Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

Share Price is delayed by 15 minutes
Get Live Data
0.24    -0.005 (-2.04%)
Bid:
0.23
Ask:
0.25
Spread: 0.02 (8.696%)
Market Cap: £8.51m
ECR Live PriceLast checked at - London Stock Exchange

Intraday ECR Minerals Share Chart

Renewable Energy Partnership

15 Jun 2010 10:17

MERCATOR GOLD plc ("Mercator Gold", "Mercator" or "the Company")

AIM: MCR US OTC: MTGDY

Renewable Energy Partnership

London 15 June 2010

Mercator Gold plc is pleased to announce that it has entered into a partnership with Remote Energy Solutions, LLC ("RES"), an established renewable energy developer, in relation to the Warm Springs solar power project ("the Warm Springs project") in New Mexico, USA. The Warm Springs project is being developed in close proximity to the Copper Flat copper-gold-molybdenum-silver project ("Copper Flat") by Mercator's subsidiary Warm Springs Renewable Energy Corporation ("WSREC").

Highlights:

- 20-80MW solar power project planned, with RES to coordinate planning, permitting and development

- Permitting targeted for completion in 2010 and construction targeted to commence during 2011

- Mercator to hold minimum 70% interest in WSREC; RES to hold initial 10% with right to acquire up to 30% by contributing to construction costs

- New Mexico an optimal location for solar power development

Warm Springs Solar Project

The initial objective of the Warm Springs project is the construction of a 20MW solar power plant, with permitting targeted for completion by the end of 2010 and construction targeted to commence during 2011 subject to ongoing feasibility work. Feasibility and permitting is expected to cost up to US$750,000.

The estimated construction cost of a 20MW facility is in the range of US$60-80 million. It is anticipated that this capital requirement will be met by means of project-level debt and equity financing. Numerous innovative potential financing mechanisms taking advantage of available development incentives and tax schemes have been identified and are being evaluated in order to select the most advantageous solution.

Discussions have been initiated with a number of solar power plant constructors and technology providers. Both traditional flat plate photovoltaic and newer concentrating solar technologies are being evaluated.

WSREC believes that there may be potential for the expansion of the initial 20MW facility to 80MW capacity.

In addition to the sale of electricity, WSREC is exploring the potential for the sale of Renewable Energy Certificates ("RECs"), demand for which is expected to grow considerably in the US as under Renewable Portfolio Standard ("RPS") regulations, utilities are increasingly required to generate a substantial proportion of the electricity they sell from renewable sources. The purchase of RECs allows utilities to satisfy their RPS obligations.

The Warm Springs project will be operated and financed independently of Copper Flat, and Mercator's interest in WSREC and the Warm Springs project is unaffected by the sale of the Company's exclusive option to acquire a 100% interest in Copper Flat to THEMAC Resources Group Ltd.

Locality

From a climatic, regulatory and power transmission standpoint, New Mexico is an excellent location for solar energy development. The state has been designated to become a hub for the US power grid, which is being modified to achieve a greater degree of interconnection between different regions of the country.

Furthermore, New Mexico is seeking to become a centre for renewable energy and related industries, with the implication that the New Mexico authorities are expected to be supportive of the activities of WSREC. Grants, tax breaks and other incentives for renewable energy projects are available.

The Warm Springs project will be located, along with the Copper Flat project, in a rural area of New Mexico, and can be expected to boost local economic growth and aid economic diversification. This aligns with regional and national efforts to foster the development of renewable energy sources, and may provide additional opportunities for the Warm Springs project to qualify for federal development incentives.

Remote Energy Solutions, LLC

RES has particular expertise in providing renewable energy solutions to the mining sector, and will lead the development of the Warm Springs project. On this basis, Ann Carpenter, President of RES, has been appointed Chief Operating Officer of WSREC. RES will coordinate the state and federal permitting of the Warm Springs project, along with interconnection and transmission studies, stakeholder engagement, technology selection and financing.

