The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.26
Bid: 0.25
Ask: 0.27
Change: -0.005 (-1.89%)
Spread: 0.02 (8.00%)
Open: 0.275
High: 0.28
Low: 0.26
Prev. Close: 0.265
ECR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Two Mineralisation Corridors Identified in Hole BH3DD032 at Bailieston, Victoria

14 Oct 2022 13:11

 

ECR MINERALS plc

(“ECR Minerals”, “ECR” or the “Company”)

Two Mineralisation Corridors Identified in Hole BH3DD032 at Bailieston, Victoria

ECR Minerals plc (LON: ECR), the exploration and development company focused on gold in Australia, is pleased to announce the final gold results from the 2022 drill program at the HR3 prospect at Bailieston.

ECR Minerals plc has 100% ownership of the Bailieston Project (EL5433), which contains the gold prospects known as HR3, Cherry Tree, Blue Moon and Black Cat. The projects are operated by ECR’s Australian wholly owned subsidiary Mercator Gold Australia Pty Ltd (“MGA”).

ECR CEO Andrew Haythorpe commented: Some very encouraging grades have emerged from these results, and in particular the average of 9.01g/t over 4m at hole BH3DD043 could very likely result in follow up work, which is supported by our Technical Director Adam Jones. We will now evaluate this full dataset, decide on the next steps and report back in due course.”

“Drilling at Blue Moon is progressing and I look forward to reporting the lab results back to you as soon as they arrive.”

HIGHLIGHTS

Best results in BH3DD043 with a composited grade of 9.01 g/t Au over a drilled width of 4 metres.Further results from the Maori Anticline include 1m @ 4.96 g/t Au (BH3DD042) at a depth of 273mMultiple intersections along strike of the Scoulers Reef including 0.2m @ 9.22 g/t Au (BH3DD042), 0.5m @ 4.55 g/t Au (BH3DD037) and 1m @ 3.34 g/t Au (BH3DD038)

A plan of the HR3 Goldfield and the location of this reported drilling with the 10 ten intercepts can be found here:

Fig 1: https://www.ecrminerals.com/images/2022/fig1_221015_Final_Drilling_Results_2022_HR3.png

BACKGROUND TO DRILL PROGRAM

ECR Minerals have been drilling targets throughout 2022 on their Bailieston tenements located in Victoria, Australia. Our drilling activity has been predominantly within the HR3 Goldfield, focussed on the main NNW striking gold-quartz mineralised systems including Byron Reef, Scoulers Reef and the Maori Reef. Initial drilling by ECR in 2021 focussed on the Byron Reef and indicated that gold mineralisation was not continuous (see RNS 1 below).

In early 2022 the focus shifted to the Maori Reef which is the most easternly known vein system within the HR3 Goldfield. ECR geologists concluded that the Maori Reef is hosted within an anticlinal fold now called the ‘Maori Anticline’. Early drilling into this anticline has been successful (Holes BH3DD009, BH3DD010 and BH3DD011). Drilling continued to follow the anticlinal fold to the north and in depth with successful intersections in holes BH3DD019, BH3DD012 and BH3DD034, which contained visible gold (see RNS dated 22 November 2021 for more details of these drill hole results, a link of which is also set out below).

The reported drill results in this announcement are for the final drilling completed to date at HR3 to follow up the best results adjacent to hole BH3DD034 and include additional test drilling into the parallel quartz reef systems. Drilling was completed at the end of July 2022. Final results have just been received after long delays in laboratory turn-around due predominantly to issues relating to the COVID-19 pandemic.

Previous Drill Results for HR3

Previously released drill results from HR3 include:

1. 22 December 2021 - BH3DD010, BH3DD011;

https://polaris.brighterir.com/public/ecr_minerals_plc/news/rns/story/wkn801w

2. 23 December 2021 - Bailieston (HR3) Soil Sampling

https://polaris.brighterir.com/public/ecr_minerals_plc/news/rns/story/rmzlq5w

3. 14 March 2022 - BH3DD012, BH3DD034 (Visible Gold)

https://polaris.brighterir.com/public/ecr_minerals_plc/news/rns/story/xeekpyx

4. 22 April 2022 - BH3DD027 (Hard-Up Reef)

https://polaris.brighterir.com/public/ecr_minerals_plc/news/rns/story/w0mnmnx

DETAILS OF FINAL DRILLING

A total of eight holes were drilled in this final stage of drilling, and a summary of the work and associated results are set out below. Full details of the drill results are set out at the end of this announcement:

BH3DD036

BH3DD036 was drilled underneath the north end of the Maori Reef at the point where historical workings ended. The Maori Anticline was passed through at 92m where the hinge faulted. The best result was 0.3m @ 0.28 g/t Au from 176m. Drilling ended at a depth of 206.55m

BH3DD037

The drill team moved to the centre of the HR3 Goldfield to test the Scoulers Reef near the surface. A selected number of the following drillholes were also extended to test the Maori Anticline at depth. BH3DD037 drilled underneath the coincidental reported soil ‘Anomaly C’ (see RNS dated 23 December 2021, a link for which is above) and the location of earlier high-grade rock chips. Drilling results show a broad zone of lower grade mineralisation (see Table 2 below). The best intersection was 0.5m @ 4.55 g/t Au from 33.6m which relates to the Scoulers Reef. The hole ended at 115.8m.

BH3DD038

This hole drilled towards the east, passing through the Scoulers Reef at 27m depth and the Maori Anticline at 280m depth. The best intercept was 1m @ 3.34 g/t Au from 27m. A speck of visible gold was noted in thin quartz veinlets at 175.8m, however this was not reflected in the sampled grade of (0.4m @ 0.42 g/t Au from 175.8m). Drilling ended at a depth of 308.5m.

BH3DD039

Hole BH3DD039 was drilled underneath soil anomaly ‘B’ as reported in December 2021 (see RNS dated 23 December 2021, a link for which is above). Despite the presence of anomalous gold, no significant results greater than 1 g/t Au where intersected. Best result was 1m @ 0.96 g/t Au from 62.7m. This hole finished drilling at 140.8m.

BH3DD040

This hole was drilled towards the intersection of the Maori and Hard-Up Reef at depth. The Maori Reef was intersected at 242.3m with a grade of 1.96 g/t Au over a length of 0.35m. The best result from this hole was from the Scoulers Reef with 0.4m @ 3.99 g/t Au from 13.6m depth. This hole ended at 275.1m

BH3DD041

Whilst drilling continued towards the east into the Maori Antcline and Scoulers Reef, the decision was taken to drill a preliminary hole into the Byron Reef to the south of the old Byron Mine (see figure 1 above) after locating an exploration percussion hole from an earlier phase of exploration in the 1980’s. Historical documentation showed the hole BLP140 had previously yielded 3m @ 28 g/t Au from 33m. ECR’s drilling revealed the presence of a major shear zone containing sulphide and quartz mineralisation around 104m in depth. No significant gold was intercepted with the best result being 0.4m @ 0.53 g/t Au from 64.6m. This hole finished at 139.8m

BH3DD042

This hole was intended to drill deep into the Maori Anticline underneath the previous drilling of BH3DD017 and BH3DD012. The anticline was successfully identified at 273m where mineralisation was sampled returning 1m @ 4.96 g/t Au. The Scoulers Reef was also intersected in the upper portion of this hole with an intercept of 0.2m @ 9.22 g/t Au from 41.1m drill depth. This hole ended at 356.6m.

BH3DD043

Hole BH3DD043 was the last drill hole completed at HR3 this year. The hole was intentionally drilled to intercept the Maori Anticline approximately 25m to the immediate north of nearby drillholes BH3DD034, BH3DD035 and BH3DD019. The best mineralisation drilled was identified in a footwall vein to the Maori Anticline, with best intercepts beginning at a depth of 54m including 1m @ 4.82 g/t Au followed immediately by adjacent high-grade intercepts of 1m @ 5.54 g/t Au, 1m @ 9.79 g/t Au and 1m @ 15.91 g/t Au. This high-grade zone represents a length-weighted composite grade of 4m @ 9.01 g/t Au. This is the best length multiplied by grade intercept drilled to date in HR3. Drilling ended at a final depth of 194.5m.

