Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.285
Bid: 0.27
Ask: 0.30
Change: -0.005 (-1.72%)
Spread: 0.03 (11.111%)
Open: 0.29
High: 0.31
Low: 0.285
Prev. Close: 0.29
ECR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Positive Trenching Results from Itogon Gold Project, Philippines

6 Jul 2015 07:00

ECR MINERALS plc(“ECR Minerals”, “ECR” or the “Company”)

AIM: ECRUS OTC: MTGDY

POSITIVE TRENCHING RESULTS FROMITOGON GOLD PROJECT, PHILIPPINES

LONDON: 6 JULY 2015 - The directors of ECR Minerals plc (the “Directors”) are pleased to announce positive results from trenching at the Itogon epithermal gold project, northern Philippines. The trenching was completed during May and June 2015 and comprised 13 trenches totalling 430.6m. Mineralised intervals from the trenching are presented in Table 1 below.

In addition, 12 test pits were excavated in areas too steep or otherwise inaccessible for trenching. Further assay results in respect of various trenches and all test pits are pending.

HIGHLIGHTS

* Mineralised intervals from trenching (apparent width) include:

60m at 2.43 g/t gold in TR09 (includes interval of 42m at 2.54 g/t gold announced 18 June 2015)28.6m at 3.61 g/t gold in TR09 (separate and additional to the interval above)18m at 1.71 g/t gold in TR0559m at 1.32 g/t gold in TR0510m at 1.39 g/t gold in TR02

* Very high grades encountered in TR09 including:

1m at 16.74 g/t gold from 10m1m at 42.29 g/t gold from 28m1m at 79.67 g/t gold from 84m

Stephen Clayson, Chief Executive Officer of ECR, commented:

“These encouraging results provide further positive indications as to the potential of the supergene enriched oxide gold blanket which occurs from surface in the main prospect area at Itogon, and we look forward to receiving and reporting the remainder of the assay results from the trenching and test pitting programme.

Work at the project during July 2015 is expected to focus on formulating a cohesive geological model for the purposes of the planned resource estimate and accompanying NI43-101 technical report. The Directors anticipate that this report will be completed during September 2015.

This work will include efforts to better understand the controls on the very high grade mineralisation encountered in TR09 and in earlier phases of sampling, as well as in the reverse circulation drilling carried out in 2014.”

TABLE 1: MINERALISED INTERVALS
ECR TRENCHING PROGRAMME 2015
ITOGON GOLD PROJECT, PHILIPPINES
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR02 0 10 10 1.39 4m at 1.73 g/t from 0m, 2m at 1.67 g/t from 8m
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR05 0 59 59 1.32 4m at 1.39 g/t from 4m; 4m at 1.40 g/t from 20m; 4m at 1.33 g/t from 24m; 4m at 1.50 g/t from 28m; 5m at 1.83 g/t from 36m; 1m at 1.22 g/t from 41m; 1m at 1.76 g/t from 42m; 1m at 3.83 g/t from 43m; 1m at 4.62 g/t from 44m; 1m at 1.57 g/t from 45m; 1m at 1.11 g/t from 46m; 1m at 4.32 g/t from 48m; 1m at 2.18 g/t from 49m; 1m at 1.32 g/t from 50m; 1m at 2.01 g/t from 51m; 1m at 2.07 g/t from 57m; 1m at 1.47 g/t from 58m
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR07 5 6 1 0.45
17 20 3 0.77
25 28 3 0.71 1m at 1.44 g/t from 25m
31 35 4 0.77 1m at 1.80 g/t from 33m
37 38 1 0.39
43 47 4 0.90
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR07A 0 8 8 0.94 4m at 1.74 g/t from 4m
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR08 2 10 8 0.48 1m at 1.11 g/t from 9m
12 15 3 0.43
24 26 2 0.47
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR09 1 61 60 2.43

1m at 5.33 g/t from 2m; 1m at 2.34 g/t from 7m; 1m at 16.74 g/t from 10m; 1m at 1.14 g/t from 13m; 1m at 2.44 g/t from 18m; 1m at 1.18 g/t from 21m; 1m at 1.21 g/t from 25m; 1m at 42.29 g/t from 28m; 1m at 8.78 g/t from 29m; 1m at 1.32 g/t from 31m; 1m at 4.51 g/t from 34m; 1m at 5.11 g/t from 40m; 1m at 1.24 g/t from 41m; 1m at 2.32 g/t from 47m; 1m at 1.60 g/t from 48; 1m at 1.23 g/t from 49m; 1m at 2.27 g/t from 52m; 4m at 6.81 g/t from 53m