RES is to be issued an initial 10% of WSREC's outstanding shares, and at such time as WSREC enters into a power purchase agreement or comparable instrument and makes arrangements to finance the construction of the Warm Springs project, RES may acquire an additional 15% of WSREC's outstanding shares by contributing 15% of WSREC's debt and equity capital requirements. At such time as WSREC enters into definitive agreements for construction financing, RES may acquire a further 5% of WSREC's outstanding shares by contributing a further 5% of WSREC's debt and equity capital requirements and reimbursing WSREC for 5% of its costs and expenses accrued to that date.

Benefits for Copper Flat Project

The development of the Warm Springs project is intended to be complementary to the recommencement of production at Copper Flat.

Although the reconnection of Copper Flat to the power grid would be straightforward, Copper Flat is likely to benefit from association with the Warm Springs project as a result of efficiencies that are expected to be realised in the permitting process and as a result of public awareness of Copper Flat being increased in a positive manner.

Potential sustainability initiatives for Copper Flat in the areas of energy efficiency and water conservation are also being researched.

ACS Asia

ACS Asia, the steel products business in which Mercator holds a 70% interest, is capable of providing the steelwork typically required for the construction of solar power facilities, and has already quoted on a number of contracts of this type in the US and Australia. Some 20-40% of the capital cost of a solar development is usually accounted for by steelwork.

ACS Asia is in a strong position to fulfil the steelwork requirements of the Warm Springs project, and continued exposure to the solar sector through WSREC is expected to assist ACS Asia in further developing its business in this field.

Patrick Harford, Managing Director of Mercator, comments:

"Copper Flat will have a genuine claim to be considered one of the most environmentally sustainable mines in the world on the basis of its association with the Warm Springs project.

Besides complementing the Copper Flat permitting process, the Warm Springs project is projected to be highly profitable in its own right, and the involvement of ACS Asia has the potential to aid the growth of that business substantially."

About the Copper Flat Project

Copper Flat is a former producing mine with substantial infrastructure still in place. Mercator, through its wholly owned subsidiary New Mexico Copper Corporation ("NMCC"), holds an exclusive option to acquire a 100% interest in Copper Flat.

The sale of Mercator's option over Copper Flat to THEMAC Resources Group Ltd ("THEMAC"), a company listed on the TSX Venture Exchange (ticker: MAC.H), is in the process of being completed.

As a result of the transaction Mercator will acquire a substantial interest in THEMAC and will therefore retain a very significant interest in Copper Flat's future development.

About Mercator

Mercator is a diversified mineral development company dedicated to creating value for its shareholders through a process of finding value, adding value and realising value. Mercator has an experienced management team with expertise in the structuring and execution of value accretive transactions.

For further information please contact:

