Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.30
Bid: 0.29
Ask: 0.31
Change: -0.005 (-1.64%)
Spread: 0.02 (6.897%)
Open: 0.305
High: 0.305
Low: 0.295
Prev. Close: 0.305
ECR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Anticline Identified Close to Maori Reef Line at the Bailieston Gold Project

1 Jul 2021 09:28

 

1 July 2021

ECR MINERALS plc

(“ECR Minerals”, “ECR” or the “Company”)

ANTICLINE IDENTIFIED CLOSE TO MAORI REEF LINE AT THE BAILIESTON GOLD PROJECT

ECR Minerals plc (LON: ECR), the gold exploration and development company focussed on gold exploration in Australia, is pleased to announce drilling updates across the Bailieston Project in central Victoria, Australia.

ECR Minerals plc has 100% ownership of Bailieston Project which is operated under their Australian owned subsidiary Mercator Gold Australia Pty Ltd (“MGA”).

Craig Brown, Chief Executive Officer of ECR Minerals plc, commented:

“I am delighted to announce a highly significant development resulting from the aggressive drilling programmes currently underway in the Victoria Goldfields. ECR Minerals has the advantage of owning its own diamond drilling rig and, with a centralised operational hub at Bendigo, we have been able to swiftly and efficiently interpret the core samples and secure valuable data from the programmes.

As suspected by our senior geologists, logging of three diamond holes at the Maori and Dan Genders Reef at the HR3 prospect has confirmed a steep south-plunging anticline to exist sub-parallel to the Maori Reef line which hosts quartz-arsenopyrite mineralisation and elevated gold grades.

Most significantly, the data and presence of gold in the core samples confirms the south plunging anti-cline runs close to the historical mined portions of the Maori Reef. The additional drilling planned for the northern end of the zone will help us further understand the size and shape of the structure in order that we can determine next exploration steps.”

KEY POINTS

Four initial diamond drill holes have been completed into the Maori and Dan Genders Reef lines for a total of 869.3m.Structural logging of three diamond holes now confirms a steep south-plunging anticline that exists sub-parallel to the Maori Reef line which hosts quartz-arsenopyrite mineralisation with elevated gold grades. 3D projections of this folding are spatially associated with high-grade historic percussion drill intersections.

PROGRESS AT BAILIESTON GOLD PROJECT

First pass diamond drilling has been completed over the Maori and Dan Genders Reef lines. A summary of these four diamond holes is as follows;

BH3DD005 was drilled to investigate the merging of the Hard Up Reef and the Maori Reef structures beneath historic gold workings. The Hard Up Reef was intersected down the hole at 62.4m and is present as strongly oxidised fracturing with silica alteration. Only elevated gold was detected from this part of the reef (0.5m @ 0.80 g/t Au). The Maori Reef was intersected at 94.8m grading (0.8m @ 0.58 g/t Au). Plotting of bedding measurements in 3D software shows the hole drilled through the nose of a fold where the Maori Reef was intersected. Increasing silica alteration with disseminated pyrite is present on the immediate western limb of this fold. Assay results show the pyrite-silica zone to carry above background gold grades (0.2-0.5 g/t Au) within the fire assay analysis of the tails of the cyanide-leachwell solution. This is indicating the pyrite is carrying a refractory gold component. Another quartz-stockwork zone was drilled through at 140m (1m @ 2.89 g/t Au). The hole ended at 174.3m.

BH3DD006 was drilled to investigate a postulated anticline through the central part of the HR3 goldfield and possibly hosting the Dan Genders Reef system. Structural logging shows the Dan Genders Reef to be hosted within west dipping sediments. Assays from this Reef returned low grades from 70.3m down-hole (0.8m @ 0.86 g/t Au). The drillhole was continued to look for the fold into east dipping sediments. This fold was intersected at a drilled depth of 225m. Accompanying this fold was bedding parallel quartz-sulphide mineralisation with assays returning (0.7m @ 1.25 g/t Au) from 224.6m. Drilling continued across the fold where another unknown narrow bedded laminated quartz vein was drilled through at 342.7m depth. This intercept was the best from this hole (0.3m @ 6.06 g/t Au) from 342.7m. This drillhole ended at 344.7m. 3D modelling of bedding shows the fold axis drilled through at 225m projects up-dip to the fold drilled through at 95m in BH3DD005. This fold plunges approximately -40 degrees to the south. The up-dip projection of this fold to surface coincides with the historic Maori mine workings and a high-grade historic percussion drill hole from a previous explorer during the late 1980’s (1m @ 34 g/t Au) from 44m depth in hole BLP136. Mineralisation associated with this fold will need to be investigated further.

