Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

Share Price is delayed by 15 minutes
Get Live Data
0.245    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.03 (13.043%)
Market Cap: £8.68m
ECR Live PriceLast checked at - London Stock Exchange

Intraday ECR Minerals Share Chart

Argentina Exploration Update

15 Sep 2011 07:00

ECR MINERALS plc("ECR Minerals", "ECR" or the "Company")

AIM: ECRUS OTC: MTGDY

Argentina Exploration Update

ECR Minerals plc is pleased to provide the following update on exploration within its Sierra de las Minas gold project area in La Rioja Province, Argentina.

High grades including 32.5 g/t gold, 21.9 g/t gold and 14.5 g/t gold returned by surface geochemical sampling of 13 prospects Maestro Agüero prospect identified as a high grade quartz vein system with a minimum strike length of 350m Geophysical survey at El Abra gold prospect to commence during September

ECR commenced the second phase of its 2011 sampling programme for the Sierra de las Minas gold project area, in which the Company holds a 100% interest, in late July. The objective of this phase has been to evaluate known prospects within the project area and prioritise them for further exploration. The first phase of the programme was completed earlier in the year at the El Abra prospect, yielding numerous high grade results. For more information please refer to the Company's announcement dated 15 May 2011.

Assay results for 58 samples taken during July and August have now been received, with the best results given in the table below. Assay results are awaited for a further 25 samples. Historic results reportedly obtained from the same prospects by La Plata Gold, a Canadian company which conducted exploration in the Sierra de las Minas area during the 1990s and early 2000s, are also included in the table for comparison purposes. The Company considers the divergence between its sampling results and those of La Plata Gold for the same prospects to be within expected bounds. It was not the Company's objective to resample the precise locations sampled by La Plata Gold.

All samples specified in the table below were prepared for fire assay and ICP elemental analysis by ACME Analytical Laboratories in Mendoza, Argentina. ACME Analytical Laboratories is certified to ISO 9001 and ISO/IEC 17025 standards.

Sample ID &

Prospect

Au g/t

La Plata Gold

Sample ID

Au g/t
Maestro Agüero
J11SLM246 2.00 4000 88.37
J11SLM247 13.20 4001 33.20
J11SLM248 21.90 4002 27.52
J11SLM251 6.00 4003 10.20
J11SLM252 4.30 4004 2.08
J11SLM254 6.50
J11SLM257 4.70
J11SLM258 11.80
Mina San Antonio
J11SLM208 1.10 3961 4.99
J11SLM210 14.60 3962 0.01
J11SLM211 13.50
Casas Viejas
J11SLM221 0.08 3925 3.54
J11SLM218 32.50 3926 36.00
J11SLM221 14.50
Mina Azul
J11SLM204 15.30
Casa Viejas Body
J11SLM225 0.33
Agua de las Burras
J11SLM285 4.70
J11SLM286 0.20
J11SLM288 0.70
Burro Blanco
J11SLM280 11.90
J11SLM281 1.50
Veta Oculta
J11SLM270 1.50
Suturas
J11SLM282 6.80

The majority of the 13 prospects sampled by the Company during July and August present as mineralised outcropping "pod" systems integrated into localised and regional shear structures. On the surface mineralisation occurs as discontinuous quartz veins embedded in shear belts.

Of these 13 prospects, four (Maestro Agüero, Mina San Antonio, Casa Viejas and Mina Azul, representing a combined potential strike length of approximately 800m) are judged to be priority targets for further work. Anomalous base metal values, including high grade copper, were returned at a number of the prospects, and further exploration will proceed with a view to ascertaining whether these base metal values are of economic significance.

Maestro Agüero is at present considered to be the Company's highest priority target at Sierra de las Minas, aside from the El Abra prospect. Preliminary investigation indicates that Maestro Agüero is a shear hosted vein system with a strike length demonstrated by outcropping of some 350m and inferred continuity exceeding 550m. The outcropping quartz veins within the shear show abundant haematite, copper oxide and visible gold mineralisation.

More detailed sampling of Maestro Agüero, Mina San Antonio, Casa Viejas and Mina Azul is planned. The Company will also proceed to evaluate and prioritise additional prospects through preliminary mapping and sampling. Only around 30 per cent of the prospects known to exist within the Sierra de las Minas project area have been sampled by the Company so far.

A ground based pole-dipole geophysical survey is scheduled to commence at the El Abra prospect later this month. This survey will aid detailed planning of the 1-2,000m drilling programme proposed to take place at El Abra later this year. The drilling programme will commence at the El Abra prospect but could potentially be extended to encompass other prospects within the Sierra de las Minas project area.

Patrick Harford, Managing Director of ECR Minerals plc, comments:

"The achievement of consistent high grade assays from sampling in the Sierras Las Minas complex continues to generate excitement within ECR, and further work will now begin to focus on developing our knowledge of zones that may be economic to mine.

The Company has sampled approximately 2km of vein length at Sierra de las Minas so far, and with mineralised widths at surface frequently exceeding one metre and samples obtained to date from sections identified as potentially suitable for selective mining returning an average grade greater than 8 g/t gold, the possibility of mining and transporting high grade ores to an existing plant elsewhere may now be considered. This may provide an inexpensive and relatively rapid route to cashflow from the Sierra de las Minas project.

The geophysical programme due to commence at El Abra this month is expected to enhance our geological understanding of the prospect enormously and is intended to allow ECR to derive maximum value from the proposed drilling programme, which will have the objective of confirming the grade and extent of mineralisation at depth.

