The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCaspian Sunrise Regulatory News (CASP)

Share Price Information for Caspian Sunrise (CASP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.60
Bid: 3.50
Ask: 3.70
Change: 0.00 (0.00%)
Spread: 0.20 (5.714%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 3.60
CASP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

13 Jan 2016 07:00

RNS Number : 6594L
Roxi Petroleum Plc
13 January 2016
 

Roxi Petroleum PLC

 

("Roxi" or the "Company")

 

Operational Update

 

Roxi, the Central Asian oil and gas company with a focus on Kazakhstan, is pleased to update the market with progress at its flagship asset BNG as follows:

 

Shallow Wells

 

Well 143

 

Well 143, which was the first of the shallow wells for 2013, was spudded on 1 April 2013, on the MJ-F structure located towards the North of South Yelemes field at BNG. The total depth of the well is 2,750 meters.

 

As previously reported two intervals at 2,693 meters and 1974 meters have already been tested with good oil shows encountered. Also previously reported was the high quality of oil recovered, which has an oil density of 39 degrees API (American Petroleum Institute).

 

Five additional intervals; between 2,410 and 2,413 meters; between 2,370 and 2373 meters: between 2,328 and 2,331 meters; between 2,219 and 2122 meters; and between 2,193 and 2,198 meters (in total 17 meters) have been perforated, all in the Jurassic.

 

The Company is pleased to report that Well 143 has flowed strongly since the New Year and continues to flow well.

 

The average daily flow rates (barrels of oil per day ('bopd')) using different choke sizes have been as follows:

 

3 mm choke 520 bopd.

5 mm choke 675 bopd.

7 mm choke 815 bopd.

 

Deep Wells

 

Deep Well 801

 

As previously reported Deep Well 801, which was drilled to a depth of 5,050 meters has suffered from blockages caused by excess drilling fluids.

 

Roxi is pleased to announce that, following a prolonged wash using less dense mud injected under pressure, intended to lessen the density of the drilling fluids and ease their recovery, the well has flowed intermittently over a period of 2 days.

 

The well has now been closed to allow the removal of drill-pipes. The well is next expected to be placed on test within the next few weeks. Roxi will provide an update once unimpeded flow rates have been determined following such testing.

 

Deep Well A5

 

As previously announced Deep Well A5 was drilled to a depth of 4,442 meters. Unrecovered drilling fluids have blocked the well during preparation for testing but for a brief period of up to two hours at a time the well flowed oil at the rate of 2,000 bopd before becoming blocked by the accumulation of unrecovered heavy drilling fluids becoming set in the oil pipe.

 

The next phase of cleaning up this well is expected to commence towards the end of January 2016 with the delivery of new coil tubing equipment to remove the excess drilling fluids previously reported. In the meantime the well is periodically opened to bleed off excess drilling fluids.

 

Deep Well A6

 

As previously announced Deep Well A6 was spudded in early November 2015 and is to be drilled to a planned total depth of 5,000 meters.

 

Drilling has reached a depth of 3,140 meters without incident and the well remains on target to reach total depth at the end of February 2016.

 

 

Comments:

 

Clive Carver, Chairman said

 

"We are naturally pleased with the significant improvement in flow rates at Well 143 following the perforation of the new intervals. As previously noted we have high hopes for this well and the structure on which it sits."

 

"We remain encouraged by the progress at the deeper wells and look forward to a time when we can update the market with uninterrupted flow rates.

 

Qualified Person

Mr. Nurlybek Ospanov, Roxi's senior geologist who is a member of the Society of Petroleum Engineers ("SPE"), has reviewed and approved the technical disclosures in this announcement.

 

 

Enquiries: 

 

Roxi Petroleum PLC

Clive Carver, Chairman +7 727 375 0202 

 

WH Ireland Ltd

James Joyce / James Bavister +44 (0) 207 220 1666 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBRGDBGSBBGLD
Date   Source Headline
17th Jul 200910:15 amRNSCorporate update
2nd Jul 20096:05 pmRNSHolding(s) in Company
2nd Jul 20096:00 pmRNSTotal Voting Rights
2nd Jul 20095:49 pmRNSDirector's Dealings
29th Jun 20097:00 amRNSFinal Results
25th Jun 200911:00 amRNSHolding(s) in Company
18th Jun 20092:30 pmRNSUS$5 million additional funding from Arawak
3rd Jun 20097:00 amRNSFunding & Operational Update
28th May 200912:30 pmRNSResult of General Meeting
19th May 20097:00 amRNSFunding and License Update
12th May 20098:46 amRNSOperational Update
14th Apr 20097:04 amRNSFunding and Operational Update
12th Feb 20099:00 amRNSFunding Update
9th Feb 20097:00 amRNSFunding and Operational Update
19th Jan 20097:00 amRNSFarm Out and Operational Update
22nd Dec 200811:00 amRNSResult of General Meeting
19th Dec 200810:30 amRNSDrilling success
4th Dec 20089:00 amRNSNotice of General Meeting
28th Nov 20083:01 pmRNSTotal Voting Rights
19th Nov 200811:30 amRNSFunding and Operations Update
13th Oct 20082:12 pmRNSHolding(s) in Company
8th Oct 20085:30 pmRNSHolding(s) in Company
29th Sep 20087:00 amRNSInterim Results
26th Sep 20087:00 amRNSFarm out update
2nd Sep 20082:35 pmRNSDirectorate Change
28th Aug 20087:00 amRNSFunding and Operational Updat
18th Jul 20081:00 pmRNSResult of AGM
18th Jul 20089:45 amRNSAGM Statement
24th Jun 20085:44 pmRNSPosting of Annual Report
17th Jun 20087:00 amRNSFinal Results
9th Jun 200810:40 amRNSHolding(s) in Company
28th May 20083:18 pmRNSHolding(s) in Company
19th May 20087:01 amRNSOperations Update
7th May 20087:18 amRNSExtension of Contract
4th Apr 20089:09 amRNSHolding(s) in Company
27th Mar 200810:14 amRNSHolding(s) in Company
19th Mar 20088:13 amRNSOperations Update
3rd Mar 20087:00 amRNSFirst day of Dealings
29th Feb 20081:55 pmRNSSch 1 Update-Roxi Petroleum
29th Feb 20081:45 pmRNSResult of EGM
29th Feb 20088:37 amRNSGeneral Meeting Presentation
27th Feb 20085:43 pmRNSHolding(s) in Company
25th Feb 20083:28 pmRNSHolding(s) in Company
22nd Feb 200812:09 pmRNSHolding(s) in Company
19th Feb 20084:33 pmRNSFMS & ADA Update
15th Feb 20081:01 pmRNSRecent Share Price Movement
13th Feb 20085:22 pmRNSHolding(s) in Company
13th Feb 20085:22 pmRNSHolding(s) in Company
13th Feb 20085:21 pmRNSHolding(s) in Company
13th Feb 20084:17 pmRNSSchedule 1 - Roxi Petroleum

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.