Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.265
Bid: 0.26
Ask: 0.27
Change: 0.00 (0.00%)
Spread: 0.01 (3.846%)
Open: 0.265
High: 0.265
Low: 0.265
Prev. Close: 0.265
ECR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Positive Trenching Results from Itogon Gold Project, Philippines

6 Jul 2015 07:00

ECR MINERALS plc(“ECR Minerals”, “ECR” or the “Company”)

AIM: ECRUS OTC: MTGDY

POSITIVE TRENCHING RESULTS FROMITOGON GOLD PROJECT, PHILIPPINES

LONDON: 6 JULY 2015 - The directors of ECR Minerals plc (the “Directors”) are pleased to announce positive results from trenching at the Itogon epithermal gold project, northern Philippines. The trenching was completed during May and June 2015 and comprised 13 trenches totalling 430.6m. Mineralised intervals from the trenching are presented in Table 1 below.

In addition, 12 test pits were excavated in areas too steep or otherwise inaccessible for trenching. Further assay results in respect of various trenches and all test pits are pending.

HIGHLIGHTS

* Mineralised intervals from trenching (apparent width) include:

60m at 2.43 g/t gold in TR09 (includes interval of 42m at 2.54 g/t gold announced 18 June 2015)28.6m at 3.61 g/t gold in TR09 (separate and additional to the interval above)18m at 1.71 g/t gold in TR0559m at 1.32 g/t gold in TR0510m at 1.39 g/t gold in TR02

* Very high grades encountered in TR09 including:

1m at 16.74 g/t gold from 10m1m at 42.29 g/t gold from 28m1m at 79.67 g/t gold from 84m

Stephen Clayson, Chief Executive Officer of ECR, commented:

“These encouraging results provide further positive indications as to the potential of the supergene enriched oxide gold blanket which occurs from surface in the main prospect area at Itogon, and we look forward to receiving and reporting the remainder of the assay results from the trenching and test pitting programme.

Work at the project during July 2015 is expected to focus on formulating a cohesive geological model for the purposes of the planned resource estimate and accompanying NI43-101 technical report. The Directors anticipate that this report will be completed during September 2015.

This work will include efforts to better understand the controls on the very high grade mineralisation encountered in TR09 and in earlier phases of sampling, as well as in the reverse circulation drilling carried out in 2014.”

TABLE 1: MINERALISED INTERVALS
ECR TRENCHING PROGRAMME 2015
ITOGON GOLD PROJECT, PHILIPPINES
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR02 0 10 10 1.39 4m at 1.73 g/t from 0m, 2m at 1.67 g/t from 8m
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR05 0 59 59 1.32 4m at 1.39 g/t from 4m; 4m at 1.40 g/t from 20m; 4m at 1.33 g/t from 24m; 4m at 1.50 g/t from 28m; 5m at 1.83 g/t from 36m; 1m at 1.22 g/t from 41m; 1m at 1.76 g/t from 42m; 1m at 3.83 g/t from 43m; 1m at 4.62 g/t from 44m; 1m at 1.57 g/t from 45m; 1m at 1.11 g/t from 46m; 1m at 4.32 g/t from 48m; 1m at 2.18 g/t from 49m; 1m at 1.32 g/t from 50m; 1m at 2.01 g/t from 51m; 1m at 2.07 g/t from 57m; 1m at 1.47 g/t from 58m
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR07 5 6 1 0.45
17 20 3 0.77
25 28 3 0.71 1m at 1.44 g/t from 25m
31 35 4 0.77 1m at 1.80 g/t from 33m
37 38 1 0.39
43 47 4 0.90
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR07A 0 8 8 0.94 4m at 1.74 g/t from 4m
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR08 2 10 8 0.48 1m at 1.11 g/t from 9m
12 15 3 0.43
24 26 2 0.47
Trench ID From To Width Average Grade Including
(m) (g/t Au)
TR09 1 61 60 2.43

1m at 5.33 g/t from 2m; 1m at 2.34 g/t from 7m; 1m at 16.74 g/t from 10m; 1m at 1.14 g/t from 13m; 1m at 2.44 g/t from 18m; 1m at 1.18 g/t from 21m; 1m at 1.21 g/t from 25m; 1m at 42.29 g/t from 28m; 1m at 8.78 g/t from 29m; 1m at 1.32 g/t from 31m; 1m at 4.51 g/t from 34m; 1m at 5.11 g/t from 40m; 1m at 1.24 g/t from 41m; 1m at 2.32 g/t from 47m; 1m at 1.60 g/t from 48; 1m at 1.23 g/t from 49m; 1m at 2.27 g/t from 52m; 4m at 6.81 g/t from 53m