TR09 69 97.6 28.6 3.61

2m at 1.23 g/t from 77m; 1m at 1.15 g/t from 79m; 1m at 2.78 g/t from 81m; 1m at 79.67 g/t from 84m; 2.6m at 1.07 g/t from 95m

NB:

Mineralised intervals were calculated as weighted averages using a cut-off grade of 0.30 g/t gold and a maximum of 1m internal dilution. As a result certain reported intervals contain discrete higher grade intervals that are separated by lower grade mineralisation. In these cases the grade of each single sample which exceeded 1.00 g/t gold has been reported separately. No top cut has been applied in calculating mineralised intervals. All widths given in this announcement are apparent width.

A map pertaining to the exploration results reported today may be viewed at: http://www.ecrminerals.com/itogon-drill-holes-trenching-test-pitting

QA/QC

A secure chain of custody was maintained in the transport and storage of all samples, which were shipped to and analysed by Intertek Testing Services Philippines, Inc. (“Intertek”), an internationally accredited independent analytical laboratory in Metro Manila. Sampling was carried out under geological supervision. Upon arrival at Intertek samples were sorted, dried (if necessary), crushed, split and pulverised. The method of analysis for gold was fire assay (50g charge) with AAS finish.

QA/QC measures including the use of certified standards were implemented by ECR and separately by Intertek in relation to the analysis of the samples. The assay data reported is considered acceptable in the context of these measures. Assay values have been expressed in this news release as g/t gold but are received from Intertek expressed as ppm gold. For the purposes hereof ppm gold and g/t can be considered equivalent.

The contents of this announcement have been reviewed by Dr Chris Wilson PhD, FAusIMM (CP), FSEG, a geologist with the consultancy Exploration Alliance, which has been engaged by ECR in connection with the Itogon project.

ABOUT ECR

ECR is a mineral exploration and development company with, among other interests, the right to earn a 50% interest in the Itogon gold project in the Philippines. Itogon is an advanced exploration project located in a gold and copper mining district in the north of the Philippines.

ECR has a 100% interest in the SLM gold project in La Rioja Province, Argentina, the exploration strategy for which is to delineate multiple medium to high grade, low tonnage deposits suitable for advancement to production on a relatively low capital, near term basis.

ECR continues to review potential new investments on a highly selective basis, with a concentration on precious, base and strategic metals projects in Asia and South America.

FOR FURTHER INFORMATION PLEASE CONTACT:

ECR Minerals plc Tel: +44 (0)20 7929 1010William (Bill) Howell, Non-Executive ChairmanStephen Clayson, Director & CEORichard (Dick) Watts, Technical Director

Email: info@ecrminerals.comWebsite: www.ecrminerals.com

Cairn Financial Advisers LLP Tel: +44 (0)207 148 7900Nominated AdviserEmma Earl/Jo Turner

Daniel Stewart & Company plc Tel: +44 (0)20 7776 6550BrokerMartin Lampshire

FORWARD LOOKING STATEMENTS

This announcement may include forward looking statements. Such statements may be subject to a number of known and unknown risks, uncertainties and other factors that could cause actual results or events to differ materially from current expectations. There can be no assurance that such statements will prove to be accurate and therefore actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking statements. Any forward looking statements contained herein speak only as of the date hereof (unless stated otherwise) and, except as may be required by applicable laws or regulations (including the AIM Rules for Companies), the Company disclaims any obligation to update or modify such forward looking statements as a result of new information, future events or for any other reason.

