20233:32 pmBUSFurther Gold Results from Creswick Soil Sampling Campaign
24th Apr 202310:12 amBUSResult of AGM
17th Apr 20238:08 amBUSIssue of Options
17th Apr 20237:04 amBUSLatest Results from Soil Sampling at the Creswick Project
5th Apr 202311:20 amBUSProposed Acquisition of Blue Mountain Project, Queensland
3rd Apr 20237:05 amBUSFinal Niobium and Tantalum Stream Results Extend Anomalous Footprint at Lolworth Range Project, Queensland
3rd Apr 20237:00 amBUSFinal Results
23rd Mar 20237:16 amBUSFurther Stream Sampling Results Identify New Gold Anomalies at Lolworth Range Project, Queensland
3rd Mar 20233:01 pmBUSDiamond Drilling Programme commences at Creswick
1st Mar 20237:04 amBUSSecond ECR Drill Rig Arrives At Melbourne
24th Feb 20237:09 amBUSFurther High-Grade Gold Intercepts at Blue Moon Prospect, Bailieston, Victoria
22nd Feb 20237:06 amBUSDanglay Gold Project shareholding increases to 90%
15th Feb 20237:02 amBUSSale of Bailieston Property Raises A$670,000
7th Feb 20237:17 amBUSInsitu Rock Chip Sampling at Creswick Licences EL006184 and EL006713
1st Feb 202310:19 amBUSFurther Gold, Lithium, Tantalum and Niobium Samples Identified at Lolworth Range Project, Queensland
23rd Jan 20237:50 amBUSDrilling Progress Report for the Blue Moon Prospect at Bailieston, Victoria
23rd Jan 20237:05 amBUSSoil Geochemistry Results from Creswick License EL006184
3rd Jan 20237:38 amBUSApproval Received For Two Further Exploration Tenements in Victoria, Australia
23rd Dec 20227:09 amBUSLithium-Tantalum-Niobium Stream Anomalies Identified at Lolworth, Queensland
22nd Dec 20227:05 amBUSNew Parallel Gold System Identified at Creswick, Victoria
13th Dec 20221:56 pmBUSNew Exploration Tenements EL006911 and EL006912 granted at Bailieston, Victoria
12th Dec 202212:45 pmBUSMultiple visible gold occurrences and pegmatites observed at Lolworth, Queensland
12th Dec 202211:08 amBUSEquity Placing to Raise GBP900,000
8th Dec 20227:04 amBUSUpdated Corporate Presentation
23rd Nov 20227:25 amBUSPayment to GoldOz PL
17th Nov 20227:06 amBUSEncouraging Results from First Drill Hole of 2022 at Blue Moon, Victoria
19th Oct 20222:31 pmBUSBlock listing Interim Review
19th Oct 20227:04 amBUSRe-assay of Creswick Diamond Drill Core Reveals High Grade Results Including 0.7m @47.75 g/t Au
14th Oct 20221:11 pmBUSTwo Mineralisation Corridors Identified in Hole BH3DD032 at Bailieston, Victoria
11th Oct 20228:19 amBUSSecond ECR Drill Rig Update
4th Oct 20228:28 amBUSUpdate on Sampling at Lolworth, Queensland
14th Sep 20227:10 amBUSDrilling Commences at Blue Moon Prospect, Bailieston, Victoria
26th Aug 20222:00 pmBUSBendigo Property Sale Proceeds of A$950,000 Now Received
11th Aug 20227:03 amBUSPlanned Follow-up Drilling in early September at Blue Moon Prospect, Bailieston, Victoria
9th Aug 20227:02 amBUSTwo Mineralisation Corridors Identified from HR3 hole BH3DD032 at Bailieston, Victoria
29th Jul 20228:30 amBUSSale of Bendigo Property Raises A$950,000
11th Jul 20227:14 amBUSDrill Results from BH3DD035 Show Signs of Grade Continuity at Bailieston, Victoria
6th Jul 20227:01 amBUSInvestor Presentation and Strategic Update
30th Jun 20227:01 amBUSHalf-year Report
24th Jun 20223:22 pmBUSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.