Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

Share Price is delayed by 15 minutes
Get Live Data
0.245    0.00 (0.00%)
Bid:
0.23
Ask:
0.26
Spread: 0.03 (13.043%)
Market Cap: £8.68m
ECR Live PriceLast checked at - London Stock Exchange

Intraday ECR Minerals Share Chart

Copper Flat Project Update

21 Apr 2010 07:00

MERCATOR GOLD plc("Mercator Gold", "Mercator" or "the Company")

AIM: MCRUS OTC: MTGDY

Copper Flat Project Update

London 21 April 2010

Mercator Gold plc, the diversified mineral development company, is pleased to provide an update on the Copper Flat copper-gold-molybdenum-silver project ("Copper Flat") in New Mexico, USA, over which Mercator's wholly owned subsidiary New Mexico Copper Corporation ("NMCC") holds an exclusive option.

As announced on 16 March 2010, Mercator has entered into a binding heads of agreement for the sale of NMCC to THEMAC Resources Group Ltd ("THEMAC"), a company listed on the TSX Venture Exchange (ticker: MAC.H).

As a result of the sale of NMCC Mercator will acquire a substantial interest in THEMAC, and will therefore retain a very significant interest in the Copper Flat project's future development.

Highlights

- A complete set of assays has been received for the drilling programme concluded at Copper Flat on 8 February 2010, which totalled 5,041.5ft over seven drill holes.

- Highlights subsequent to the last drilling report by the Company include an intersection of 144.5ft (44.0m) at 0.46% copper, 0.024% molybdenum, 0.122 g/t gold and 4.7 g/t silver and an intersection of 1,200ft (365.8m) at 0.25% copper, 0.006% molybdenum, 0.112 g/t gold and 2.1 g/t silver.

- All historic mineralisation types were intersected during the programme and new areas for resource development were identified below and adjacent to the extent of the historic pit model.

- An independent reserve/resource update for the Copper Flat deposit is expected to be available in May 2010.

- A final report on the pulp re-assay programme that commenced in late 2009 is due in April. Results received to date confirm historic drill results.

Patrick Harford, Managing Director of Mercator, comments:

"NMCC's drilling programme at Copper Flat has fulfilled its key objectives, and we look forward to the completion of an independent reserve/resource update in May."

Drilling Objectives

The major objectives of the programme were to verify the historic reserves/resources of the deposit and to identify new areas for resource development adjacent to and below the extent of the historic pit model.

These potential new resources were noted by Pincock, Allen & Holt in their 1999 audit of the project, and it is anticipated that additional low grade and some high grade resources will be estimated in these areas in future.

Secondary objectives of the programme included providing updated geotechnical and environmental information, evaluating grade continuity between sections and identifying additional drill targets.

Two drill rigs were deployed and 5,041.5ft of core was produced from seven drill holes, totalling 525 samples. The samples were sent to Skyline Assayers & Laboratories of Tucson, Arizona, USA, a fully accredited analytical lab. Assays were performed for copper, molybdenum, silver and gold. Some 33 check samples have been sent to the ALS Chemex lab in Reno, Nevada, USA.

Standard procedures for core handling were in place during the programme, with core being logged into the core facility at every shift change. A geologist was on site for all sample preparation and shipping.

