Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

Share Price is delayed by 15 minutes
Get Live Data
0.245    0.00 (0.00%)
Bid:
0.23
Ask:
0.26
Spread: 0.03 (13.043%)
Market Cap: £8.68m
ECR Live PriceLast checked at - London Stock Exchange

Intraday ECR Minerals Share Chart

Copper Flat Project Update

21 Apr 2010 07:00

MERCATOR GOLD plc("Mercator Gold", "Mercator" or "the Company")

AIM: MCRUS OTC: MTGDY

Copper Flat Project Update

London 21 April 2010

Mercator Gold plc, the diversified mineral development company, is pleased to provide an update on the Copper Flat copper-gold-molybdenum-silver project ("Copper Flat") in New Mexico, USA, over which Mercator's wholly owned subsidiary New Mexico Copper Corporation ("NMCC") holds an exclusive option.

As announced on 16 March 2010, Mercator has entered into a binding heads of agreement for the sale of NMCC to THEMAC Resources Group Ltd ("THEMAC"), a company listed on the TSX Venture Exchange (ticker: MAC.H).

As a result of the sale of NMCC Mercator will acquire a substantial interest in THEMAC, and will therefore retain a very significant interest in the Copper Flat project's future development.

Highlights

- A complete set of assays has been received for the drilling programme concluded at Copper Flat on 8 February 2010, which totalled 5,041.5ft over seven drill holes.

- Highlights subsequent to the last drilling report by the Company include an intersection of 144.5ft (44.0m) at 0.46% copper, 0.024% molybdenum, 0.122 g/t gold and 4.7 g/t silver and an intersection of 1,200ft (365.8m) at 0.25% copper, 0.006% molybdenum, 0.112 g/t gold and 2.1 g/t silver.

- All historic mineralisation types were intersected during the programme and new areas for resource development were identified below and adjacent to the extent of the historic pit model.

- An independent reserve/resource update for the Copper Flat deposit is expected to be available in May 2010.

- A final report on the pulp re-assay programme that commenced in late 2009 is due in April. Results received to date confirm historic drill results.

Patrick Harford, Managing Director of Mercator, comments:

"NMCC's drilling programme at Copper Flat has fulfilled its key objectives, and we look forward to the completion of an independent reserve/resource update in May."

Drilling Objectives

The major objectives of the programme were to verify the historic reserves/resources of the deposit and to identify new areas for resource development adjacent to and below the extent of the historic pit model.

These potential new resources were noted by Pincock, Allen & Holt in their 1999 audit of the project, and it is anticipated that additional low grade and some high grade resources will be estimated in these areas in future.

Secondary objectives of the programme included providing updated geotechnical and environmental information, evaluating grade continuity between sections and identifying additional drill targets.

Two drill rigs were deployed and 5,041.5ft of core was produced from seven drill holes, totalling 525 samples. The samples were sent to Skyline Assayers & Laboratories of Tucson, Arizona, USA, a fully accredited analytical lab. Assays were performed for copper, molybdenum, silver and gold. Some 33 check samples have been sent to the ALS Chemex lab in Reno, Nevada, USA.

Standard procedures for core handling were in place during the programme, with core being logged into the core facility at every shift change. A geologist was on site for all sample preparation and shipping.

Full Assay Results

CF-09-01

Intersection

ft m Cu% Mo% Au (g/t) Ag (g/t)
entire hole 847.5 258.3 0.25 0.006 0.094 2.1
258-836.5ft 578.5 176.3 0.28 0.000
308-578.5ft 270.5 82.4 0.30 0.007 0.144 2.4
CF-10-02
Intersection ft m Cu% Mo% Au (g/t) Ag (g/t)
entire hole 141.5 43.1 0.35 0.002 0.13 3.4
CF-10-03
Intersection ft m Cu% Mo% Au (g/t) Ag (g/t)
entire hole 1041 317.3 0.52 0.002 0.13 3.9
16.5-753ft 736.5 224.5 0.61 0.002
0-848ft 848 258.5 0.15 4.5
125-840ft 715 217.9 0.030
16.5-445.5ft 428.5 130.6 0.73 0.023 6.0
CF-10-04
Intersection ft m Cu% Mo% Au (g/t) Ag (g/t)
entire hole 1014.5 309.2 0.21 0.007 0.078 2.1
0-266ft 266 81.1 0.04 0.009 0.133 4.2
CF-10-05
Intersection ft m Cu% Mo% Au (g/t) Ag (g/t)
entire hole 602.5 183.6 0.30 0.007 0.125 2.8
0-269ft 269 82.0 0.34 0.010 0.125 3.1
CF-10-06
Intersection ft m Cu% Mo% Au (g/t) Ag (g/t)
entire hole 1200 365.8 0.25 0.006 0.112 2.1
0-747ft 747 227.7 0.30 0.007 0.148 2.8
CF-10-06b
Intersection ft m Cu% Mo% Au (g/t) Ag (g/t)
entire hole 199.5 60.8 0.38 0.019 0.104 3.8
55-199.5ft 144.5 44.0 0.46 0.024 0.122 4.7