BH3DD007 3D projections of quartz veins and the plunge of the fold at 225m downhole in BH3DD006 hypothesised quartz veins to potentially roll over the fold hinge and become limb-thrust hosted within the east dipping beds on the eastern side of the fold further to the north of BH3DD006. BH3DD007 drilled through the fold at a drilled depth of 185.35m. Accompanying the fold was a laminated quartz vein showing fine acicular arsenopyrite needles that assayed (0.65m @ 2.90 g/t Au) from 185.35m. A supplementary rubbly quartz zone giving off high arsenic readings using a pXRF was also drilled through at 43.9m depth. Assays from this zone shows the potential of broader, low-grade gold mineralisation in the oxide levels. Assays from 43.9m (5.3m @ 0.70 g/t Au, including 0.55m @ 1.08g/t Au from 44.65m), accompanied by lower grades ranging between 0.51 and 0.89 g/t Au. Due to poor drill recoveries within this oxide zone, BH3DD008 was collared 10m away from BH3DD007 and drilled to 96.1m. Best result was (0.8m @ 0.38 g/t Au from 37.3m).

Table 1 Summary of averaged grade mineralised drill intercepts BH3DD005-BH3DD008 (g/t Au)

DD HOLE

From (metres)

Interval (metres)

@ g/t Au

Geological Comment

BH3DD005

140

1

2.89

Quartz stockwork zone

BH3DD006

 

BH3DD006

224.6

 

342.7

0.7

 

0.3

1.25

 

6.06

Anticline structure

 

Bedded laminated vein

BH3DD007

 

BH3DD007

185.35

 

44.65

0.65

 

0.55

2.90

 

1.08

Arsenopyrite needles

 

Part of broad mineralisation 5.3m @ 0.70 g/t Au from 43.9m

BH3DD008

37.3

0.8

0.38

Shallow re-drilled hole twinning BH3DD007

PHASE TWO DRILLING

Structural measurements of diamond drill core combined with 3D modelling have proved a steep south plunging anticline to now exist sub-parallel along strike to the Maori Reef line. Spatially, intense historical mined portions of the Maori Reef and high-grade percussion drill results from previous explorers coincide with the up-dip projection of the anticlinal fold.

Drilling to date has confirmed the presence of gold associated with the anticline along strike and depth to the south. Further diamond holes will be drilled in strategic positions to understand the structural controls on the high-grade portions of veins associated with this fold.

Plans for diamond drilling on the northern end of this fold zone have been submitted for approval. These plans are part of a larger campaign to drill underneath recent high-grade soil anomalies in this central and northern part of the goldfield (see previous release 15th June 2021).

REVIEW OF ANNOUNCEMENT BY QUALIFIED PERSON

This announcement has been reviewed by Adam Jones, a director of ECR Minerals plc. Adam Jones is a professional geologist and is a Member of the Australian Institute of Geoscientists (MAIG). He is a qualified person as that term is defined by the AIM Note for Mining, Oil and Gas Companies.

MARKET ABUSE REGULATIONS (EU) No. 596/2014

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR). Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

FOR FURTHER INFORMATION, PLEASE CONTACT:

ECR Minerals plc

 

Tel: +44 (0)20 7929 1010

 

David Tang, Non-Executive Chairman

 

 

 

Craig Brown, Director & CEO

 

 

 

Email:

info@ecrminerals.com

 

 

 

Website: www.ecrminerals.com

 

 

 

 

 

 

 

WH Ireland Ltd

 

Tel: +44 (0)161 832 2174

 

Nominated Adviser

 

 

 

 

 

 

 

SI Capital Ltd

 

Tel: +44 (0)1483 413500

 

Broker

 

 

 

Nick Emerson

Novum Securities Limited

Broker

Jon Belliss

 

Tel: +44 (0)20 7399 9425

 

 

Brand CommunicationsPublic Relations

Alan Green

Tel: +44 (0) 7976 431608

ABOUT ECR MINERALS PLC

ECR Minerals is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Ltd (“MGA”) has 100% ownership of the Bailieston and Creswick gold projects in central Victoria, Australia, has eight licence applications outstanding including two licence applications lodged in eastern Victoria. (Tambo gold project). MGA is currently drilling at both the Bailieston and Creswick projects and has an experienced exploration team with significant local knowledge in the Victoria Goldfields and wider region.

https://mercatorgold.com.au/

ECR also owns 100% of an Australian subsidiary LUX Exploration Pty Ltd (“LUX”) which has three licence applications covering 900 km2 covering a relatively unexplored area in Queesnland, Australia.

https://luxexploration.com/

Following the sale of the Avoca, Moormbool and Timor gold projects in Victoria, Australia to Fosterville South Exploration Ltd (TSX-V: FSX) and the subsequent spin-out of the Avoca and Timor projects to Leviathan Gold Ltd (TSX-V: LVX), MGA has the right to receive up to A$2 million in payments subject to future resource estimation or production at any of those projects.

