Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCaspian Sunrise Regulatory News (CASP)

Share Price Information for Caspian Sunrise (CASP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.45
Bid: 3.30
Ask: 3.60
Change: -0.20 (-5.48%)
Spread: 0.30 (9.091%)
Open: 3.65
High: 3.65
Low: 3.35
Prev. Close: 3.65
CASP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

13 Jan 2016 07:00

RNS Number : 6594L
Roxi Petroleum Plc
13 January 2016
 

Roxi Petroleum PLC

 

("Roxi" or the "Company")

 

Operational Update

 

Roxi, the Central Asian oil and gas company with a focus on Kazakhstan, is pleased to update the market with progress at its flagship asset BNG as follows:

 

Shallow Wells

 

Well 143

 

Well 143, which was the first of the shallow wells for 2013, was spudded on 1 April 2013, on the MJ-F structure located towards the North of South Yelemes field at BNG. The total depth of the well is 2,750 meters.

 

As previously reported two intervals at 2,693 meters and 1974 meters have already been tested with good oil shows encountered. Also previously reported was the high quality of oil recovered, which has an oil density of 39 degrees API (American Petroleum Institute).

 

Five additional intervals; between 2,410 and 2,413 meters; between 2,370 and 2373 meters: between 2,328 and 2,331 meters; between 2,219 and 2122 meters; and between 2,193 and 2,198 meters (in total 17 meters) have been perforated, all in the Jurassic.

 

The Company is pleased to report that Well 143 has flowed strongly since the New Year and continues to flow well.

 

The average daily flow rates (barrels of oil per day ('bopd')) using different choke sizes have been as follows:

 

3 mm choke 520 bopd.

5 mm choke 675 bopd.

7 mm choke 815 bopd.

 

Deep Wells

 

Deep Well 801

 

As previously reported Deep Well 801, which was drilled to a depth of 5,050 meters has suffered from blockages caused by excess drilling fluids.

 

Roxi is pleased to announce that, following a prolonged wash using less dense mud injected under pressure, intended to lessen the density of the drilling fluids and ease their recovery, the well has flowed intermittently over a period of 2 days.

 

The well has now been closed to allow the removal of drill-pipes. The well is next expected to be placed on test within the next few weeks. Roxi will provide an update once unimpeded flow rates have been determined following such testing.

 

Deep Well A5

 

As previously announced Deep Well A5 was drilled to a depth of 4,442 meters. Unrecovered drilling fluids have blocked the well during preparation for testing but for a brief period of up to two hours at a time the well flowed oil at the rate of 2,000 bopd before becoming blocked by the accumulation of unrecovered heavy drilling fluids becoming set in the oil pipe.

 

The next phase of cleaning up this well is expected to commence towards the end of January 2016 with the delivery of new coil tubing equipment to remove the excess drilling fluids previously reported. In the meantime the well is periodically opened to bleed off excess drilling fluids.

 

Deep Well A6

 

As previously announced Deep Well A6 was spudded in early November 2015 and is to be drilled to a planned total depth of 5,000 meters.

 

Drilling has reached a depth of 3,140 meters without incident and the well remains on target to reach total depth at the end of February 2016.

 

 

Comments:

 

Clive Carver, Chairman said

 

"We are naturally pleased with the significant improvement in flow rates at Well 143 following the perforation of the new intervals. As previously noted we have high hopes for this well and the structure on which it sits."

 

"We remain encouraged by the progress at the deeper wells and look forward to a time when we can update the market with uninterrupted flow rates.

 

Qualified Person

Mr. Nurlybek Ospanov, Roxi's senior geologist who is a member of the Society of Petroleum Engineers ("SPE"), has reviewed and approved the technical disclosures in this announcement.

 

 

Enquiries: 

 

Roxi Petroleum PLC

Clive Carver, Chairman +7 727 375 0202 

 

WH Ireland Ltd

James Joyce / James Bavister +44 (0) 207 220 1666 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBRGDBGSBBGLD
Date   Source Headline
11th Apr 20127:00 amRNSOperational update
20th Mar 20127:00 amRNSBNG Farm-out
8th Mar 20127:00 amRNSOperational Update
8th Feb 201212:36 pmRNSOperational Update
23rd Jan 20127:01 amRNSNW Konys Commences Pilot Production
3rd Jan 20127:00 amRNSNW Konys Pilot Production Consent Update
22nd Dec 20111:25 pmRNSOil Well Spudding
19th Dec 20117:00 amRNSSpudding of BNG Well 136
15th Dec 201112:38 pmRNSREPLACEMENT - Award of options
15th Dec 20117:00 amRNSAward of options
7th Dec 20117:00 amRNSGas Flaring Consent Update
29th Nov 20117:01 amRNSNK-10 Well Spudded 28 November 2011
22nd Nov 20117:00 amRNSOperational Update
18th Nov 201110:01 amRNSDirector/PDMR Shareholding
9th Nov 20115:00 pmRNSHolding(s) in Company
2nd Nov 201112:51 pmRNSHolding(s) in Company
1st Nov 20117:00 amRNSOperational Update
31st Oct 20111:15 pmRNSDirector/PDMR Shareholding
20th Oct 20117:00 amRNSOperational Update
17th Oct 201111:28 amRNSDirector/PDMR Shareholding
29th Sep 20118:51 amRNSReplacement of New Debt Facility
29th Sep 20117:00 amRNSNew debt facility
26th Sep 20117:00 amRNSInterim Results
8th Sep 201112:09 pmRNSShare Price Movement
18th Jul 20117:00 amRNSOperational Update
27th Jun 201111:21 amRNSResult of AGM
27th Jun 20117:00 amRNSBNG Operational Update
6th Jun 20117:00 amRNSAppointment of Nominated Adviser and Broker
27th May 20117:00 amRNSAnnual Report and Accounts and Notice of AGM
20th May 20117:00 amRNSPreliminary Results
11th May 20117:00 amRNSCancellation of 35 per cent sale of the BNG Asset
3rd Mar 20117:00 amRNSCanamens BNG Funding Announcement
22nd Feb 20117:00 amRNSOperational and Business Update
14th Feb 201110:39 amRNSElemes 135 Well Results
28th Jan 20118:58 amRNSOperations Update
27th Jan 20117:00 amRNSOperational Update
13th Jan 20117:00 amRNSGrant of Options and Directors' Shareholdings
12th Jan 20117:00 amRNSOperational and Business Update
10th Jan 201111:59 amRNSNW Konys Pilot Production Consent Update
7th Jan 20118:50 amRNSYelemes 135 Well Spud
13th Dec 20101:03 pmRNSNK 20 Well Spud
1st Dec 20107:00 amRNSOperational and Business Update
15th Nov 20107:00 amRNSOperational Update
8th Nov 20107:00 amRNSChange of Registered Address & Company Secretary
12th Oct 201010:17 amRNSSale of Ravninnoe Oil LLP Interest
16th Sep 20107:00 amRNSBNG Operational Update
8th Sep 20107:00 amRNSNotice of Results
10th Aug 20109:00 amRNSOperational Update
3rd Aug 20107:00 amRNSGalaz update
14th Jul 20107:00 amRNSRavninnoe and BNG Operations update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.