Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 64.50
Bid: 63.00
Ask: 66.00
Change: 0.00 (0.00%)
Spread: 3.00 (4.762%)
Open: 64.50
High: 65.60
Low: 64.50
Prev. Close: 64.50
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on Gedabek Gold Project

19 Mar 2009 07:00

RNS Number : 1019P
Anglo Asian Mining PLC
19 March 2009
 



19 March 2009 AIM:AAZ

Anglo Asian Mining plc

Update on Gedabek Gold Project

Mine pre-stripping completed

First feed of the leach pad has commenced

Start up of ADR plant expected in the second half of April

First gold pour anticipated during May 2009

Further to the announcement of 26 JanuaryAnglo Asian Mining plc ("the Company") today provides an update on the construction of the Gedabek project in Azerbaijan.

Mine pre-stripping has been completed and the first touch down on the ore body has been achieved on the north side of the mine. Approximately 130,000 tonnes of ore, derived from historical workings at the site, are stockpiled at the plant. This represents 1.5 months of production.

 

The leach pad, barren leach solution (BLS) pond and pregnant leach solution (PLS) pond were completed by the end of January 2009The crusher has been installed and is now working effectively. 

The adsorption, desorption, refinery (ADR) and sulphidisation, acidification, recycling, and thickening (SART) building and covering were completed in mid February. The installation of the remaining equipment, piping and electronics for the ADR and SART plants is expected to be completed by the middle of April. 

The first feed to the leach pad commenced on 18 March and it is expected that the first cell of the leach pad will be irrigated during the first week of April, with the first gold pour anticipated during May 2009.

In order to accommodate the volume of ore to be leached over the projected mine life and to cater for any future extension, the Company and its consultant CQA have commenced studies for the expansion of the heap leach operations at Gedabek. Expansion of the current leach pad location is constrained by the potential for land slip in the area and the Company considers that its capacity will not be adequate for the ultimate life of mine. Investigations of other locations in the immediate vicinity of the mine are under way.

The Company is in advanced discussions with the International Bank of Azerbaijan concerning the arrangement of a working capital and letter of credit facility in addition to the existing $25 million loan facility currently in place. In anticipation of a successful conclusion to these discussions, on March 3, an interim loan of $500,000 was provided by Reza Vaziri, a director of the Company, in order to provide additional working capital. This loan was made on an interest free basis.

For further details, please contact: 

Anglo Asian Mining PLC

Reza Vaziri (acting CEO)

+994 12 499 3350

Numis Securities Limited

John Harrison, Nominated Adviser

+44 20 7260 1000

James Black, Corporate Broker

Parkgreen Communications

Louise Goodeve / Leah Kramer

+44 20 7993 8780

Notes to editors:

The ADR process involves gold being absorbed from the leach solution by ion exchange using resin. The gold is then desorbed from the resin into a solution from which the gold will be recovered by electro-winning. In order to remove the dissolved copper from the deleachant, the copper in the solution will be sulphidised using sodium sulphite and the cyanide in the solution will be recovered as sodium cyanide in the SART process. The resulting cemented copper will be thickened and filtered into saleable material. 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGUUUWWUPBGRR
Date   Source Headline
31st Oct 20186:30 pmRNSTotal Voting Rights
23rd Oct 20187:00 amRNSPayment of interim dividend - sterling amount
11th Oct 20187:00 amRNSQ3 2018 Production and Operations Review
8th Oct 20187:00 amRNSExercise of Share Options and Issue of Equity
19th Sep 20187:00 amRNSInterim Results and Maiden Dividend
18th Sep 20187:00 amRNSGedabek Open Pit - JORC Resources and Reserves
17th Sep 20187:00 amRNSH1 Geological Exploration Activities and Results
13th Sep 20187:00 amRNSAirborne Geophysical Survey at Gedabek
5th Sep 20189:30 amRNSCorporate Presentation and Net Cash
3rd Sep 201811:30 amRNSTechnical Presentation and Paper
29th Aug 20188:30 amRNSApproval of Capital Reduction by the Court
31st Jul 20187:00 amRNSTotal Voting Rights
30th Jul 201811:30 amRNSResult of General Meeting
19th Jul 20185:09 pmRNSExercise of Share Options and Issue of Equity
17th Jul 20187:00 amRNSQ2 & H1 2018 Production and Operations Review
13th Jul 201810:00 amRNSPosting of Circular and Notice of General Meeting
5th Jul 201811:00 amRNSPDMR Exercise of Share Options and Issue of Equity
29th Jun 20184:15 pmRNSResult of AGM
29th Jun 20187:00 amRNSAGM Statement
7th Jun 20189:30 amRNSNotice of General Meeting
24th May 20187:00 amRNSFinal Results
3rd May 201811:16 amRNSNew Corporate Presentation
16th Apr 20187:25 amRNSQ1 2018 Production and Operations Review
3rd Apr 201812:00 pmRNSRepayment of Director Loan
26th Mar 20189:00 amRNS2017 Exploration Activities & Results
13th Mar 20187:00 amRNSLaunch of 2018 Exploration Programme
12th Feb 20187:00 amRNS$15 million Syndicated 2-year 7% Loan Facility
6th Feb 201812:30 pmRNSUpdated Corporate Presentation
6th Feb 20187:00 amRNSFY2018 Production Guidance of 78,000 - 84,000 GEOs
16th Jan 20184:40 pmRNSSecond Price Monitoring Extn
16th Jan 20184:35 pmRNSPrice Monitoring Extension
16th Jan 20187:00 amRNSQ4 & FY 2017 Production and Operations Review
10th Jan 20184:40 pmRNSSecond Price Monitoring Extn
10th Jan 20184:35 pmRNSPrice Monitoring Extension
10th Jan 20182:05 pmRNSSecond Price Monitoring Extn
10th Jan 20182:00 pmRNSPrice Monitoring Extension
10th Jan 20181:13 pmRNSUpdate re Director Loan
26th Oct 20177:00 amRNSExploration and Development Activity Update
19th Oct 201710:15 amRNSBritish Ambassador to Azerbaijan visits Gedabek
13th Oct 20177:00 amRNSQ3 2017 Production Update
2nd Oct 20177:00 amRNSCompletion of Ugur JORC Resource
21st Sep 20177:00 amRNSInterim Results
13th Sep 20178:00 amRNSCommencement of Production from Ugur Open Pit Mine
11th Sep 20179:47 amRNSPresentation at Conference of Metallurgists
14th Aug 20177:00 amRNSUgur Gold Deposit - JORC Resource and Reserves
31st Jul 20178:30 amRNSTotal Voting Rights
27th Jul 20174:30 pmRNSDirector Dealing
27th Jul 20177:00 amRNSIssue of Equity and Director Shareholding
24th Jul 201710:33 amRNSUgur Gold Deposit Development & Gedabek Update
17th Jul 20177:00 amRNSQ2 and H1 2017 Production and Operations Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.