SUMMARY OF EXPLORATION

Drilling at HR3 throughout the 2021-2022 period has been largely successful. Notable outcomes include:

Identifying the Maori Anticline as a major host to gold mineralisation at the HR3 Goldfield.Initial high-grade intercepts located underneath the Maori Reef,Hard-Up Reef intersections.Locating and testing gold mineralisation at depth and strike within the Maori Anticline. An approximate strike length of 300m has now been initially drilled. Mineralisation is open along strike to the north and south.Exploration work during this period has also successfully identified a close spatial relationship of high arsenic (Arsenopyrite) and high antimony (Stibnite) ratios as pathfinders to gold mineralisation.

Table 1. Summary of the top ten drill intercepts containing reportable levels of gold for holes BH3DD036-BH3DD043. Arranged by hole name and depth.

HOLE

From (m)

To (m)

Interval (m)

Au (g/t)

gram metres*

BH3DD037

33.6

34.1

0.5

4.55

2.27

BH3DD037

40.6

41

0.4

3.61

1.45

BH3DD038

27

28

1

3.34

3.34

BH3DD040

13.6

14

0.4

3.99

1.60

BH3DD042

41.1

41.3

0.2

9.22

1.84

BH3DD042

273

274

1

4.96

4.96

BH3DD043

54

55

1

4.82

4.82

BH3DD043

55

56

1

5.54

5.54

BH3DD043

56

57

1

9.79

9.79

BH3DD043

57

58

1

15.91

15.91

*Gram metres represents the contained Au metal within the reported length, calculated as interval (m) multiplied by grade (g/t Au)

Table 2. Drill intercepts for all reportable levels of gold above 0.1 g/t Au for holes BH3DD036-BH3DD043.

*Gram metres represents the contained Au metal within the reported length, calculated as interval (m) multiplied by grade (g/t Au)

BH3DD036

 

 

 

 

From (m)

To (m)

Grade (g/t Au)

Interval (m)

Gram x Metres*

55

55.8

0.28

0.8

0.22

57

57.3

0.23

0.3

0.07

65.1

65.4

0.28

0.3

0.09

118.8

119.2

0.15

0.4

0.06

176

176.3

0.28

0.3

0.08

 

 

 

 

 

BH3DD037

 

 

 

 

From (m)

To (m)

Grade (g/t Au)

Interval (m)

Gram x Metres

4.7

5.7

1.81

1

1.81

5.7

6.7

1.69

1

1.69

9.5

9.7

0.12

0.2

0.02

11.5

11.8

1.25

0.3

0.38

12.25

12.7

0.61

0.45

0.27

16

16.6

0.26

0.6

0.15

16.6

17

0.51

0.4

0.20

17

17.5

0.68

0.5

0.34

28

29

1.26

1

1.26

29.75

30.25

2.63

0.5

1.31

30.8

31.8

0.17

1

0.17

31.8

32.3

1.97

0.5

0.98

32.3

33

2.50

0.7

1.75

33

33.35

0.79

0.35

0.28

33.6

34.1

4.55

0.5

2.27

35.1

35.5

0.27

0.4

0.11

35.5

36.5

2.92

1

2.92

36.5

37.5

1.38

1

1.38

37.5

38

2.82

0.5

1.41

38

38.5

0.42

0.5

0.21

38.5

39.5

0.58

1

0.58

39.5

40.2

0.37

0.7

0.26

40.2

40.6

1.31

0.4

0.53

40.6

41

3.61

0.4

1.45

41

42

1.03

1

1.03

42

43

0.23

1

0.23

71.8

72

0.15

0.2

0.03

72

72.6

0.17

0.6

0.10

72.6

72.8

0.50

0.2

0.10

72.8

74

0.53

1.2

0.63

74

75

0.22

1

0.22

75

76

0.57

1

0.57

76

77

0.69

1

0.69

94.5

95.5

0.32

1

0.32

95.5

96.5

0.46

1

0.46

97.5

98.2

0.13

0.7

0.09

105.55

106

0.24

0.45

0.11

109

110

0.21

1

0.21

 

 

 

 

 

BH3DD038

 

 

 

 

From (m)

To (m)

Grade (g/t Au)

Interval (m)