Pulp Re-Assay Programme

Around 10% of an approximate 14,000 sample pulps available from historic drilling carried out at Copper Flat by Quintana Minerals from 1974-1979 are being re-assayed, with a final report due in April. Results received to date confirm historic drill results.

About the Copper Flat Project

Copper Flat is a former producing mine with substantial infrastructure still in place. The Copper Flat deposit has historic reserves of 50.21 million short tons at an average grade of 0.45% Cu, 0.1244 g/t Au, 2.053 g/t Ag and 0.015% Mo, based on a cut-off grade of 0.23% Cu.

On the basis of current historic reserves and assuming metal prices of US$3/lb copper, US$10/lb molybdenum, US$900/oz gold and US$13/oz silver, the Copper Flat project is estimated to have an NPV of US$348 million and an IRR of 45%, assuming initial capital costs of US$115 million for the recommencement of production and a discount rate of 8% (figures sourced from a preliminary review of the project carried out by an independent consulting group in August 2009). The current price of copper is in excess of US$3/lb.

Corrections to Drilling Report of 18 February 2010

i) The entire-hole Cu grade of CF10-03 was initially reported as 0.44% over 1,041ft, but subsequent review of the data shows the Cu grade to be 0.52%.

ii) CF09-02 was drilled to 141.5ft rather than 126ft. The extra core has been located, logged, and assayed, and the assays have been entered into the database. The restated entire-hole grade of CF09-02 is 0.35% Cu, 0.002% Mo, 0.130 g/t Au, and 3.4g/t Ag.

iii) The entire-hole Ag grade of CF09-01 was initially reported as 2.34 g/t, but subsequent review of the data shows the Ag grade to be 2.10 g/t.

iv) Total drilling completed during the programme was 5,041.5ft, rather than 5,005ft as initially reported.

This announcement has been reviewed by John R. King and Mark I. Pfau, both registered geologists and Qualified Persons under Canadian NI43-101.

About Mercator

Mercator is a diversified mineral development company dedicated to creating value for its shareholders through a process of finding value, adding value and realising value. Mercator has an experienced management team with expertise in the structuring and execution of value accretive transactions.

For further information please contact:

Mercator Gold plc

Michael Silver, Chairman Tel: +44 (0) 20 7929 1010
Patrick Harford, Managing Director Tel: +1 646 239 9087