GLOSSARY

AAS: atomic absorption spectroscopy
assay: a test performed on a sample of ores or minerals to determine the amount of valuable metals contained
NI43-101: Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects
epithermal: mineralisation produced by near surface hydrothermal fluids related to igneous activity; originally defined as having formed in the range 50-300°C

g:

grams

g/t: grams per tonne
m: metre
oxidation: a chemical reaction caused by exposure to oxygen that results in a change in the chemical composition of a mineral
oxide gold blanket: said of gold that has been liberated from sulphides during the process of oxidation to form a surficial, sub-horizontal to horizontal zone or ‘blanket’
ppm: parts per million
supergene enrichment:

said of a mineral deposit formed at or just below the Earth’s surface, generally through downward percolation of rainwater, resulting in liberation of gold through oxidation of sulphides, and its concentration and enrichment within a given horizon

t: tonne
test pit: a pit dug through the upper parts of the soil profile or overburden to expose bedrock veins and structures
trench: a long, narrow excavation dug through the upper parts of the soil profile or overburden to expose bedrock veins and structures

View source version on businesswire.com: http://www.businesswire.com/news/home/20150705005027/en/

Copyright Business Wire 2015

Date   Source Headline
15th Feb 20131:31 pmBUSTHEMAC Resources Update
11th Feb 20134:14 pmBUSCOMPLETION OF GOLD CREST SALE
31st Jan 20132:47 pmBUSTotal Voting Rights
31st Jan 20139:51 amBUSBOARD CHANGES
14th Jan 201311:52 amBUSResult of General Meeting and Update
28th Dec 20129:37 amBUSFinancing Update
24th Dec 20127:00 amBUSDisposal of Interest in Gold Crest and Its Subsidiary, ACS
19th Dec 20121:15 pmBUSTHEMAC RESOURCES UPDATE
6th Dec 20123:39 pmBUSTHEMAC Resources News Release
30th Nov 201212:00 pmBUSTotal Voting Rights
23rd Nov 20123:31 pmBUSIssue of Equity
19th Nov 201211:57 amBUSDirectorate Change
15th Nov 20121:47 pmBUSNegotiations re Sale of Shareholding in Gold Crest Holdings Ltd
30th Oct 20124:57 pmBUSIssue of Equity
25th Oct 20124:07 pmBUSEL ABRA GOLD PROSPECT UPDATE
22nd Oct 20127:00 amBUSUPDATE ON ACTIVITIES
3rd Oct 201210:13 amBUSHolding(s) in Company
3rd Oct 20127:52 amBUSTHEMAC Begins Work On Definitive Feasibility Study For Copper Flat Project
28th Sep 201212:17 pmBUSTotal Voting Rights
18th Sep 201210:44 amBUSUnderground Sampling in Progress at El Abra Gold Prospect
31st Aug 20126:08 pmBUSIssue of Equity - Replacement
31st Aug 20124:00 pmBUSECR's INTEREST IN THEMAC RESOURCES GROUP
31st Aug 201212:20 pmBUSTotal Voting Rights
29th Aug 20127:00 amBUSHolding(s) in Company
23rd Aug 20127:53 amBUSThemac Resources Files Copper Flat Prefeasibility Study
16th Aug 20123:00 pmBUSIssue of Equity
9th Aug 20121:00 pmBUSTHEMAC Resources Announces Further Positive Drill Results from Copper Flat Project
7th Aug 20127:00 amBUSProgress Update
31st Jul 20122:28 pmBUSTotal Voting Rights
20th Jul 201211:36 amBUSDirector/PDMR Shareholding
20th Jul 20129:57 amBUSDirector/PDMR Shareholding
19th Jul 20124:40 pmBUSDirector/PDMR Shareholding
19th Jul 20121:48 pmBUSTHEMAC Resources Announces Positive Results of Copper Flat Prefeasibility Study
10th Jul 20121:22 pmBUSIssue of Equity
2nd Jul 20127:00 amBUSTotal Voting Rights
29th Jun 20127:00 amBUSHalf-yearly Report
27th Jun 201212:47 pmBUSPositive Drilling Update from THEMAC Resources
14th Jun 20125:05 pmBUSHolding(s) in Company
14th Jun 20124:54 pmBUSIssue of Equity
31st May 201211:18 amBUSTotal Voting Rights
25th May 20127:00 amBUSStrategic Update and Appointment of Experienced Mining Engineer to Board of Directors
21st May 20127:00 amBUSDrilling Report
16th May 201211:30 amBUSHolding(s) in Company
15th May 20124:31 pmBUSIssue of Equity
15th May 201212:03 pmBUSDirectorate Change
9th May 20123:17 pmBUSArgentina Drilling Update
8th May 201210:56 amBUSDirectorate Change
27th Apr 20127:30 amRNSRestoration - ECR Minerals Plc
27th Apr 20127:00 amRNSRestoration of Trading/Drilling Report
26th Apr 20129:51 amRNSTemporary Suspension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.