ECR has earned a 25% interest in the Danglay gold project; an advanced exploration project located in a prolific gold and copper mining district in the north of the Philippines, and holds a royalty on the SLM gold project in La Rioja Province, Argentina.

View source version on businesswire.com: https://www.businesswire.com/news/home/20210701005328/en/

Copyright Business Wire 2021

Date   Source Headline
18th Apr 20247:05 amRNSSalary Sacrifice, Admission of Shares and TVR
8th Apr 20247:06 amRNSCreswick drill results indicate larger ore bodies
2nd Apr 20247:00 amRNSAnnual Report & Audited Results YE 30th Sept 2023
14th Mar 20247:04 amRNSPlacing raises £585,000 & Joint Broker Appointed
14th Mar 20247:02 amRNSIssue of Equity, Total Voting Rights, PDMR Dealing
15th Feb 20241:36 pmRNSBoard Changes
5th Feb 20249:55 amRNSPreliminary findings from Creswick drilling
23rd Jan 20247:03 amRNSBoard Change
15th Jan 202412:46 pmRNSFurther re the sale of Non-Core Assets
10th Jan 20247:04 amRNSReview of Lolworth Project
18th Dec 20237:05 amRNSSale of Non-Core Assets
14th Dec 20237:01 amRNSIssue of Equity, Total Voting Rights, PDMR Dealing
12th Dec 202310:50 amRNSDrilling Underway at the Creswick Project
11th Dec 20237:04 amRNSUpdate on Planned Drilling at Creswick
1st Dec 20237:18 amRNSSalary Sacrifice Share Admission and TVR
24th Nov 20231:18 pmRNSECR Board members attending Mines and Money
20th Nov 20237:04 amRNSLolworth Results Suggest Extended Mineralisation
16th Nov 202310:55 amRNSCorrection - Director Share Agreements
16th Nov 20237:36 amRNSUpdate on Drilling & Director Share Agreements
31st Oct 20237:05 amRNSGold Bearing Quartz Veins Discovered at Lolworth
23rd Oct 20237:04 amRNSEncouraging Gold Results from Lolworth Project
20th Oct 20235:09 pmRNSCancellation of Share Options
20th Oct 20234:56 pmRNSTermination of option to acquire Hurricane Project
6th Oct 20234:08 pmRNSResult of General Meeting & Total Voting Rights
5th Oct 20237:05 amRNSHurricane: Final Rock Chip Results & Prospectivity
2nd Oct 20237:04 amRNSHurricane Option Extension & Rock Chip Results
27th Sep 202311:07 amRNSAdditional License Application at Kondaparinga
25th Sep 20239:18 amBUSExtended Gold Prospectivity and Niobium Bullseye Discovery at the Lolworth Project
21st Sep 202310:34 amBUSAsset Overview and Evaluation
19th Sep 20237:34 amBUSPosting of Circular, Notice of GM, Directors Share Agreements & PDMR Dealing
18th Sep 20237:04 amBUSConditional Fundraise of £580,000 & Proposed General Meeting
15th Sep 20231:12 pmBUSBoard and Management Changes
15th Aug 20233:09 pmBUSGold & Niobium Rock Chip Results from the Lolworth Project
10th Aug 20237:15 amBUSRock Chip Results from Tambo Licence EL7484 and Renewal of Bailieston Licence EL5433
8th Aug 20237:06 amBUSLatest Results for Lolworth Gold, Niobium, Tantalum and REE Samples
20th Jul 20233:15 pmBUSFurther Gold Results from Soil Sampling at Quartz Hill, Creswick
19th Jul 20232:57 pmBUSInitial interpretations of pXRF analysis from the first Lolworth Range Niobium Soil Grid
12th Jul 202312:18 pmBUSPotential Exploration Targets Defined from LIDAR Survey at Hurricane Project
30th Jun 202310:42 amBUSHalf-year Report
25th May 202312:38 pmBUSPotential for Rare Earth Minerals at the Lolworth Range Project, Queensland
22nd May 20237:59 amBUSVictoria Exploration and Queensland Project Updates
9th May 20238:30 amBUS2023 Exploration Season Commences at the Lolworth Range Project, Queensland
9th May 20237:04 amBUSFunds From Sale of Bailieston Property Now Received
2nd May 20233:32 pmBUSFurther Gold Results from Creswick Soil Sampling Campaign
24th Apr 202310:12 amBUSResult of AGM
17th Apr 20238:08 amBUSIssue of Options
17th Apr 20237:04 amBUSLatest Results from Soil Sampling at the Creswick Project
5th Apr 202311:20 amBUSProposed Acquisition of Blue Mountain Project, Queensland
3rd Apr 20237:05 amBUSFinal Niobium and Tantalum Stream Results Extend Anomalous Footprint at Lolworth Range Project, Queensland
3rd Apr 20237:00 amBUSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.