Email: info@mercatorgold.com

Website: www.mercatorgold.com

Daniel Stewart & Company plc

Oliver Rigby Tel: + 44 (0) 20 7776 6550

Old Park Lane Capital plc

Forbes Cutler Tel: +44 (0) 20 7518 2603

Bankside Consultants Ltd

Simon Rothschild/Oliver Winters Tel: +44 (0) 20 7367 8888

Barry Kaplan Associates

Larry Kaplan Tel: +1 732 747 0702

Copyright Business Wire 2010

Date   Source Headline
10th Aug 20237:15 amBUSRock Chip Results from Tambo Licence EL7484 and Renewal of Bailieston Licence EL5433
8th Aug 20237:06 amBUSLatest Results for Lolworth Gold, Niobium, Tantalum and REE Samples
20th Jul 20233:15 pmBUSFurther Gold Results from Soil Sampling at Quartz Hill, Creswick
19th Jul 20232:57 pmBUSInitial interpretations of pXRF analysis from the first Lolworth Range Niobium Soil Grid
12th Jul 202312:18 pmBUSPotential Exploration Targets Defined from LIDAR Survey at Hurricane Project
30th Jun 202310:42 amBUSHalf-year Report
25th May 202312:38 pmBUSPotential for Rare Earth Minerals at the Lolworth Range Project, Queensland
22nd May 20237:59 amBUSVictoria Exploration and Queensland Project Updates
9th May 20238:30 amBUS2023 Exploration Season Commences at the Lolworth Range Project, Queensland
9th May 20237:04 amBUSFunds From Sale of Bailieston Property Now Received
2nd May 20233:32 pmBUSFurther Gold Results from Creswick Soil Sampling Campaign
24th Apr 202310:12 amBUSResult of AGM
17th Apr 20238:08 amBUSIssue of Options
17th Apr 20237:04 amBUSLatest Results from Soil Sampling at the Creswick Project
5th Apr 202311:20 amBUSProposed Acquisition of Blue Mountain Project, Queensland
3rd Apr 20237:05 amBUSFinal Niobium and Tantalum Stream Results Extend Anomalous Footprint at Lolworth Range Project, Queensland
3rd Apr 20237:00 amBUSFinal Results
23rd Mar 20237:16 amBUSFurther Stream Sampling Results Identify New Gold Anomalies at Lolworth Range Project, Queensland
3rd Mar 20233:01 pmBUSDiamond Drilling Programme commences at Creswick
1st Mar 20237:04 amBUSSecond ECR Drill Rig Arrives At Melbourne
24th Feb 20237:09 amBUSFurther High-Grade Gold Intercepts at Blue Moon Prospect, Bailieston, Victoria
22nd Feb 20237:06 amBUSDanglay Gold Project shareholding increases to 90%
15th Feb 20237:02 amBUSSale of Bailieston Property Raises A$670,000
7th Feb 20237:17 amBUSInsitu Rock Chip Sampling at Creswick Licences EL006184 and EL006713
1st Feb 202310:19 amBUSFurther Gold, Lithium, Tantalum and Niobium Samples Identified at Lolworth Range Project, Queensland
23rd Jan 20237:50 amBUSDrilling Progress Report for the Blue Moon Prospect at Bailieston, Victoria
23rd Jan 20237:05 amBUSSoil Geochemistry Results from Creswick License EL006184
3rd Jan 20237:38 amBUSApproval Received For Two Further Exploration Tenements in Victoria, Australia
23rd Dec 20227:09 amBUSLithium-Tantalum-Niobium Stream Anomalies Identified at Lolworth, Queensland
22nd Dec 20227:05 amBUSNew Parallel Gold System Identified at Creswick, Victoria
13th Dec 20221:56 pmBUSNew Exploration Tenements EL006911 and EL006912 granted at Bailieston, Victoria
12th Dec 202212:45 pmBUSMultiple visible gold occurrences and pegmatites observed at Lolworth, Queensland
12th Dec 202211:08 amBUSEquity Placing to Raise GBP900,000
8th Dec 20227:04 amBUSUpdated Corporate Presentation
23rd Nov 20227:25 amBUSPayment to GoldOz PL
17th Nov 20227:06 amBUSEncouraging Results from First Drill Hole of 2022 at Blue Moon, Victoria
19th Oct 20222:31 pmBUSBlock listing Interim Review
19th Oct 20227:04 amBUSRe-assay of Creswick Diamond Drill Core Reveals High Grade Results Including 0.7m @47.75 g/t Au
14th Oct 20221:11 pmBUSTwo Mineralisation Corridors Identified in Hole BH3DD032 at Bailieston, Victoria
11th Oct 20228:19 amBUSSecond ECR Drill Rig Update
4th Oct 20228:28 amBUSUpdate on Sampling at Lolworth, Queensland
14th Sep 20227:10 amBUSDrilling Commences at Blue Moon Prospect, Bailieston, Victoria
26th Aug 20222:00 pmBUSBendigo Property Sale Proceeds of A$950,000 Now Received
11th Aug 20227:03 amBUSPlanned Follow-up Drilling in early September at Blue Moon Prospect, Bailieston, Victoria
9th Aug 20227:02 amBUSTwo Mineralisation Corridors Identified from HR3 hole BH3DD032 at Bailieston, Victoria
29th Jul 20228:30 amBUSSale of Bendigo Property Raises A$950,000
11th Jul 20227:14 amBUSDrill Results from BH3DD035 Show Signs of Grade Continuity at Bailieston, Victoria
6th Jul 20227:01 amBUSInvestor Presentation and Strategic Update
30th Jun 20227:01 amBUSHalf-year Report
24th Jun 20223:22 pmBUSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.