TR09 69 97.6 28.6 3.61

2m at 1.23 g/t from 77m; 1m at 1.15 g/t from 79m; 1m at 2.78 g/t from 81m; 1m at 79.67 g/t from 84m; 2.6m at 1.07 g/t from 95m

NB:

Mineralised intervals were calculated as weighted averages using a cut-off grade of 0.30 g/t gold and a maximum of 1m internal dilution. As a result certain reported intervals contain discrete higher grade intervals that are separated by lower grade mineralisation. In these cases the grade of each single sample which exceeded 1.00 g/t gold has been reported separately. No top cut has been applied in calculating mineralised intervals. All widths given in this announcement are apparent width.

A map pertaining to the exploration results reported today may be viewed at: http://www.ecrminerals.com/itogon-drill-holes-trenching-test-pitting

QA/QC

A secure chain of custody was maintained in the transport and storage of all samples, which were shipped to and analysed by Intertek Testing Services Philippines, Inc. (“Intertek”), an internationally accredited independent analytical laboratory in Metro Manila. Sampling was carried out under geological supervision. Upon arrival at Intertek samples were sorted, dried (if necessary), crushed, split and pulverised. The method of analysis for gold was fire assay (50g charge) with AAS finish.

QA/QC measures including the use of certified standards were implemented by ECR and separately by Intertek in relation to the analysis of the samples. The assay data reported is considered acceptable in the context of these measures. Assay values have been expressed in this news release as g/t gold but are received from Intertek expressed as ppm gold. For the purposes hereof ppm gold and g/t can be considered equivalent.

The contents of this announcement have been reviewed by Dr Chris Wilson PhD, FAusIMM (CP), FSEG, a geologist with the consultancy Exploration Alliance, which has been engaged by ECR in connection with the Itogon project.

ABOUT ECR

ECR is a mineral exploration and development company with, among other interests, the right to earn a 50% interest in the Itogon gold project in the Philippines. Itogon is an advanced exploration project located in a gold and copper mining district in the north of the Philippines.

ECR has a 100% interest in the SLM gold project in La Rioja Province, Argentina, the exploration strategy for which is to delineate multiple medium to high grade, low tonnage deposits suitable for advancement to production on a relatively low capital, near term basis.

ECR continues to review potential new investments on a highly selective basis, with a concentration on precious, base and strategic metals projects in Asia and South America.

FOR FURTHER INFORMATION PLEASE CONTACT:

ECR Minerals plc Tel: +44 (0)20 7929 1010William (Bill) Howell, Non-Executive ChairmanStephen Clayson, Director & CEORichard (Dick) Watts, Technical Director

Email: info@ecrminerals.comWebsite: www.ecrminerals.com

Cairn Financial Advisers LLP Tel: +44 (0)207 148 7900Nominated AdviserEmma Earl/Jo Turner

Daniel Stewart & Company plc Tel: +44 (0)20 7776 6550BrokerMartin Lampshire

FORWARD LOOKING STATEMENTS

This announcement may include forward looking statements. Such statements may be subject to a number of known and unknown risks, uncertainties and other factors that could cause actual results or events to differ materially from current expectations. There can be no assurance that such statements will prove to be accurate and therefore actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking statements. Any forward looking statements contained herein speak only as of the date hereof (unless stated otherwise) and, except as may be required by applicable laws or regulations (including the AIM Rules for Companies), the Company disclaims any obligation to update or modify such forward looking statements as a result of new information, future events or for any other reason.

GLOSSARY

AAS: atomic absorption spectroscopy
assay: a test performed on a sample of ores or minerals to determine the amount of valuable metals contained
NI43-101: Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects
epithermal: mineralisation produced by near surface hydrothermal fluids related to igneous activity; originally defined as having formed in the range 50-300°C

g:

grams

g/t: grams per tonne
m: metre
oxidation: a chemical reaction caused by exposure to oxygen that results in a change in the chemical composition of a mineral
oxide gold blanket: said of gold that has been liberated from sulphides during the process of oxidation to form a surficial, sub-horizontal to horizontal zone or ‘blanket’
ppm: parts per million
supergene enrichment:

said of a mineral deposit formed at or just below the Earth’s surface, generally through downward percolation of rainwater, resulting in liberation of gold through oxidation of sulphides, and its concentration and enrichment within a given horizon

t: tonne
test pit: a pit dug through the upper parts of the soil profile or overburden to expose bedrock veins and structures
trench: a long, narrow excavation dug through the upper parts of the soil profile or overburden to expose bedrock veins and structures