Gram x Metres

3.45

4.45

1.22

1

1.22

4.45

5

0.90

0.55

0.49

5

5.4

1.91

0.4

0.77

5.4

6

1.06

0.6

0.63

18

19

0.19

1

0.19

19

20

0.81

1

0.81

25

26

0.36

1

0.36

26

27

1.28

1

1.28

27

28

3.34

1

3.34

28

29

0.44

1

0.44

30

31

0.28

1

0.28

33.7

33.9

0.22

0.2

0.04

35.5

36.3

0.35

0.8

0.28

56.5

57.5

0.44

1

0.44

57.5

58

0.76

0.5

0.38

58

58.3

1.62

0.3

0.49

58.3

58.6

1.54

0.3

0.46

58.6

59

1.53

0.4

0.61

59

59.4

1.92

0.4

0.77

59.4

60.4

0.17

1

0.17

60.4

61.2

0.17

0.8

0.13

61.2

61.4

1.23

0.2

0.25

61.4

62.2

0.37

0.8

0.30

62.2

63

0.19

0.8

0.15

63

63.4

0.60

0.4

0.24

66.3

66.8

0.26

0.5

0.13

66.8

67.4

0.82

0.6

0.49

67.4

68.2

0.81

0.8

0.65

170.6

170.9

0.18

0.3

0.06

170.9

171.9

0.18

1

0.18

173.5

174.4

0.59

0.9

0.53

175.4

175.8

0.21

0.4

0.09

175.8

176

0.42

0.2

0.08

176

176.6

0.35

0.6

0.21

176.6

177.6

0.27

1

0.27

177.6

178

0.22

0.4

0.09

178

178.7

0.64

0.7

0.45

178.7

179.3

0.31

0.6

0.19

199

199.4

0.16

0.4

0.06

201.4

202

0.16

0.6

0.09

237.35

237.55

0.25

0.2

0.05

237.55

238

0.16

0.45

0.07

296.3

296.5

0.90

0.2

0.18

296.5

296.7

0.20

0.2

0.04

296.7

297

0.57

0.3

0.17

297

298

0.20

1

0.20

298

298.5

0.38

0.5

0.19

298.5

299

0.70

0.5

0.35

299

299.35

0.55

0.35

0.19

299.5

299.65

1.13

0.15

0.17

300.2

300.6

0.19

0.4

0.08

 

 

 

 

 

BH3DD039

 

 

 

 

From (m)

To (m)

Grade (g/t Au)

Interval (m)

Gram x Metres

61.7

62.7

0.47

1

0.47

62.7

63.7

0.96

1

0.96

63.7

64.7

0.19

1

0.19

65.5

66

0.14

0.5

0.07

67

68

0.17

1

0.17

72.4

72.7

0.21

0.3

0.06

72.7

73

0.25

0.3

0.07

74.35

74.55

0.13

0.2

0.03

75.5

75.8

0.31

0.3

0.09

90.2

90.6

0.17

0.4

0.07

96

97

0.18

1

0.18

97.4

98.1

0.21

0.7

0.15

98.5

98.9

0.42

0.4

0.17

98.9

99.9

0.40

1

0.40

106.5

107

0.16

0.5

0.08

107

108

0.34

1

0.34

 

 

 

 

 

BH3DD040

 

 

 

 

From (m)

To (m)

Grade (g/t Au)

Interval (m)

