Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCaspian Sunrise Regulatory News (CASP)

Share Price Information for Caspian Sunrise (CASP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.45
Bid: 3.30
Ask: 3.60
Change: -0.20 (-5.48%)
Spread: 0.30 (9.091%)
Open: 3.65
High: 3.65
Low: 3.35
Prev. Close: 3.65
CASP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

13 Jan 2016 07:00

RNS Number : 6594L
Roxi Petroleum Plc
13 January 2016
 

Roxi Petroleum PLC

 

("Roxi" or the "Company")

 

Operational Update

 

Roxi, the Central Asian oil and gas company with a focus on Kazakhstan, is pleased to update the market with progress at its flagship asset BNG as follows:

 

Shallow Wells

 

Well 143

 

Well 143, which was the first of the shallow wells for 2013, was spudded on 1 April 2013, on the MJ-F structure located towards the North of South Yelemes field at BNG. The total depth of the well is 2,750 meters.

 

As previously reported two intervals at 2,693 meters and 1974 meters have already been tested with good oil shows encountered. Also previously reported was the high quality of oil recovered, which has an oil density of 39 degrees API (American Petroleum Institute).

 

Five additional intervals; between 2,410 and 2,413 meters; between 2,370 and 2373 meters: between 2,328 and 2,331 meters; between 2,219 and 2122 meters; and between 2,193 and 2,198 meters (in total 17 meters) have been perforated, all in the Jurassic.

 

The Company is pleased to report that Well 143 has flowed strongly since the New Year and continues to flow well.

 

The average daily flow rates (barrels of oil per day ('bopd')) using different choke sizes have been as follows:

 

3 mm choke 520 bopd.

5 mm choke 675 bopd.

7 mm choke 815 bopd.

 

Deep Wells

 

Deep Well 801

 

As previously reported Deep Well 801, which was drilled to a depth of 5,050 meters has suffered from blockages caused by excess drilling fluids.

 

Roxi is pleased to announce that, following a prolonged wash using less dense mud injected under pressure, intended to lessen the density of the drilling fluids and ease their recovery, the well has flowed intermittently over a period of 2 days.

 

The well has now been closed to allow the removal of drill-pipes. The well is next expected to be placed on test within the next few weeks. Roxi will provide an update once unimpeded flow rates have been determined following such testing.

 

Deep Well A5

 

As previously announced Deep Well A5 was drilled to a depth of 4,442 meters. Unrecovered drilling fluids have blocked the well during preparation for testing but for a brief period of up to two hours at a time the well flowed oil at the rate of 2,000 bopd before becoming blocked by the accumulation of unrecovered heavy drilling fluids becoming set in the oil pipe.

 

The next phase of cleaning up this well is expected to commence towards the end of January 2016 with the delivery of new coil tubing equipment to remove the excess drilling fluids previously reported. In the meantime the well is periodically opened to bleed off excess drilling fluids.

 

Deep Well A6

 

As previously announced Deep Well A6 was spudded in early November 2015 and is to be drilled to a planned total depth of 5,000 meters.

 

Drilling has reached a depth of 3,140 meters without incident and the well remains on target to reach total depth at the end of February 2016.

 

 

Comments:

 

Clive Carver, Chairman said

 

"We are naturally pleased with the significant improvement in flow rates at Well 143 following the perforation of the new intervals. As previously noted we have high hopes for this well and the structure on which it sits."

 

"We remain encouraged by the progress at the deeper wells and look forward to a time when we can update the market with uninterrupted flow rates.

 

Qualified Person

Mr. Nurlybek Ospanov, Roxi's senior geologist who is a member of the Society of Petroleum Engineers ("SPE"), has reviewed and approved the technical disclosures in this announcement.

 

 

Enquiries: 

 

Roxi Petroleum PLC

Clive Carver, Chairman +7 727 375 0202 

 

WH Ireland Ltd

James Joyce / James Bavister +44 (0) 207 220 1666 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBRGDBGSBBGLD
Date   Source Headline
10th Mar 20147:00 amRNSDrawdown on facility
28th Feb 20147:01 amRNSGalaz Operational Update
29th Jan 20147:00 amRNSGalaz operational update
2nd Jan 201410:05 amRNSOperational and directorate update
14th Nov 20137:00 amRNSOperational Update
26th Sep 20137:00 amRNSInterim Results
21st Aug 20137:00 amRNSOperational Update
17th Jul 20137:00 amRNSLicence Renewal and Operational update
4th Jul 20137:00 amRNSIssue of Shares
4th Jul 20137:00 amRNSOperational Update
14th Jun 20137:00 amRNSOperational update
3rd Jun 20131:19 pmRNSOperational Update
22nd May 201312:01 pmRNSResults of AGM
20th May 20137:00 amRNSOperational Update
9th May 20137:00 amRNSOperational update
1st May 20139:58 amRNSAnnual Report and Accounts and Notice of AGM
30th Apr 20137:00 amRNSFinal Results
29th Apr 20137:00 amRNSChange of Company Secretary & Registered Office
22nd Apr 20137:00 amRNSOperational update
4th Apr 20137:00 amRNS$40 million equity investment update
3rd Apr 20137:00 amRNSOperational Update
26th Mar 201311:14 amRNSIssue of shares
8th Mar 20138:12 amRNSOperational Update
4th Mar 20137:00 amRNSOperational Update
28th Feb 20133:43 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
28th Feb 20133:33 pmRNSInterest in Shares
13th Feb 20132:31 pmRNSChange of Registered Office Address
11th Feb 20132:32 pmRNS$40 million equity investment update
15th Jan 20133:27 pmRNS$40 million equity investment
10th Jan 20132:21 pmRNSGalaz NK-12
8th Jan 20137:00 amRNS$40 million equity investment
5th Dec 20127:00 amRNSFirst Production From Munaily
4th Dec 20127:00 amRNSGalaz Spudding NK-12
21st Nov 201212:32 pmRNSUpdate on BNG/KNOC farm-out
31st Oct 20127:00 amRNSUpdate on BNG / KNOC farm-out
27th Sep 20127:00 amRNSInterim Results
13th Sep 20127:00 amRNSOilBarrel Presentation
4th Sep 20127:00 amRNSOperational update
15th Aug 20127:00 amRNSOperational update
18th Jul 20128:03 amRNSOperational Update
27th Jun 20127:00 amRNSOperational Update
21st Jun 20129:10 amRNSOperational Update
11th Jun 20125:10 pmRNSResults of General Meeting and AGM
1st Jun 20127:00 amRNSOperational Update
29th May 20127:00 amRNSOperational Update
23rd May 20127:00 amRNSOperational update
14th May 20127:00 amRNSAnnual Report and Accounts and Notice of AGM
14th May 20127:00 amRNSShareholder Circular and Notice of General Meeting
8th May 20127:00 amRNSPreliminary Results
26th Apr 20127:00 amRNSOperational Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.