View source version on businesswire.com: http://www.businesswire.com/news/home/20150705005027/en/

Copyright Business Wire 2015

Date   Source Headline
23rd Apr 202411:48 amRNSResult of AGM
23rd Apr 20247:02 amRNSAGM Statement
18th Apr 20247:05 amRNSSalary Sacrifice, Admission of Shares and TVR
8th Apr 20247:06 amRNSCreswick drill results indicate larger ore bodies
2nd Apr 20247:00 amRNSAnnual Report & Audited Results YE 30th Sept 2023
14th Mar 20247:04 amRNSPlacing raises £585,000 & Joint Broker Appointed
14th Mar 20247:02 amRNSIssue of Equity, Total Voting Rights, PDMR Dealing
15th Feb 20241:36 pmRNSBoard Changes
5th Feb 20249:55 amRNSPreliminary findings from Creswick drilling
23rd Jan 20247:03 amRNSBoard Change
15th Jan 202412:46 pmRNSFurther re the sale of Non-Core Assets
10th Jan 20247:04 amRNSReview of Lolworth Project
18th Dec 20237:05 amRNSSale of Non-Core Assets
14th Dec 20237:01 amRNSIssue of Equity, Total Voting Rights, PDMR Dealing
12th Dec 202310:50 amRNSDrilling Underway at the Creswick Project
11th Dec 20237:04 amRNSUpdate on Planned Drilling at Creswick
1st Dec 20237:18 amRNSSalary Sacrifice Share Admission and TVR
24th Nov 20231:18 pmRNSECR Board members attending Mines and Money
20th Nov 20237:04 amRNSLolworth Results Suggest Extended Mineralisation
16th Nov 202310:55 amRNSCorrection - Director Share Agreements
16th Nov 20237:36 amRNSUpdate on Drilling & Director Share Agreements
31st Oct 20237:05 amRNSGold Bearing Quartz Veins Discovered at Lolworth
23rd Oct 20237:04 amRNSEncouraging Gold Results from Lolworth Project
20th Oct 20235:09 pmRNSCancellation of Share Options
20th Oct 20234:56 pmRNSTermination of option to acquire Hurricane Project
6th Oct 20234:08 pmRNSResult of General Meeting & Total Voting Rights
5th Oct 20237:05 amRNSHurricane: Final Rock Chip Results & Prospectivity
2nd Oct 20237:04 amRNSHurricane Option Extension & Rock Chip Results
27th Sep 202311:07 amRNSAdditional License Application at Kondaparinga
25th Sep 20239:18 amBUSExtended Gold Prospectivity and Niobium Bullseye Discovery at the Lolworth Project
21st Sep 202310:34 amBUSAsset Overview and Evaluation
19th Sep 20237:34 amBUSPosting of Circular, Notice of GM, Directors Share Agreements & PDMR Dealing
18th Sep 20237:04 amBUSConditional Fundraise of £580,000 & Proposed General Meeting
15th Sep 20231:12 pmBUSBoard and Management Changes
15th Aug 20233:09 pmBUSGold & Niobium Rock Chip Results from the Lolworth Project
10th Aug 20237:15 amBUSRock Chip Results from Tambo Licence EL7484 and Renewal of Bailieston Licence EL5433
8th Aug 20237:06 amBUSLatest Results for Lolworth Gold, Niobium, Tantalum and REE Samples
20th Jul 20233:15 pmBUSFurther Gold Results from Soil Sampling at Quartz Hill, Creswick
19th Jul 20232:57 pmBUSInitial interpretations of pXRF analysis from the first Lolworth Range Niobium Soil Grid
12th Jul 202312:18 pmBUSPotential Exploration Targets Defined from LIDAR Survey at Hurricane Project
30th Jun 202310:42 amBUSHalf-year Report
25th May 202312:38 pmBUSPotential for Rare Earth Minerals at the Lolworth Range Project, Queensland
22nd May 20237:59 amBUSVictoria Exploration and Queensland Project Updates
9th May 20238:30 amBUS2023 Exploration Season Commences at the Lolworth Range Project, Queensland
9th May 20237:04 amBUSFunds From Sale of Bailieston Property Now Received
2nd May 20233:32 pmBUSFurther Gold Results from Creswick Soil Sampling Campaign
24th Apr 202310:12 amBUSResult of AGM
17th Apr 20238:08 amBUSIssue of Options
17th Apr 20237:04 amBUSLatest Results from Soil Sampling at the Creswick Project
5th Apr 202311:20 amBUSProposed Acquisition of Blue Mountain Project, Queensland

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.