It should be noted that in the Sierras de las Minas region only 10 historic drill holes are known to have been completed. Six of these holes targeted the Las Callanas vein set, which lies to the southwest of El Abra outside the ECR project area. The best Las Callanas intersection reported was 24.3 g/t gold from 143.9-144.5m down hole, demonstrating not only continuity of vein thickness but also the presence of high grade mineralisation at depth. The Company considers this to be encouraging from the point of view of its proposed drilling at El Abra."

About ECR Minerals

ECR is a mineral development company with interests in the USA, Argentina, Indonesia, Thailand and Australia.

ECR Minerals plcMichael Silver, ChairmanPatrick Harford, Managing DirectorStephen Clayson, Director & Chief Financial OfficerLuca Tenuta, Non-Executive Director+44 (0)20 7929 1010info@ecrminerals.comwww.ecrminerals.comorDaniel Stewart & Company plcOliver Rigby/Tessa Smith, +44 (0)20 7776 6550orOld Park Lane Capital plcMichael Parnes, +44 (0)20 7493 8188orBlythe Weigh CommunicationsAna Ribeiro, +44 (0)20 7138 3204orBarry Kaplan AssociatesLarry Kaplan, +1 732 747 0702

Mr Howard Coates MSc., P.Geo, Vice President and Partner of MPH Consulting Ltd, who has more than 40 years of experience in the mining and exploration industry, is acting as a geological consultant to ECR with respect to its activities in Argentina. Mr Coates has reviewed the contents of this announcement.

Historic exploration results have not been verified by the Company or by MPH Consulting Ltd.

Glossary

Au: chemical symbol for gold

g/t: grams per tonne

m: metre

Copyright Business Wire 2011

Date   Source Headline
29th May 20265:00 pmRNSTotal Voting Rights
18th May 20267:00 amRNSCompletion of Acquisition of Paleogold Limited
6th May 20267:00 amRNSIssue of Equity, Option Grant and TVR
27th Apr 20267:00 amRNSOperations Update
20th Apr 20267:00 amRNSProposed acquisition of Paleogold Limited
27th Mar 202612:46 pmRNSResult of Annual General Meeting
16th Mar 20267:00 amRNSUpdate on Royalty of up to A$2 Million
16th Mar 20267:00 amRNSUpdate on Royalty of up to A$2 Million
5th Mar 20267:00 amRNSFinancial Results for Year Ended 30 September 2025
2nd Mar 20267:00 amRNSAward of Tambo South tenement
10th Feb 20267:15 amRNSRaglan initial mining plan
3rd Feb 20267:00 amRNSRaglan offtake partner identified
30th Jan 20265:00 pmRNSTotal Voting Rights
26th Jan 20267:00 amRNSRaglan Production Plan Underway
15th Jan 20264:55 pmRNSHolding in Company
8th Jan 20267:00 amRNS£1.5 million placing & appointment of Joint Broker
7th Jan 20267:00 amRNSECR's Raglan Project to enter production phase
2nd Jan 20267:00 amRNSIssue of Equity and Total Voting Rights
2nd Jan 20267:00 amRNSIssue of Equity and Total Voting Rights
30th Dec 20259:00 amRNSCompletion of acquisition of Raglan Project
30th Dec 20259:00 amRNSCompletion of acquisition of Raglan Project
23rd Dec 202511:30 amRNS2025 Operational Highlights
23rd Dec 202511:30 amRNS2025 Operational Highlights
23rd Dec 20257:00 amRNSUpdated website and change of registered office
23rd Dec 20257:00 amRNSUpdated website and change of registered office
18th Dec 20257:00 amRNSSale and Purchase agreement for Raglan Project
12th Dec 20257:00 amRNSBlue Mountain drilling results & operations update
1st Dec 20257:00 amRNSStrong Maiden Drill Results & Operations Update
27th Nov 20257:00 amRNSDirectorate Change
25th Nov 20257:00 amRNS-RInitiation of research by Allenby Capital
11th Nov 20257:00 amRNSOperations update
31st Oct 20255:00 pmRNSTotal Voting Rights
17th Oct 20259:00 amRNSIssue of Equity and Total Voting Rights
17th Oct 20257:00 amRNSCorporate and Operational Update
6th Oct 20257:00 amRNSSignificantly oversubscribed WRAP Retail Offer
3rd Oct 20257:00 amRNSUpdate on Raglan Project site visit
1st Oct 20251:00 pmRNSWRAP Retail Offer for up to £100,000
1st Oct 202511:30 amRNSProposed Acquisition, Subscription & Other Matters
18th Sep 20259:00 amRNSJV heads of terms to advance the Creswick Project
15th Sep 20257:00 amRNSGold mineralisation confirmed at Blue Mountain
8th Sep 20257:00 amRNSAppointment of Chris Gibbs as a Proposed Director
27th Aug 20257:00 amRNSBlue Mountain drilling completed
22nd Aug 202511:00 amRNSAppointment of Bitcoin & Digital Asset Consultant
18th Aug 20257:00 amRNSBlue Mountain Gold Project – Exploration Update
8th Aug 20257:00 amRNSDirectorate Change
7th Aug 20257:00 amRNSBitcoin & Digital Asset Treasury Management Policy
4th Aug 20257:00 amRNSOperations update and TVR
1st Aug 20257:00 amRNSDirectorate change
31st Jul 20255:00 pmRNSTotal Voting Rights
2nd Jul 20257:00 amRNSIssue of Equity and Total Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.