Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.27
Bid: 0.26
Ask: 0.28
Change: 0.00 (0.00%)
Spread: 0.02 (7.692%)
Open: 0.27
High: 0.27
Low: 0.27
Prev. Close: 0.27
ECR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Positive Trenching Results from Itogon Gold Project, Philippines

6 Jul 2015 07:00

ECR MINERALS plc(“ECR Minerals”, “ECR” or the “Company”)

AIM: ECRUS OTC: MTGDY

POSITIVE TRENCHING RESULTS FROMITOGON GOLD PROJECT, PHILIPPINES

LONDON: 6 JULY 2015 - The directors of ECR Minerals plc (the “Directors”) are pleased to announce positive results from trenching at the Itogon epithermal gold project, northern Philippines. The trenching was completed during May and June 2015 and comprised 13 trenches totalling 430.6m. Mineralised intervals from the trenching are presented in Table 1 below.

In addition, 12 test pits were excavated in areas too steep or otherwise inaccessible for trenching. Further assay results in respect of various trenches and all test pits are pending.

HIGHLIGHTS

* Mineralised intervals from trenching (apparent width) include:

60m at 2.43 g/t gold in TR09 (includes interval of 42m at 2.54 g/t gold announced 18 June 2015)28.6m at 3.61 g/t gold in TR09 (separate and additional to the interval above)18m at 1.71 g/t gold in TR0559m at 1.32 g/t gold in TR0510m at 1.39 g/t gold in TR02

* Very high grades encountered in TR09 including:

1m at 16.74 g/t gold from 10m1m at 42.29 g/t gold from 28m1m at 79.67 g/t gold from 84m

Stephen Clayson, Chief Executive Officer of ECR, commented:

“These encouraging results provide further positive indications as to the potential of the supergene enriched oxide gold blanket which occurs from surface in the main prospect area at Itogon, and we look forward to receiving and reporting the remainder of the assay results from the trenching and test pitting programme.

Work at the project during July 2015 is expected to focus on formulating a cohesive geological model for the purposes of the planned resource estimate and accompanying NI43-101 technical report. The Directors anticipate that this report will be completed during September 2015.

This work will include efforts to better understand the controls on the very high grade mineralisation encountered in TR09 and in earlier phases of sampling, as well as in the reverse circulation drilling carried out in 2014.”

TABLE 1: MINERALISED INTERVALS
ECR TRENCHING PROGRAMME 2015
ITOGON GOLD PROJECT, PHILIPPINES
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR02 0 10 10 1.39 4m at 1.73 g/t from 0m, 2m at 1.67 g/t from 8m
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR05 0 59 59 1.32 4m at 1.39 g/t from 4m; 4m at 1.40 g/t from 20m; 4m at 1.33 g/t from 24m; 4m at 1.50 g/t from 28m; 5m at 1.83 g/t from 36m; 1m at 1.22 g/t from 41m; 1m at 1.76 g/t from 42m; 1m at 3.83 g/t from 43m; 1m at 4.62 g/t from 44m; 1m at 1.57 g/t from 45m; 1m at 1.11 g/t from 46m; 1m at 4.32 g/t from 48m; 1m at 2.18 g/t from 49m; 1m at 1.32 g/t from 50m; 1m at 2.01 g/t from 51m; 1m at 2.07 g/t from 57m; 1m at 1.47 g/t from 58m
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR07 5 6 1 0.45
17 20 3 0.77
25 28 3 0.71 1m at 1.44 g/t from 25m
31 35 4 0.77 1m at 1.80 g/t from 33m
37 38 1 0.39
43 47 4 0.90
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR07A 0 8 8 0.94 4m at 1.74 g/t from 4m
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR08 2 10 8 0.48 1m at 1.11 g/t from 9m
12 15 3 0.43
24 26 2 0.47
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR09 1 61 60 2.43

1m at 5.33 g/t from 2m; 1m at 2.34 g/t from 7m; 1m at 16.74 g/t from 10m; 1m at 1.14 g/t from 13m; 1m at 2.44 g/t from 18m; 1m at 1.18 g/t from 21m; 1m at 1.21 g/t from 25m; 1m at 42.29 g/t from 28m; 1m at 8.78 g/t from 29m; 1m at 1.32 g/t from 31m; 1m at 4.51 g/t from 34m; 1m at 5.11 g/t from 40m; 1m at 1.24 g/t from 41m; 1m at 2.32 g/t from 47m; 1m at 1.60 g/t from 48; 1m at 1.23 g/t from 49m; 1m at 2.27 g/t from 52m; 4m at 6.81 g/t from 53m

