The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Res Regulatory News (ARS)

Share Price Information for Asiamet Res (ARS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.525
Bid: 1.45
Ask: 1.60
Change: 0.00 (0.00%)
Spread: 0.15 (10.345%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 1.525
ARS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Positive Metallurgical Value Enhancement Work

22 Mar 2021 08:25

RNS Number : 0077T
Asiamet Resources Limited
22 March 2021
 

22 March 2021

 

Positive Results from Metallurgical Value Enhancement Work

 

Asiamet Resources Limited ("Asiamet" or the "Company") is pleased to report on the results from metallurgical test work undertaken as part of value enhancement initiatives for the BKM copper project located in Central Kalimantan, Indonesia. Results from the work completed to date are highly promising and indicate significant potential benefits from a concentrate tank leach process flowsheet verses heap leach processing as per the 2019 feasibility study.

 

Key highlights:

 

Use of a concentrate tank leach process has potential to:

 

· Increase total copper recoveries by up to 40% on a relative basis.

 

· Maintain copper production at full capacity of 25Ktpa for a full 8 years, exclusive of any further exploration and resource conversion.

 

· Further enhance current robust project economics via earlier copper production and significantly stronger life of mine cash flow.

 

· Produce a secondary pyrite concentrate for sale into the Indonesian laterite nickel industry.

 

One of the key value enhancement initiatives identified in the 2019 BKM Feasibility study was to further increase the value of the BKM copper project through improved metallurgical recovery and process/mine flowsheet optimisation coupled with a review of capital and operating costs. The 2019 feasibility study assumed a conventional heap leach and solvent extraction-electrowinning process(SX-EW) delivering ~172kt of copper from 303kt of contained copper in current Ore Reserves, resulting in a 51% recovery of total copper. The metallurgical value enhancement work has investigated the use of a concentrate-tank leaching option that increases overall total copper recoveries to greater than 70%, a relative improvement of approximately 40% over the 2019 feasibility study results.

 

The assessed tank leaching option involves a conventional crushing, grinding, and froth flotation of the BKM ore to produce a copper-pyrite concentrate. A fraction of the concentrate is fed through a small autoclave for conditioning, and then recombined with the bulk of the concentrate in an atmospheric tank leach process. The leached copper, after an appropriate solid-liquid separation process, is recovered via conventional SX-EW to produce LME Grade-A copper cathode. The assessed flowsheet is similar to that used in other highly successful copper tank leach operations such as Sepon in Laos. Other advantages of the concentrate tank leach process include:

 

· A significant reduction in residence time to achieve higher copper recoveries i.e. 48 hours processing cycle time compared to circa 300 days to recover approximately 80% of the soluble copper (50% of the total copper) from the heap leach as reported in the 2019 Feasibility Study.

 

· Increase in the number of years operating at full capacity of 25ktpa contributing to greater life of mine copper production.

· Extension of the life of mine from 9 to 11 years before conversion of existing Inferred Resources and the discovery of additional resources through exploration.

· A smaller project footprint resulting in reduced costs associated with earthworks and lower environmental impact.

· A processing plant suitable for future processing of sulphide resources already identified on the KSK Contract of Work, when they become better defined.

· The potential to recover a saleable pyrite concentrate for the Indonesian HPAL nickel market.

 

A detailed review of capital and operating costs is still required to fully ascertain the economic benefits of a concentrate tank leach process and this work, along with further detailed flowsheet design and associated mining studies, will be the subject of the next phase of work commencing immediately.

 

Initial desktop review of operating costs suggests a marginally higher cost base with the inclusion of grinding, flotation, tank leaching and tailings management, however the project team led by Andrew Neale are investigating ways to minimise these impacts through a number of initiatives around power supply and overall mining costs. Capital cost estimates for the tank leach option also requires detailed assessment. Initial analysis indicates that the cost of additional processing equipment and tailings can be largely offset by a reduction in capital costs associated with the extensive civil works required for the heap leach pad and associated treatment ponds. Environmental impacts associated with the concentrate tank leach option are also significantly reduced due to a smaller overall site footprint. The environmental and economic benefit of a smaller site footprint will be further quantified in the next phase of value enhancement work.

 

Tony Manini, Executive Chairman of Asiamet Resources commented

Asiamet is very pleased with the outcomes of the metallurgical value enhancement work completed to date. While we still have further work to do to refine the process flowsheet and fully assess the capital and operating costs, the opportunity to recover significantly more copper, faster from the same volume of material clearly has the potential to significantly improve the already strong project economics. Cashflows come earlier and faster, production is maintained at full capacity for longer and more copper is produced over the life of mine. These benefits together with a reduced environmental footprint would all serve to enhance the robustness of the project as we enter the final stages of permitting and commence the process of engaging debt and equity providers for project financing. We look forward to reporting further on this important piece of work as it continues simultaneous with project financing activities and additional drilling to further expand resources and mine life.

