The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCaspian Sunrise Regulatory News (CASP)

Share Price Information for Caspian Sunrise (CASP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.45
Bid: 3.30
Ask: 3.60
Change: -0.20 (-5.48%)
Spread: 0.30 (9.091%)
Open: 3.65
High: 3.65
Low: 3.35
Prev. Close: 3.65
CASP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

13 Jan 2016 07:00

RNS Number : 6594L
Roxi Petroleum Plc
13 January 2016
 

Roxi Petroleum PLC

 

("Roxi" or the "Company")

 

Operational Update

 

Roxi, the Central Asian oil and gas company with a focus on Kazakhstan, is pleased to update the market with progress at its flagship asset BNG as follows:

 

Shallow Wells

 

Well 143

 

Well 143, which was the first of the shallow wells for 2013, was spudded on 1 April 2013, on the MJ-F structure located towards the North of South Yelemes field at BNG. The total depth of the well is 2,750 meters.

 

As previously reported two intervals at 2,693 meters and 1974 meters have already been tested with good oil shows encountered. Also previously reported was the high quality of oil recovered, which has an oil density of 39 degrees API (American Petroleum Institute).

 

Five additional intervals; between 2,410 and 2,413 meters; between 2,370 and 2373 meters: between 2,328 and 2,331 meters; between 2,219 and 2122 meters; and between 2,193 and 2,198 meters (in total 17 meters) have been perforated, all in the Jurassic.

 

The Company is pleased to report that Well 143 has flowed strongly since the New Year and continues to flow well.

 

The average daily flow rates (barrels of oil per day ('bopd')) using different choke sizes have been as follows:

 

3 mm choke 520 bopd.

5 mm choke 675 bopd.

7 mm choke 815 bopd.

 

Deep Wells

 

Deep Well 801

 

As previously reported Deep Well 801, which was drilled to a depth of 5,050 meters has suffered from blockages caused by excess drilling fluids.

 

Roxi is pleased to announce that, following a prolonged wash using less dense mud injected under pressure, intended to lessen the density of the drilling fluids and ease their recovery, the well has flowed intermittently over a period of 2 days.

 

The well has now been closed to allow the removal of drill-pipes. The well is next expected to be placed on test within the next few weeks. Roxi will provide an update once unimpeded flow rates have been determined following such testing.

 

Deep Well A5

 

As previously announced Deep Well A5 was drilled to a depth of 4,442 meters. Unrecovered drilling fluids have blocked the well during preparation for testing but for a brief period of up to two hours at a time the well flowed oil at the rate of 2,000 bopd before becoming blocked by the accumulation of unrecovered heavy drilling fluids becoming set in the oil pipe.

 

The next phase of cleaning up this well is expected to commence towards the end of January 2016 with the delivery of new coil tubing equipment to remove the excess drilling fluids previously reported. In the meantime the well is periodically opened to bleed off excess drilling fluids.

 

Deep Well A6

 

As previously announced Deep Well A6 was spudded in early November 2015 and is to be drilled to a planned total depth of 5,000 meters.

 

Drilling has reached a depth of 3,140 meters without incident and the well remains on target to reach total depth at the end of February 2016.

 

 

Comments:

 

Clive Carver, Chairman said

 

"We are naturally pleased with the significant improvement in flow rates at Well 143 following the perforation of the new intervals. As previously noted we have high hopes for this well and the structure on which it sits."

 

"We remain encouraged by the progress at the deeper wells and look forward to a time when we can update the market with uninterrupted flow rates.

 

Qualified Person

Mr. Nurlybek Ospanov, Roxi's senior geologist who is a member of the Society of Petroleum Engineers ("SPE"), has reviewed and approved the technical disclosures in this announcement.

 

 

Enquiries: 

 

Roxi Petroleum PLC

Clive Carver, Chairman +7 727 375 0202 

 

WH Ireland Ltd

James Joyce / James Bavister +44 (0) 207 220 1666 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBRGDBGSBBGLD
Date   Source Headline
28th May 201911:54 amRNSBNG Operational Update
24th May 20197:52 amRNSBNG operational update
24th May 20197:00 amRNSAnnual Report and Financial Statements
9th May 20197:05 amRNSOperational Update
15th Apr 20197:00 amRNSBNG operational update
13th Mar 20199:30 amRNSBNG operational update
25th Jan 20197:00 amRNSNon-Executive Director Appointment
22nd Jan 20197:00 amRNSOperational, 3A Best and Shareholding Update
17th Jan 20197:00 amRNSBNG operational update
17th Dec 201811:42 amRNSExercise of Options
13th Dec 20182:23 pmRNSDirector/PDMR Shareholding
28th Nov 201811:05 amRNSBNG Operational Update
13th Nov 20187:00 amRNS3A Best acquisition update
5th Nov 20187:00 amRNSBNG Operational Update
28th Sep 20187:00 amRNSInterim Results for the period ended 30 June 2018
1st Aug 20187:00 amRNSBNG Deep Well Operational Update
19th Jun 20183:58 pmRNSResult of AGM
29th May 20187:00 amRNSOperational Update & 3A Best Acquisition Update
14th May 20187:00 amRNSFinal Results
9th May 20187:00 amRNSOperational Update
19th Mar 201811:00 amRNSPrice Monitoring Extension
19th Mar 20187:00 amRNSOperational Update
12th Feb 20187:00 amRNSBNG Operational Update
1st Feb 20189:34 amRNSUpdated Corporate Presentation
31st Jan 20187:00 amRNSOperational & Corporate Update
23rd Jan 201812:03 pmRNSPDMR Notification
4th Jan 20187:00 amRNSOperational Update
14th Dec 20177:00 amRNSBNG Operational Update
27th Nov 20178:48 amRNSShareholding Update
27th Nov 20177:00 amRNSBNG Operational Update
21st Nov 20171:01 pmRNSUpdated Corporate Presentation
20th Nov 20177:00 amRNSBNG Operational Update
10th Nov 201711:31 amRNSCorrection: Shareholding Update
10th Nov 20177:00 amRNSShareholding Update
8th Nov 20177:00 amRNSInvestor Evening
27th Oct 20177:00 amRNSBNG Contract Area Early Licence Renewal
23rd Oct 20177:00 amRNSBNG Operational Update
2nd Oct 20177:00 amRNSOperational Update
20th Sep 20177:00 amRNSInterim Results
30th Aug 201711:32 amRNSShareholding Update
8th Aug 20177:00 amRNSBNG Operational Update
4th Aug 20174:12 pmRNSShareholding Update
3rd Jul 20177:00 amRNSOperational Update
13th Jun 20172:15 pmRNSResult of AGM
1st Jun 20179:27 amRNSNotification of Major Interest in Shares
1st Jun 20177:00 amRNSCompletion of the Baverstock Merger
26th May 20177:00 amRNSBaverstock Merger Completion
15th May 20177:00 amRNSFinal Results
12th May 20171:13 pmRNSFinal Approval Received for Baverstock Merger
10th May 201710:27 amRNSOperational Update - Spudding of Well 144

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.