TR09 69 97.6 28.6 3.61

2m at 1.23 g/t from 77m; 1m at 1.15 g/t from 79m; 1m at 2.78 g/t from 81m; 1m at 79.67 g/t from 84m; 2.6m at 1.07 g/t from 95m

NB:

Mineralised intervals were calculated as weighted averages using a cut-off grade of 0.30 g/t gold and a maximum of 1m internal dilution. As a result certain reported intervals contain discrete higher grade intervals that are separated by lower grade mineralisation. In these cases the grade of each single sample which exceeded 1.00 g/t gold has been reported separately. No top cut has been applied in calculating mineralised intervals. All widths given in this announcement are apparent width.

A map pertaining to the exploration results reported today may be viewed at: http://www.ecrminerals.com/itogon-drill-holes-trenching-test-pitting

QA/QC

A secure chain of custody was maintained in the transport and storage of all samples, which were shipped to and analysed by Intertek Testing Services Philippines, Inc. (“Intertek”), an internationally accredited independent analytical laboratory in Metro Manila. Sampling was carried out under geological supervision. Upon arrival at Intertek samples were sorted, dried (if necessary), crushed, split and pulverised. The method of analysis for gold was fire assay (50g charge) with AAS finish.

QA/QC measures including the use of certified standards were implemented by ECR and separately by Intertek in relation to the analysis of the samples. The assay data reported is considered acceptable in the context of these measures. Assay values have been expressed in this news release as g/t gold but are received from Intertek expressed as ppm gold. For the purposes hereof ppm gold and g/t can be considered equivalent.

The contents of this announcement have been reviewed by Dr Chris Wilson PhD, FAusIMM (CP), FSEG, a geologist with the consultancy Exploration Alliance, which has been engaged by ECR in connection with the Itogon project.

ABOUT ECR

ECR is a mineral exploration and development company with, among other interests, the right to earn a 50% interest in the Itogon gold project in the Philippines. Itogon is an advanced exploration project located in a gold and copper mining district in the north of the Philippines.

ECR has a 100% interest in the SLM gold project in La Rioja Province, Argentina, the exploration strategy for which is to delineate multiple medium to high grade, low tonnage deposits suitable for advancement to production on a relatively low capital, near term basis.

ECR continues to review potential new investments on a highly selective basis, with a concentration on precious, base and strategic metals projects in Asia and South America.

FOR FURTHER INFORMATION PLEASE CONTACT:

ECR Minerals plc Tel: +44 (0)20 7929 1010William (Bill) Howell, Non-Executive ChairmanStephen Clayson, Director & CEORichard (Dick) Watts, Technical Director

Email: info@ecrminerals.comWebsite: www.ecrminerals.com

Cairn Financial Advisers LLP Tel: +44 (0)207 148 7900Nominated AdviserEmma Earl/Jo Turner

Daniel Stewart & Company plc Tel: +44 (0)20 7776 6550BrokerMartin Lampshire

FORWARD LOOKING STATEMENTS

This announcement may include forward looking statements. Such statements may be subject to a number of known and unknown risks, uncertainties and other factors that could cause actual results or events to differ materially from current expectations. There can be no assurance that such statements will prove to be accurate and therefore actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking statements. Any forward looking statements contained herein speak only as of the date hereof (unless stated otherwise) and, except as may be required by applicable laws or regulations (including the AIM Rules for Companies), the Company disclaims any obligation to update or modify such forward looking statements as a result of new information, future events or for any other reason.

