The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 64.50
Bid: 63.00
Ask: 66.00
Change: 0.50 (0.78%)
Spread: 3.00 (4.762%)
Open: 64.00
High: 65.00
Low: 64.00
Prev. Close: 64.00
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on Gedabek Gold Project

19 Mar 2009 07:00

RNS Number : 1019P
Anglo Asian Mining PLC
19 March 2009
 



19 March 2009 AIM:AAZ

Anglo Asian Mining plc

Update on Gedabek Gold Project

Mine pre-stripping completed

First feed of the leach pad has commenced

Start up of ADR plant expected in the second half of April

First gold pour anticipated during May 2009

Further to the announcement of 26 JanuaryAnglo Asian Mining plc ("the Company") today provides an update on the construction of the Gedabek project in Azerbaijan.

Mine pre-stripping has been completed and the first touch down on the ore body has been achieved on the north side of the mine. Approximately 130,000 tonnes of ore, derived from historical workings at the site, are stockpiled at the plant. This represents 1.5 months of production.

 

The leach pad, barren leach solution (BLS) pond and pregnant leach solution (PLS) pond were completed by the end of January 2009The crusher has been installed and is now working effectively. 

The adsorption, desorption, refinery (ADR) and sulphidisation, acidification, recycling, and thickening (SART) building and covering were completed in mid February. The installation of the remaining equipment, piping and electronics for the ADR and SART plants is expected to be completed by the middle of April. 

The first feed to the leach pad commenced on 18 March and it is expected that the first cell of the leach pad will be irrigated during the first week of April, with the first gold pour anticipated during May 2009.

In order to accommodate the volume of ore to be leached over the projected mine life and to cater for any future extension, the Company and its consultant CQA have commenced studies for the expansion of the heap leach operations at Gedabek. Expansion of the current leach pad location is constrained by the potential for land slip in the area and the Company considers that its capacity will not be adequate for the ultimate life of mine. Investigations of other locations in the immediate vicinity of the mine are under way.

The Company is in advanced discussions with the International Bank of Azerbaijan concerning the arrangement of a working capital and letter of credit facility in addition to the existing $25 million loan facility currently in place. In anticipation of a successful conclusion to these discussions, on March 3, an interim loan of $500,000 was provided by Reza Vaziri, a director of the Company, in order to provide additional working capital. This loan was made on an interest free basis.

For further details, please contact: 

Anglo Asian Mining PLC

Reza Vaziri (acting CEO)

+994 12 499 3350

Numis Securities Limited

John Harrison, Nominated Adviser

+44 20 7260 1000

James Black, Corporate Broker

Parkgreen Communications

Louise Goodeve / Leah Kramer

+44 20 7993 8780

Notes to editors:

The ADR process involves gold being absorbed from the leach solution by ion exchange using resin. The gold is then desorbed from the resin into a solution from which the gold will be recovered by electro-winning. In order to remove the dissolved copper from the deleachant, the copper in the solution will be sulphidised using sodium sulphite and the cyanide in the solution will be recovered as sodium cyanide in the SART process. The resulting cemented copper will be thickened and filtered into saleable material. 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGUUUWWUPBGRR
Date   Source Headline
7th Apr 20207:00 amRNSFurther Gold Doré Shipment & Operations Continue
26th Mar 20207:00 amRNSOperational Update
24th Mar 20209:05 amRNSSecond Price Monitoring Extn
24th Mar 20209:00 amRNSPrice Monitoring Extension
18th Mar 20204:41 pmRNSSecond Price Monitoring Extn
18th Mar 20204:36 pmRNSPrice Monitoring Extension
16th Mar 20202:06 pmRNSSecond Price Monitoring Extn
16th Mar 20202:00 pmRNSPrice Monitoring Extension
11th Mar 20207:00 amRNSRevenue and Production Guidance for Full Year 2020
6th Mar 202011:05 amRNSSecond Price Monitoring Extn
6th Mar 202011:00 amRNSPrice Monitoring Extension
28th Feb 202011:00 amRNSPrice Monitoring Extension
24th Feb 20207:00 amRNSQ4 2019 Geological Exploration Activities
24th Feb 20207:00 amRNSOverall Progress of Exploration Programme
12th Feb 20207:00 amRNSAnglo Asian reaches debt free milestone
14th Jan 20207:00 amRNSQ4 & Full Year 2019 Production & Operations Review
4th Nov 20197:00 amRNSQ3 2019 Geological Exploration Activities
4th Nov 20197:00 amRNSGold/ Copper & Gold Mineral Occurrences discovered
15th Oct 20197:00 amRNSPayment of 2019 Interim Dividend
15th Oct 20197:00 amRNSQ3 2019 Production and Operations review
1st Oct 20197:00 amRNSBritish Ambassador to Azerbaijan visits Gedabek
18th Sep 20197:00 amRNSInterim Results for the six-months to 30 June 2019
22nd Aug 20197:00 amRNSStatement re Media Comment
8th Aug 20199:00 amRNSH1 2019 Geological Exploration Activities
15th Jul 20197:00 amRNSQ2 & H1 2019 Production and Operations Review
9th Jul 20197:00 amRNSPayment of 2018 final dividend - sterling amount
20th Jun 20196:00 pmRNSResult of AGM
20th Jun 20197:00 amRNSAGM Statement
19th Jun 20192:01 pmRNSResearch Report published by Hardman & Co
19th Jun 20191:01 pmEQSHardman & Co Research: Anglo Asian Mining (AAZ): Prodigious cashflow AND bigger 'system' potential
19th Jun 20197:00 amRNSAerial ZTEM and Aeromagnetic Survey Update
18th Jun 20198:00 amRNSUpdated Exploration and JORC Reports
28th May 201910:25 amRNSNotice of AGM
16th May 20197:00 amRNSFull year results 2018 - pre-tax profit of $25.2m
2nd May 20197:00 amRNSNew Corporate Presentation
29th Apr 20197:00 amRNSExploration Update: Gedabek and Gosha
29th Apr 20197:00 amRNSResults of Helicopter-borne Geophysics Survey
10th Apr 20197:00 amRNSQ1 2019 Production and Operations Review
8th Apr 20197:00 amRNSUpdate on the Ordubad Polymetalic Contract Area
29th Mar 20192:18 pmRNSAirborne Geophysical Survey Update
20th Mar 201912:50 pmEQSHardman & Co Research: Anglo Asian Mining (AAZ): Prodigious cash generation and FCF yield
14th Mar 20197:01 amRNSJORC Mineral Resources and Reserves - Gedabek
14th Mar 20197:00 amRNSMaiden JORC Resources and Ore Reserves for Gadir
25th Feb 20197:00 amRNSDividend Guidance & Gadir Resource Estimate
7th Feb 20197:00 amRNS2019 Production Guidance
15th Jan 20197:00 amRNSQ4 and FY 2018 Production and Operations Review
27th Nov 20189:00 amRNSPDMR Dealing
21st Nov 20187:00 amRNSAirborne Geophysical Survey Across Gedabek
1st Nov 20182:00 pmRNSPrice Monitoring Extension
31st Oct 20186:30 pmRNSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.