The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 64.50
Bid: 63.00
Ask: 66.00
Change: 0.50 (0.78%)
Spread: 3.00 (4.762%)
Open: 64.00
High: 65.00
Low: 64.00
Prev. Close: 64.00
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on Gedabek Gold Project

19 Mar 2009 07:00

RNS Number : 1019P
Anglo Asian Mining PLC
19 March 2009
 



19 March 2009 AIM:AAZ

Anglo Asian Mining plc

Update on Gedabek Gold Project

Mine pre-stripping completed

First feed of the leach pad has commenced

Start up of ADR plant expected in the second half of April

First gold pour anticipated during May 2009

Further to the announcement of 26 JanuaryAnglo Asian Mining plc ("the Company") today provides an update on the construction of the Gedabek project in Azerbaijan.

Mine pre-stripping has been completed and the first touch down on the ore body has been achieved on the north side of the mine. Approximately 130,000 tonnes of ore, derived from historical workings at the site, are stockpiled at the plant. This represents 1.5 months of production.

 

The leach pad, barren leach solution (BLS) pond and pregnant leach solution (PLS) pond were completed by the end of January 2009The crusher has been installed and is now working effectively. 

The adsorption, desorption, refinery (ADR) and sulphidisation, acidification, recycling, and thickening (SART) building and covering were completed in mid February. The installation of the remaining equipment, piping and electronics for the ADR and SART plants is expected to be completed by the middle of April. 

The first feed to the leach pad commenced on 18 March and it is expected that the first cell of the leach pad will be irrigated during the first week of April, with the first gold pour anticipated during May 2009.

In order to accommodate the volume of ore to be leached over the projected mine life and to cater for any future extension, the Company and its consultant CQA have commenced studies for the expansion of the heap leach operations at Gedabek. Expansion of the current leach pad location is constrained by the potential for land slip in the area and the Company considers that its capacity will not be adequate for the ultimate life of mine. Investigations of other locations in the immediate vicinity of the mine are under way.

The Company is in advanced discussions with the International Bank of Azerbaijan concerning the arrangement of a working capital and letter of credit facility in addition to the existing $25 million loan facility currently in place. In anticipation of a successful conclusion to these discussions, on March 3, an interim loan of $500,000 was provided by Reza Vaziri, a director of the Company, in order to provide additional working capital. This loan was made on an interest free basis.

For further details, please contact: 

Anglo Asian Mining PLC

Reza Vaziri (acting CEO)

+994 12 499 3350

Numis Securities Limited

John Harrison, Nominated Adviser

+44 20 7260 1000

James Black, Corporate Broker

Parkgreen Communications

Louise Goodeve / Leah Kramer

+44 20 7993 8780

Notes to editors:

The ADR process involves gold being absorbed from the leach solution by ion exchange using resin. The gold is then desorbed from the resin into a solution from which the gold will be recovered by electro-winning. In order to remove the dissolved copper from the deleachant, the copper in the solution will be sulphidised using sodium sulphite and the cyanide in the solution will be recovered as sodium cyanide in the SART process. The resulting cemented copper will be thickened and filtered into saleable material. 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGUUUWWUPBGRR
Date   Source Headline
24th Aug 20217:00 amRNSH1 2021 Geological Exploration Activities
16th Aug 20217:00 amRNSZafar Maiden JORC Mineral Resource Completed
14th Jul 20217:00 amRNSQ2 & H1 2021 Production and Operations review
12th Jul 20212:25 pmRNSPayment of 2020 Final Dividend
29th Jun 202112:15 pmRNSResults of 2021 Annual General Meeting
29th Jun 20217:00 amRNSAGM 2021 - Responses to Submitted Questions
29th Jun 20217:00 amRNSAGM 2021 - Letter from CEO to Company Shareholders
2nd Jun 20219:40 amRNSPosting of the Annual Report for 2021
20th May 20217:00 amRNS2020 Full year results
21st Apr 20217:00 amRNS5-year Extension to Gedabek Contract Area Approved
15th Apr 20217:00 amRNSQ1 2021 Production and Operations Review
1st Mar 20217:00 amRNSH2 2020 Geological Exploration Activities
25th Feb 20214:00 pmRNSTransaction with Conroy Gold
22nd Feb 20212:33 pmRNSPayment of 2020 Special Dividend
16th Feb 20213:40 pmEQSHardman & Co Research: February 2021 Investor Forum company research: Anglo Asian Mining
29th Jan 202110:30 amEQSHardman & Co Research: Anglo Asian Mining presenting at the February 2021 Hardman & Co Investor Forum
28th Jan 20217:00 amRNSUpdated Corporate Presentation
26th Jan 20217:00 amRNSPayment of Special Dividend
21st Jan 20217:00 amRNSUpdate on the Company’s Restored Contract Areas
19th Jan 20217:00 amRNSNew Copper and Gold Discovery at Gedabek
14th Jan 20217:00 amRNSQ4 and Full Year 2020 Production and Operations
18th Dec 20207:00 amRNSAppointment of Non-Executive Director
27th Nov 20202:00 pmRNSPrice Monitoring Extension
24th Nov 20207:00 amRNSUpdated Guidance for Turnover and Production
2nd Nov 20207:00 amRNSRevised JORC Mineral Resources & Reserves
27th Oct 20207:00 amRNSUpdate on the Company’s Vejnaly Contract Area
20th Oct 202010:52 amRNSPayment of 2020 interim dividend
14th Oct 20207:00 amRNSQ3 2020 Production and Operations Review
9th Oct 20209:07 amRNSChange of registered office
5th Oct 20202:05 pmRNSSecond Price Monitoring Extn
5th Oct 20202:00 pmRNSPrice Monitoring Extension
1st Oct 20207:00 amRNSUpdated Corporate Presentation
28th Sep 202012:45 pmRNSStatement on Situation in Azerbaijan
23rd Sep 20207:00 amRNSInterim Results for the six-months to 30 June 2020
10th Sep 20202:08 pmRNSResignation of Richard Round as Non-Exec. Director
6th Aug 20207:00 amRNSH1 2020 Geological Exploration Activities
21st Jul 20207:00 amRNSFormation of a Joint Venture
15th Jul 20207:00 amRNSQ2 & H1 2020 Production and Operations Review
14th Jul 202011:19 amRNSPayment of 2019 final dividend – sterling amount
2nd Jul 20207:30 amEQSHardman & Co Research: Q&A with Paul Mylchreest on Anglo Asian Mining (AAZ)
29th Jun 20207:00 amRNSAnnual General Meeting - responses to questions
23rd Jun 20205:01 pmRNSResults of Annual General Meeting
23rd Jun 20207:00 amRNSAGM 2020 – Letter from CEO to Company Shareholders
9th Jun 202010:15 amEQSHardman & Co Research: Anglo Asian Mining (AAZ): Small-cap gold miner with bigger-cap prospects
1st Jun 20203:04 pmRNSPosting of the 2020 Annual Report & Notice of AGM
21st May 20207:00 amRNSStrategic Update
13th May 20207:00 amRNS2019 Full year results
15th Apr 20207:00 amRNSQ1 2020 Production and Operations review
14th Apr 20204:41 pmRNSSecond Price Monitoring Extn
14th Apr 20204:36 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.