Gram x Metres

13.6

14

3.99

0.4

1.60

15

15.35

0.24

0.35

0.09

15.8

16.8

0.41

1

0.41

16.8

17.05

0.68

0.25

0.17

17.05

17.4

1.65

0.35

0.58

17.4

18

2.61

0.6

1.56

22.3

22.7

0.89

0.4

0.36

22.7

23

1.66

0.3

0.50

24.4

25.4

1.82

1

1.82

25.4

26.1

0.20

0.7

0.14

31.6

32.1

1.12

0.5

0.56

44

44.6

0.64

0.6

0.38

46.7

47.5

0.22

0.8

0.17

48.55

49

0.77

0.45

0.34

52.65

53.2

0.90

0.55

0.49

144.6

145.1

0.77

0.5

0.39

145.1

146.3

0.29

1.2

0.35

178

178.3

0.20

0.3

0.06

189

189.6

0.17

0.6

0.10

189.6

190.5

1.22

0.9

1.09

190.5

191.2

0.24

0.7

0.16

191.2

191.6

1.17

0.4

0.47

191.6

192

0.35

0.4

0.14

192

193

0.17

1

0.17

193.7

194.7

0.39

1

0.39

194.7

195.7

0.54

1

0.54

195.7

196.7

0.13

1

0.13

204.5

205

0.44

0.5

0.22

205

206

0.17

1

0.17

206

207

0.26

1

0.26

210

211

0.44

1

0.44

211

211.45

0.41

0.45

0.18

212.45

213.4

0.78

0.95

0.74

214

214.35

0.43

0.35

0.15

214.35

214.6

0.95

0.25

0.24

214.6

215.2

0.80

0.6

0.48

215.2

215.7

0.19

0.5

0.09

219.4

219.75

0.29

0.35

0.10

225.5

225.75

0.34

0.25

0.09

238.7

239.2

0.16

0.5

0.08

240.2

241.2

0.78

1

0.78

241.65

242.3

1.11

0.65

0.72

242.3

242.65

1.96

0.35

0.69

242.65

243.1

0.21

0.45

0.10

258.6

259.3

0.17

0.7

0.12

259.3

259.65

1.13

0.35

0.40

259.65

260

0.67

0.35

0.23

260

260.5

0.23

0.5

0.12

 

 

 

 

 

BH3DD041

 

 

 

 

From (m)

To (m)

Grade (g/t Au)

Interval (m)

Gram x Metres

41.7

42.25

0.27

0.55

0.15

42.25

42.7

0.42

0.45

0.19

49.2

49.6

0.15

0.4

0.06

64.6

65

0.53

0.4

0.21

91.7

92.7

0.22

1

0.22

104

104.25

0.12

0.25

0.03

104.25

104.6

0.18

0.35

0.06

 

 

 

 

 

BH3DD042

 

 

 

 

From (m)

To (m)

Grade (g/t Au)

Interval (m)

Gram x Metres

37.55

38.4

0.16

0.85

0.13

40.8

41.1

1.79

0.3

0.54

41.1

41.3

9.22

0.2

1.84

41.3

42

1.30

0.7

0.91

44

45

0.17

1

0.17

56.8

57

0.20

0.2

0.04

61.6

61.85

0.23

0.25

0.06

73.2

73.5

0.24

0.3

0.07

74.7

75.05

0.25

0.35

0.09

75.05

75.4

0.21

0.35

0.07

81.45

82

0.17

0.55

0.09

103.3

103.6

0.19

0.3

0.06

103.6

103.95

0.65

0.35

0.23

103.95

104.5

0.33

0.55

0.18

104.5

105.2

0.38

0.7

0.27

105.2

106.2

0.24

1

0.24

106.2

106.8

0.82

0.6

0.49

106.8

107.2

0.62

0.4

0.25

107.2

107.6

1.08

0.4

0.43

107.6

108.7

0.33

1.1

0.36

108.7

108.9

0.41

0.2

0.08

109.1

109.7

0.26

0.6

0.16

109.7

110.7

0.53

1

0.53

110.7

111

0.38

0.3

0.12

111

111.6

1.13

0.6

0.68

111.6

112.6

1.45

1

1.45

112.6

113.6

1.36

1

1.36

113.6

114.4

0.66

0.8

0.52

114.4

114.7

1.09

0.3

0.33

115

115.7

0.98

0.7

0.69

115.7

116.2

0.30

0.5

0.15

118.2

118.7

0.32

0.5

0.16

118.7

119

0.94

0.3

0.28

119

119.25

1.07

0.25

0.27

119.25

119.7

1.48

0.45

0.67

119.7

120.1

0.99

0.4

0.39

120.1

120.4

0.72

0.3

0.22

149.25

150.2

0.16

0.95

0.15

152.1

152.4

0.17

0.3

0.05

153.7

154.3

0.16

0.6

0.09

169.9

170.2

0.26

0.3

0.08

198.9

199.5

0.18

0.6

0.11

205.05

206.2

0.30

1.15

0.35

247.8

248.6

0.22

0.8

0.17

248.6

249.4

0.31

0.8

0.25

252

252.7

0.48

0.7

0.34

252.7

253

0.30

0.3

0.09

267.9

268.7

0.22

0.8

0.17

269.9

270.9

0.82

1

0.82

270.9

271.9

0.38

1

0.38

271.9

272.4

0.43

0.5

0.22

273

274

4.96

1

4.96

274

275

0.22

1

0.22

309.8

310.3

0.35

0.5

0.18

311

311.6

0.19

0.6

0.11

311.9

312.5

0.25

0.6

0.15

314.05

314.3

0.29

0.25

0.07

349.8

350.25

0.16

0.45

0.07

 