Mercator Gold plc

Michael Silver, Chairman

Tel: +44 (0)20 7929 1010

Patrick Harford, Managing Director

Tel: +1 646 239 9087

Email: info@mercatorgold.com

Website: www.mercatorgold.com

Daniel Stewart & Company plc

Oliver Rigby

Tel: + 44 (0)20 7776 6550

Old Park Lane Capital plc

Forbes Cutler

Tel: +44 (0) 20 7518 2603

Bankside Consultants Ltd

Simon Rothschild/Oliver Winters

Tel: +44 (0) 20 7367 8888

Barry Kaplan Associates

Larry Kaplan

Tel: +1 732 747 0702

Copyright Business Wire 2010

Date   Source Headline
9th Jun 202212:43 pmBUSHolding(s) in Company
9th Jun 202210:37 amBUSHolding(s) in Company
8th Jun 20227:01 amBUSMultiple High Grade Gold Intercepts from hole BH3DD034 at HR3, Bailieston Victoria
31st May 20227:01 amBUSAppointment of Adam Jones as Technical Director, Exploration
4th May 20227:01 amBUSDrilling Identifies Further High Gold Grades at the Upper-Maori Anticline, Bailieston, Victoria
27th Apr 20227:00 amBUSECR Minerals Increases Shareholding in Danglay Gold Project From 25% to 70%
25th Apr 202212:15 pmBUSAGM Statement
25th Apr 20227:02 amBUSFurther re Exercise of Warrants Announced on Friday 22nd April 2022
22nd Apr 202211:08 amBUSWarrant Exercise
22nd Apr 20227:03 amBUSHighest Grade Gold Intercept yet Revealed Below Soil Anomaly at HR3, Bailieston
20th Apr 20222:04 pmBUSBlock listing Interim Review
11th Apr 20227:05 amBUSFurther re Andrew Haythorpe appointed as CEO
31st Mar 20221:51 pmBUSFinal Results
14th Mar 20227:05 amBUSVisible Gold Identified at HR3. Progress of Drilling Continues into the Maori Anticline Target
7th Mar 20222:40 pmBUSHolding(s) in Company
2nd Mar 20227:56 amBUSDrilling Continues to Extend Gold Mineralisation within the Maori Reef
23rd Feb 202210:51 amBUSHolding(s) in Company
11th Feb 20221:02 pmBUSCreswick Project Update
3rd Feb 20227:07 amBUSThree Exploration licences granted in the Lolworth Region, North Queensland
24th Jan 20227:30 amBUSDirector/PDMR Shareholding
24th Jan 20227:00 amBUSDirectorate change
10th Jan 20227:01 amBUSCreswick Exploration Licence Renewal Application EL006184
23rd Dec 202112:58 pmBUSFurther re Bailieston (HR3) Soil Sampling Strengthens Mineralisation Model
22nd Dec 20213:11 pmBUSECR Minerals (ECR) - Bailieston Drilling Update For Holes BH3DD010 and BH3DD011
22nd Dec 202111:39 amBUSHolding(s) in Company
15th Dec 20217:00 amBUSApproval of Two New Exploration Tenements in Victoria, Australia
2nd Dec 202111:00 amBUSHolding(s) in Company
2nd Dec 20217:00 amBUSPortfolio Update
29th Nov 20217:00 amBUSDrilling/Production Report - Replacement
26th Nov 20217:01 amBUSDrilling/Production Report
3rd Nov 202110:55 amBUSHolding(s) in Company
1st Nov 20217:00 amBUSDirectorate change
25th Oct 20211:04 pmBUSChange of Registered Office
25th Oct 20218:10 amBUSUpdate on Drilling Progress at (HR4) ‘Cherry Tree’
15th Oct 20213:55 pmBUSTR-1: Standard form for notification of major holdings
8th Oct 202110:13 amBUSBlock Listing Return
13th Sep 20217:29 amBUSProperty purchase within in the Bailieston License Area
2nd Sep 20217:00 amBUSProperty Purchase within the Creswick License Area
10th Aug 20211:11 pmBUSInitial drilling Results from Cherry Tree, Bailieston Gold Project, Victoria, Australia
30th Jul 20214:21 pmBUSCordillera Tiger Gold Resources Renews Exploration License EP-006 at Danglay Gold Project, N Philippines
29th Jul 20214:41 pmRNSSecond Price Monitoring Extn
29th Jul 20214:36 pmRNSPrice Monitoring Extension
27th Jul 20214:18 pmBUSPurchase of Second Drill Rig for Central Victorian Goldfields, Australia
19th Jul 20218:56 amBUSDrilling Success at Creswick Gold Project, Victoria, Australia
16th Jul 202110:22 amBUSRESIGNATION OF CONSULTANT
7th Jul 20217:00 amBUSApproval Queensland Gold Work Programmes Australia
1st Jul 20219:28 amBUSAnticline Identified Close to Maori Reef Line at the Bailieston Gold Project
29th Jun 20217:58 amBUSHalf-year Report
22nd Jun 20218:15 amBUSEarly Success at Creswick Gold Project, Victoria, Australia
15th Jun 20219:45 amBUSHigh Gold and Antimony Results from Soil Sampling, Victoria, Australia

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.