 

ON BEHALF OF THE BOARD OF DIRECTORS

Tony Manini, Executive Chairman

For further information, please contact:-Ends-

Tony ManiniExecutive Chairman, Asiamet Resources LimitedEmail: tony.manini@asiametresources.com

 

Investor Enquiries

Sasha Sethi

Telephone: +44 (0) 7891 677 441

Email: Sasha@flowcomms.com / info@asiametresources.com

Asiamet Resources Nominated AdviserRFC Ambrian Limited

Bhavesh Patel / Stephen Allen

Telephone: +44 (0)20 3440 6800

Email: Bhavesh.Patel@rfcambrian.com / Stephen.Allen@rfcambrian.com 

 

Optiva Securities LimitedChristian Dennis

Telephone: +44 20 3137 1903

Email: Christian.Dennis@optivasecurities.com

 

Blytheweigh Communications Limited

Tim Blythe/Megan Ray

Telephone: +44 (0)20 7138 3204

Email: Tim.Blythe@blytheweigh.com / Megan.Ray@blytheweigh.com

 

Follow us on twitter @AsiametTweets

 

FORWARD-LOOKING STATEMENT

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterised by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

 

This announcement contains inside information as stipulated under the Market Abuse Regulations (EU) no. 596/2014 ("MAR").

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDUUAWRAKUOURR
Date   Source Headline
10th Dec 20194:40 pmRNSSecond Price Monitoring Extn
10th Dec 20194:35 pmRNSPrice Monitoring Extension
10th Dec 20197:00 amRNSCompany Update
26th Nov 20197:00 amRNSKSK Exploration Update
13th Nov 201910:00 amRNSIssue of Shares to Consultant
12th Nov 20197:00 amRNSDirector Purchase of Shares
14th Oct 201911:50 amRNSManagement Update Call
10th Oct 201912:20 pmRNSExercise of Options
23rd Sep 201912:20 pmRNSDirector Purchase of Shares
19th Sep 201910:01 amRNSExercise of Options
19th Sep 20197:00 amRNSPublic infrastructure upgrades improve BKM project
13th Sep 20197:00 amRNS2019 Interim Financial Statements
21st Aug 20197:00 amRNSsigns MoU with China Nonferrous Metals
20th Aug 20197:20 amRNSSuccessful Placing of US$ 2.1 million
17th Jul 20197:00 amRNSReceives Environmental Approval for BKM Project
10th Jul 20197:05 amRNSDirector Appointment
1st Jul 20194:00 pmRNSIssue of Director Performance Rights
27th Jun 20197:00 amRNSNew Corporate Presentation
25th Jun 20191:30 pmRNSResults of AGM
14th Jun 20194:40 pmRNSSecond Price Monitoring Extn
14th Jun 20194:35 pmRNSPrice Monitoring Extension
14th Jun 20191:30 pmRNSIssue of Warrants
14th Jun 20197:00 amRNSFeasibility Study Confirms Robust Copper Project
14th Jun 20197:00 amRNSBKM Maiden Ore Reserve
14th Jun 20197:00 amRNSUpdates BKM Copper Resource
30th May 20194:30 pmRNSNotice of Annual General Meeting
28th May 20199:05 amRNSSecond Price Monitoring Extn
28th May 20199:00 amRNSPrice Monitoring Extension
28th May 20197:15 amRNS2018 Annual Report & Financial Statements
28th May 20197:14 amRNSPrivate Placement to Strategic Investor
29th Apr 20194:00 pmRNSExercise of Options
16th Apr 201911:45 amRNSExercise of Warrants
16th Apr 20197:00 amRNSStrong Copper Results from BKM Drilling
2nd Apr 20198:35 amRNSParticipates at Mines and Money Asia Conference
25th Mar 20197:06 amRNSUpdates Beutong Copper-Gold Resource
20th Mar 20197:00 amRNSBFS drilling results strengthen BKM Resource
11th Mar 201910:45 amRNSExercise of Options
7th Mar 20197:00 amRNSReceives Key Approvals for BKM Copper Project
19th Feb 20197:00 amRNSBKM Project - BFS Drilling Advances to Plan
13th Feb 20199:36 amRNSHolding in Company - JP Morgan Asset Management
25th Jan 20197:14 amRNSBFS Drilling Progressing To Schedule
2nd Jan 20195:45 pmRNSExercise of Broker Warrants
18th Dec 20188:13 amRNSBKM Copper Project BFS Update
29th Nov 20187:00 amRNSSuccessful Placing of approximately US$3.3 Million
28th Nov 20182:00 pmRNSProposed Placing to raise up to US$3.3 million
23rd Nov 20187:39 amRNSAsiamet Exhibition Details for Mines and Money
14th Nov 20187:00 amRNSAsiamet Initiates Additional BKM Feasibility Works
31st Oct 20183:48 pmPRNCorrection : Form 8.3 - Barrick Gold Corporation
31st Oct 20187:00 amPRNForm 8.3 - Barrick Gold Corporation
18th Oct 20181:40 pmRNSResponse to social media article

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.