GLOSSARY

AAS: atomic absorption spectroscopy
assay: a test performed on a sample of ores or minerals to determine the amount of valuable metals contained
NI43-101: Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects
epithermal: mineralisation produced by near surface hydrothermal fluids related to igneous activity; originally defined as having formed in the range 50-300°C

g:

grams

g/t: grams per tonne
m: metre
oxidation: a chemical reaction caused by exposure to oxygen that results in a change in the chemical composition of a mineral
oxide gold blanket: said of gold that has been liberated from sulphides during the process of oxidation to form a surficial, sub-horizontal to horizontal zone or ‘blanket’
ppm: parts per million
supergene enrichment:

said of a mineral deposit formed at or just below the Earth’s surface, generally through downward percolation of rainwater, resulting in liberation of gold through oxidation of sulphides, and its concentration and enrichment within a given horizon

t: tonne
test pit: a pit dug through the upper parts of the soil profile or overburden to expose bedrock veins and structures
trench: a long, narrow excavation dug through the upper parts of the soil profile or overburden to expose bedrock veins and structures

View source version on businesswire.com: http://www.businesswire.com/news/home/20150705005027/en/

Copyright Business Wire 2015

Date   Source Headline
27th Apr 20127:00 amRNSRestoration of Trading/Drilling Report
26th Apr 20129:51 amRNSTemporary Suspension
26th Apr 20129:50 amRNSSuspension - ECR Minerals Plc
13th Apr 20127:00 amBUSDrilling Update
2nd Apr 20127:00 amBUSResult of AGM
30th Mar 20124:55 pmBUSDirectorate Change
30th Mar 20121:44 pmBUSTotal Voting Rights
27th Mar 20122:21 pmBUSDirector/PDMR Shareholding
27th Mar 20128:00 amBUSDrilling Commences at El Abra Gold Prospect in Argentina
27th Mar 20128:00 amBUSDirectorate Change
21st Mar 20127:00 amBUSTHEMAC Resources Announces Significant Increase in Copper Flat Project Design Milling Rate
15th Mar 20127:55 amBUSHolding(s) in Company
7th Mar 201210:32 amBUSFinal Results
6th Mar 201212:32 pmBUSChange of Registered Office
27th Feb 20124:42 pmBUSIssue of Equity
14th Feb 201211:26 amBUSHolding(s) in Company
7th Feb 20129:32 amBUSHighly Positive Results Received from Sierra De Las Minas Metallurgical Testwork
1st Feb 201210:58 amBUSCopper Flat Project Exceeds 1 Billion lbs Copper in Measured & Indicated Resources
31st Jan 20122:44 pmBUSTotal Voting Rights
26th Jan 20127:00 amBUSECR Minerals: A $9M Sale of South African Exploration Assets by West Wits Mining
20th Jan 20124:55 pmBUSIssue of Equity
11th Jan 20121:44 pmBUSHolding(s) in Company
6th Jan 20122:49 pmBUSHolding(s) in Company
4th Jan 201210:00 amBUSArgentina Project Update
30th Dec 201112:25 pmBUSTotal Voting Rights
23rd Dec 201111:53 amBUSHolding(s) in Company
20th Dec 20117:00 amBUSIncrease in Paniai Gold Shareholding & Financing Update
12th Dec 20112:14 pmBUSArgentina Gold Project Update
8th Dec 201112:33 pmBUSTHEMAC Resources Provides Further Results from 2011 Drilling at Copper Flat Project
7th Dec 201111:53 amBUSHolding(s) in Company
6th Dec 20114:04 pmBUSDirector/PDMR Shareholding
2nd Dec 20112:57 pmBUSArgentina Project Update
29th Nov 20114:23 pmBUSDirector/PDMR Shareholding
21st Nov 20117:00 amBUSTHEMAC Resources Provides Initial Results of 2011 Copper Flat Project Drilling Programme
15th Nov 20112:59 pmBUSHolding(s) in Company
8th Nov 201110:41 amBUSHolding(s) in Company
31st Oct 20113:00 pmBUSTotal Voting Rights
17th Oct 20114:13 pmBUSDirector/PDMR Shareholding
13th Oct 20114:07 pmBUSIssue of Equity
7th Oct 20117:00 amBUSThemac Resources Provides Copper Flat Project Update
3rd Oct 20117:41 amBUSUnchimé Iron Ore Project Update
23rd Sep 20117:00 amBUSAdditional High Grade Gold Assays from Sierra de las Minas Sampling
15th Sep 20117:00 amBUSArgentina Exploration Update
16th Aug 20113:28 pmBUSDirector/PDMR Shareholding
15th Aug 201111:00 amBUSUpdate
29th Jul 20112:53 pmBUSTotal Voting Rights
8th Jul 20115:07 pmBUSIssue of Equity
6th Jul 20115:00 pmBUSDirector/PDMR Shareholding
5th Jul 20117:00 amBUSUnchimé Iron Project, Argentina
30th Jun 201110:50 amBUSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.