 

 

 

 

BH3DD043

 

 

 

 

From (m)

To (m)

Grade (g/t Au)

Interval (m)

Gram x Metres

35.9

37

1.54

1.1

1.69

38

38.2

0.79

0.2

0.16

44

45

0.56

1

0.56

45

46

1.54

1

1.54

46

47

1.19

1

1.19

53

54

0.42

1

0.42

54

55

4.82

1

4.82

55

56

5.54

1

5.54

56

57

9.79

1

9.79

57

58

15.91

1

15.91

58

59

1.87

1

1.87

59

59.3

1.45

0.3

0.43

59.3

59.7

0.39

0.4

0.16

59.7

60.2

0.22

0.5

0.11

60.9

61.6

2.52

0.7

1.77

61.6

62

0.29

0.4

0.12

63

64

0.20

1

0.20

64

65

0.34

1

0.34

65

66

0.20

1

0.20

68

69

0.17

1

0.17

69

69.8

0.52

0.8

0.42

69.8

70.9

0.22

1.1

0.24

72

73

0.24

1

0.24

98

98.5

0.31

0.5

0.16

109.4

110.4

0.17

1

0.17

110.4

111.2

0.22

0.8

0.17

111.2

112

0.25

0.8

0.20

123.2

124

0.24

0.8

0.20

124

125

0.31

1

0.31

150.4

150.8

0.69

0.4

0.27

158.8

159.1

0.98

0.3

0.29

159.1

160.1

0.72

1

0.72

160.1

161

0.36

0.9

0.32

161

162

0.43

1

0.43

189.4

190

1.17

0.6

0.70

Table 3. Gram-metre intersections for BH3DD036-BH3DD043 (for intersections containing => 1g/t Au)

*Gram metres represents the contained Au metal within the reported length, calculated as interval (m) x grade (g/t Au)

BH3DD037

 

 

 

From(m)

To (m)

Grade (g/t Au)

Interval (m)

Gram x Metres

4.7

5.7

1.81

1

1.81

5.7

6.7

1.69

1

1.69

28

29

1.26

1

1.26

29.75

30.25

2.63

0.5

1.31

32.3

33

2.50

0.7

1.75

33.6

34.1

4.55

0.5

2.27

35.5

36.5

2.92

1

2.92

36.5

37.5

1.38

1

1.38

37.5

38

2.82

0.5

1.41

40.6

41

3.61

0.4

1.45

41

42

1.03

1

1.03

 

 

 

 

 

BH3DD038

 

 

 

From(m)

To (m)

Grade (g/t Au)

Interval (m)

Gram x Metres

3.45

4.45

1.22

1

1.22

26

27

1.28

1

1.28

27

28

3.34

1

3.34

 

 

 

 

 

BH3DD040

 

 

 

From (m)

To (m)

Grade (g/t Au)

Interval (m)

Gram x Metres

13.6

14

3.99

0.4

1.60

17.4

18

2.61

0.6

1.56

24.4

25.4

1.82

1

1.82

189.6

190.5

1.22

0.9

1.09

 

 

 

 

 

BH3DD042

 

 

 

From (m)

To (m)

Grade (g/t Au)

Interval (m)

Gram x Metres

41.1

41.3

9.22

0.2

1.84

111.6

112.6

1.45

1

1.45

112.6

113.6

1.36

1

1.36

273

274

4.96

1

4.96

 

 

 

 

 

BH3DD043

 

 

 

From(m)

To (m)

Grade (g/t Au)

Interval (m)

Gram x Metres

35.9

37

1.54

1.1

1.69

45

46

1.54

1

1.54

46

47

1.19

1

1.19

54

55

4.82

1

4.82

55

56

5.54

1

5.54

56

57

9.79

1

9.79

57

58

15.91

1

15.91

58

59

1.87

1

1.87

60.9

61.6

2.52

0.7

1.77

SUMMARY

Whilst varied, the Directors are pleased with the outcome of the final results from HR3. These results show that mineralisation is still open to the north of hole BH3DD043 and at depth. Technical director Adam Jones will evaluate the potential of follow up drilling for these results over the coming Australian summer period.