Full Assay Results

CF-09-01

Intersection

ft m Cu% Mo% Au (g/t) Ag (g/t)
entire hole 847.5 258.3 0.25 0.006 0.094 2.1
258-836.5ft 578.5 176.3 0.28 0.000
308-578.5ft 270.5 82.4 0.30 0.007 0.144 2.4
CF-10-02
Intersection ft m Cu% Mo% Au (g/t) Ag (g/t)
entire hole 141.5 43.1 0.35 0.002 0.13 3.4
CF-10-03
Intersection ft m Cu% Mo% Au (g/t) Ag (g/t)
entire hole 1041 317.3 0.52 0.002 0.13 3.9
16.5-753ft 736.5 224.5 0.61 0.002
0-848ft 848 258.5 0.15 4.5
125-840ft 715 217.9 0.030
16.5-445.5ft 428.5 130.6 0.73 0.023 6.0
CF-10-04
Intersection ft m Cu% Mo% Au (g/t) Ag (g/t)
entire hole 1014.5 309.2 0.21 0.007 0.078 2.1
0-266ft 266 81.1 0.04 0.009 0.133 4.2
CF-10-05
Intersection ft m Cu% Mo% Au (g/t) Ag (g/t)
entire hole 602.5 183.6 0.30 0.007 0.125 2.8
0-269ft 269 82.0 0.34 0.010 0.125 3.1
CF-10-06
Intersection ft m Cu% Mo% Au (g/t) Ag (g/t)
entire hole 1200 365.8 0.25 0.006 0.112 2.1
0-747ft 747 227.7 0.30 0.007 0.148 2.8
CF-10-06b
Intersection ft m Cu% Mo% Au (g/t) Ag (g/t)
entire hole 199.5 60.8 0.38 0.019 0.104 3.8
55-199.5ft 144.5 44.0 0.46 0.024 0.122 4.7

Pulp Re-Assay Programme

Around 10% of an approximate 14,000 sample pulps available from historic drilling carried out at Copper Flat by Quintana Minerals from 1974-1979 are being re-assayed, with a final report due in April. Results received to date confirm historic drill results.

About the Copper Flat Project

Copper Flat is a former producing mine with substantial infrastructure still in place. The Copper Flat deposit has historic reserves of 50.21 million short tons at an average grade of 0.45% Cu, 0.1244 g/t Au, 2.053 g/t Ag and 0.015% Mo, based on a cut-off grade of 0.23% Cu.

On the basis of current historic reserves and assuming metal prices of US$3/lb copper, US$10/lb molybdenum, US$900/oz gold and US$13/oz silver, the Copper Flat project is estimated to have an NPV of US$348 million and an IRR of 45%, assuming initial capital costs of US$115 million for the recommencement of production and a discount rate of 8% (figures sourced from a preliminary review of the project carried out by an independent consulting group in August 2009). The current price of copper is in excess of US$3/lb.

Corrections to Drilling Report of 18 February 2010

i) The entire-hole Cu grade of CF10-03 was initially reported as 0.44% over 1,041ft, but subsequent review of the data shows the Cu grade to be 0.52%.

ii) CF09-02 was drilled to 141.5ft rather than 126ft. The extra core has been located, logged, and assayed, and the assays have been entered into the database. The restated entire-hole grade of CF09-02 is 0.35% Cu, 0.002% Mo, 0.130 g/t Au, and 3.4g/t Ag.

iii) The entire-hole Ag grade of CF09-01 was initially reported as 2.34 g/t, but subsequent review of the data shows the Ag grade to be 2.10 g/t.

iv) Total drilling completed during the programme was 5,041.5ft, rather than 5,005ft as initially reported.

This announcement has been reviewed by John R. King and Mark I. Pfau, both registered geologists and Qualified Persons under Canadian NI43-101.

About Mercator

Mercator is a diversified mineral development company dedicated to creating value for its shareholders through a process of finding value, adding value and realising value. Mercator has an experienced management team with expertise in the structuring and execution of value accretive transactions.

For further information please contact:

Mercator Gold plc

Michael Silver, Chairman Tel: +44 (0) 20 7929 1010
Patrick Harford, Managing Director Tel: +1 646 239 9087