In the meantime, drilling continues at the nearby Blue Moon prospect with two holes now completed and samples submitted to the laboratory for analysis. Drilling is planned to continue into the Christmas holiday period.

Soil sampling and rock chip sampling have been completed on adjacent parallel quartz reefs on the Creswick tenements (EL6184) with results expected by the end of this month. The outcome of this work will delineate further drill targets for the 2023 drilling season.

REVIEW OF ANNOUNCEMENT BY QUALIFIED PERSON

This announcement has been reviewed by Adam Jones, Technical Director of Exploration at ECR Minerals plc. Adam Jones is a professional geologist and is a Member of the Australian Institute of Geoscientists (MAIG). He is a qualified person as that term is defined by the AIM Note for Mining, Oil and Gas Companies.

MARKET ABUSE REGULATIONS (EU) No. 596/2014

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR). Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

FOR FURTHER INFORMATION, PLEASE CONTACT:

ECR Minerals plc

 

Tel: +44 (0) 20 7929 1010

 

David Tang, Non-Executive Chairman

Andrew Haythorpe, CEO

 

 

 

 

 

 

 

Email:

info@ecrminerals.com

 

 

 

Website: www.ecrminerals.com

 

 

 

 

 

 

 

WH Ireland Ltd

 

Tel: +44 (0) 207 220 1666

 

Nominated Adviser

Katy Mitchell / Andrew de Andrade

 

 

 

 

 

 

 

SI Capital Ltd

 

Tel: +44 (0) 1483 413500

 

Broker

 

 

 

Nick Emerson

 

 

 

 

 

 

 

Novum Securities Limited

 

Tel: +44 (0) 20 7399 9425

 

Broker

Jon Belliss

 

 

 

 

 

 

 

BlytheRay

 

Tel: +44 (0) 207 138 3204

 

Public Relations

 

 

 

Tim Blythe

 

 

 

 

 

ABOUT ECR MINERALS PLC

ECR Minerals is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Ltd (“MGA”) has 100% ownership of the Bailieston and Creswick gold projects in central Victoria, Australia, has six licence applications outstanding which includes one licence application lodged in eastern Victoria (Tambo gold project). MGA is currently drilling at the Bailieston Blue Moon Project (EL5433) and undertaking geochemical exploration on the Creswick (EL6148) project and has an experienced exploration team with significant local knowledge in the Victoria Goldfields and wider region.

https://mercatorgold.com.au/

ECR also owns 100% of an Australian subsidiary LUX Exploration Pty Ltd (“LUX”) which has three approved exploration permits covering 946 km2 over a relatively unexplored area in Queensland, Australia.

https://luxexploration.com/

Following the sale of the Avoca, Moormbool and Timor gold projects in Victoria, Australia to Fosterville South Exploration Ltd (TSX-V: FSX) and the subsequent spin-out of the Avoca and Timor projects to Leviathan Gold Ltd (TSX-V: LVX), Mercator Gold Australia Pty Limited has the right to receive up to A$2 million in payments subject to future resource estimation or production from projects sold to Fosterville South Exploration Limited.

ECR holds a 70% interest in the Danglay gold project; an advanced exploration project located in a prolific gold and copper mining district in the north of the Philippines, which has a 43-101 compliant resource. ECR also holds a royalty on the SLM gold project in La Rioja Province, Argentina and can potentially receive up to US$2.7 million in aggregate across all licences.