Email: info@mercatorgold.com

Website: www.mercatorgold.com

Daniel Stewart & Company plc

Oliver Rigby Tel: + 44 (0) 20 7776 6550

Old Park Lane Capital plc

Forbes Cutler Tel: +44 (0) 20 7518 2603

Bankside Consultants Ltd

Simon Rothschild/Oliver Winters Tel: +44 (0) 20 7367 8888

Barry Kaplan Associates

Larry Kaplan Tel: +1 732 747 0702

Copyright Business Wire 2010

Date   Source Headline
27th May 202111:19 amBUSStrategic Licence Applications Australia
13th May 20217:00 amBUSEXPLORATION UPDATE – VICTORIA GOLDFIELDS AUSTRALIA
20th Apr 20219:04 amBUSHigh-Grade Drilling Results – Bailieston Gold Project, Victoria Goldfields, Australia
19th Apr 202112:21 pmBUSResult of AGM
9th Apr 20214:40 pmRNSSecond Price Monitoring Extn
9th Apr 20214:35 pmRNSPrice Monitoring Extension
9th Apr 20217:11 amBUSPLACING OF SHARES, ACCELERATION AND EXPANSION OF DRILLING CAMPAIGN
23rd Mar 20215:18 pmBUSExercise of Options
23rd Mar 20211:20 pmBUSAnnual Financial Report
2nd Mar 20211:47 pmBUSNew Company Presentation – Victoria Goldfields, Australia
12th Feb 202112:09 pmBUSDrilling Update – Victoria Goldfields, Australia
11th Feb 20215:19 pmBUSBlock Listing Application
5th Feb 20214:52 pmBUSExercise of Options
28th Jan 20211:33 pmBUSTR-1: Standard form for notification of major holdings
25th Jan 202110:00 amBUSWarrant Exercise & Appointment of Joint Broker
12th Jan 20215:00 pmBUSExercise of Warrants
12th Jan 20219:00 amBUSExploration Update – Victoria Goldfields, Australia
11th Jan 20211:07 pmBUSTR-1: Standard form for notification of major holdings
5th Jan 202112:38 pmBUSExercise of Warrants & Options
29th Dec 20202:06 pmRNSSecond Price Monitoring Extn
29th Dec 20202:01 pmRNSPrice Monitoring Extension
29th Dec 202011:06 amRNSSecond Price Monitoring Extn
29th Dec 202011:01 amRNSPrice Monitoring Extension
23rd Dec 20203:35 pmBUSChange of Registered Office
23rd Dec 20202:45 pmBUSExercise of Warrants & Options
16th Dec 20206:07 pmBUSExercise of Warrants by Director
16th Dec 202012:30 pmBUSDirector Appointment
8th Dec 202011:00 amRNSPrice Monitoring Extension
30th Nov 20205:22 pmBUSBlock Listing Application
20th Nov 20207:00 amBUSVictoria Goldfields Operational Update
23rd Oct 20205:14 pmBUSIssue of Share Options
19th Oct 20204:42 pmRNSSecond Price Monitoring Extn
19th Oct 20204:36 pmRNSPrice Monitoring Extension
12th Oct 20205:00 pmBUSTR-1: Standard form for notification of major holdings
24th Sep 20207:00 amBUSTambo Gold Project, Eastern Victoria, Australia
14th Sep 202010:00 amBUSBusiness Operations Update
1st Sep 20204:41 pmRNSSecond Price Monitoring Extn
1st Sep 20204:36 pmRNSPrice Monitoring Extension
1st Sep 20202:05 pmRNSSecond Price Monitoring Extn
1st Sep 20202:00 pmRNSPrice Monitoring Extension
26th Aug 20202:05 pmRNSSecond Price Monitoring Extn
26th Aug 20202:00 pmRNSPrice Monitoring Extension
26th Aug 202011:05 amRNSSecond Price Monitoring Extn
26th Aug 202011:00 amRNSPrice Monitoring Extension
4th Aug 20205:08 pmBUSBlock Listing Application
3rd Aug 20205:00 pmBUSExercise of Warrants
31st Jul 20205:00 pmBUSTR-1: Standard form for notification of major holdings
27th Jul 20205:28 pmBUSExercise of Warrants
27th Jul 20202:05 pmRNSSecond Price Monitoring Extn
27th Jul 20202:00 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.