View source version on businesswire.com: https://www.businesswire.com/news/home/20221014005257/en/

Copyright Business Wire 2022

Date   Source Headline
23rd Apr 202411:48 amRNSResult of AGM
23rd Apr 20247:02 amRNSAGM Statement
18th Apr 20247:05 amRNSSalary Sacrifice, Admission of Shares and TVR
8th Apr 20247:06 amRNSCreswick drill results indicate larger ore bodies
2nd Apr 20247:00 amRNSAnnual Report & Audited Results YE 30th Sept 2023
14th Mar 20247:04 amRNSPlacing raises £585,000 & Joint Broker Appointed
14th Mar 20247:02 amRNSIssue of Equity, Total Voting Rights, PDMR Dealing
15th Feb 20241:36 pmRNSBoard Changes
5th Feb 20249:55 amRNSPreliminary findings from Creswick drilling
23rd Jan 20247:03 amRNSBoard Change
15th Jan 202412:46 pmRNSFurther re the sale of Non-Core Assets
10th Jan 20247:04 amRNSReview of Lolworth Project
18th Dec 20237:05 amRNSSale of Non-Core Assets
14th Dec 20237:01 amRNSIssue of Equity, Total Voting Rights, PDMR Dealing
12th Dec 202310:50 amRNSDrilling Underway at the Creswick Project
11th Dec 20237:04 amRNSUpdate on Planned Drilling at Creswick
1st Dec 20237:18 amRNSSalary Sacrifice Share Admission and TVR
24th Nov 20231:18 pmRNSECR Board members attending Mines and Money
20th Nov 20237:04 amRNSLolworth Results Suggest Extended Mineralisation
16th Nov 202310:55 amRNSCorrection - Director Share Agreements
16th Nov 20237:36 amRNSUpdate on Drilling & Director Share Agreements
31st Oct 20237:05 amRNSGold Bearing Quartz Veins Discovered at Lolworth
23rd Oct 20237:04 amRNSEncouraging Gold Results from Lolworth Project
20th Oct 20235:09 pmRNSCancellation of Share Options
20th Oct 20234:56 pmRNSTermination of option to acquire Hurricane Project
6th Oct 20234:08 pmRNSResult of General Meeting & Total Voting Rights
5th Oct 20237:05 amRNSHurricane: Final Rock Chip Results & Prospectivity
2nd Oct 20237:04 amRNSHurricane Option Extension & Rock Chip Results
27th Sep 202311:07 amRNSAdditional License Application at Kondaparinga
25th Sep 20239:18 amBUSExtended Gold Prospectivity and Niobium Bullseye Discovery at the Lolworth Project
21st Sep 202310:34 amBUSAsset Overview and Evaluation
19th Sep 20237:34 amBUSPosting of Circular, Notice of GM, Directors Share Agreements & PDMR Dealing
18th Sep 20237:04 amBUSConditional Fundraise of £580,000 & Proposed General Meeting
15th Sep 20231:12 pmBUSBoard and Management Changes
15th Aug 20233:09 pmBUSGold & Niobium Rock Chip Results from the Lolworth Project
10th Aug 20237:15 amBUSRock Chip Results from Tambo Licence EL7484 and Renewal of Bailieston Licence EL5433
8th Aug 20237:06 amBUSLatest Results for Lolworth Gold, Niobium, Tantalum and REE Samples
20th Jul 20233:15 pmBUSFurther Gold Results from Soil Sampling at Quartz Hill, Creswick
19th Jul 20232:57 pmBUSInitial interpretations of pXRF analysis from the first Lolworth Range Niobium Soil Grid
12th Jul 202312:18 pmBUSPotential Exploration Targets Defined from LIDAR Survey at Hurricane Project
30th Jun 202310:42 amBUSHalf-year Report
25th May 202312:38 pmBUSPotential for Rare Earth Minerals at the Lolworth Range Project, Queensland
22nd May 20237:59 amBUSVictoria Exploration and Queensland Project Updates
9th May 20238:30 amBUS2023 Exploration Season Commences at the Lolworth Range Project, Queensland
9th May 20237:04 amBUSFunds From Sale of Bailieston Property Now Received
2nd May 20233:32 pmBUSFurther Gold Results from Creswick Soil Sampling Campaign
24th Apr 202310:12 amBUSResult of AGM
17th Apr 20238:08 amBUSIssue of Options
17th Apr 20237:04 amBUSLatest Results from Soil Sampling at the Creswick Project
5th Apr 202311:20 amBUSProposed Acquisition of Blue Mountain Project, Queensland

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.