Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 61.50
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 3.00 (5.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 61.50
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Significant Oxide Zone Drilled at Ugur Deposit

16 Dec 2016 07:00

RNS Number : 9991R
Anglo Asian Mining PLC
16 December 2016
 

Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

 

16 December 2016

Anglo Asian Mining plc

Significant oxide zone drilled at newly discovered Ugur deposit

 

Anglo Asian Mining plc ("Anglo Asian" or "the Company"), the AIM listed gold, copper and silver producer focused in Azerbaijan, is pleased to announce an exploration update for its new gold discovery, "Ugur", within its Gedabek licence area in western Azerbaijan ("Gedabek Licence").

 

Highlights

 

· Phase II drilling programme commenced in October 2016 to expand the potential resource at the Gedabek Licence - provides significant potential upside to the Company's future gold production

· Additional 35 reverse circulation drill holes completed since previous update - 1,842 metres of reverse circulation drilling now completed

· Core drilling commenced with six drill holes completed totalling 1,221 metres

· Initial Phase II core drilling programme has now confirmed an oxide zone to depth of about 60 metres

· Core drilling on-going based on a 40-metre grid system to allow for resource and reserve estimation

· Detailed geological structural and alteration mapping has started and an additional 240 metres of trenching completed

· Significant upside potential from results of alteration mapping - core drilling of flanks of main zone planned

 

Anglo Asian CEO, Reza Vaziri, said "These encouraging results from the newly discovered Ugur deposit enhance our understanding of the deposit and show that the oxide zone extends deeper than initially determined by previous drilling. Ugur is only three kilometres from our processing facilities at our main Gedabek site, highlighting the clear strategic value of developing this deposit. Work will continue to expand the potential resource of this new discovery. I look forward to updating shareholders on our progress as we work towards further enhancing our already profitable operation at Gedabek through the mining of multiple zones of mineralisation."

 

Anglo Asian Group Director of Geology, Stephen Westhead, said "With core drilling results having determined a significant oxide zone containing gold, it is planned to continue core drilling on a grid in the central area to allow for three-dimensional modelling for resource and reserve estimation of this exciting prospect. In conjunction with this, we will also drill the flanks of the area targeted by surface alteration mapping to expand the gold potential. We look forward to continuing to evaluate this deposit with a view to adding gold reserves in advance of mining as we aim to enhance our entire production profile for the Gedabek Licence."

 

Background

 

Anglo Asian's in-house exploration group has defined a new mineral occurrence named "Ugur" (meaning "good luck" or "success" in the Azeri language) located three kilometres north-west from its agitation leaching plant and heap leach facilities at its Gedabek Licence. This was defined as part of the on-going exploration programme to assess alteration zones and geological structures along strike from its Gedabek mine. As previously reported, this programme is designed to expand the Gedabek gold and copper resource.

 

The Ugur deposit area was defined from geological mapping. An alteration zone extends over an area of 1,000 metres (east-north-east by west-south-west) by 500 metres (north-west by south-east).

 

Detailed drill hole results

 

A total of 55 vertical reverse circulation ("RC") drill holes totalling 1,842 metres and six core drill holes totalling 1,221 metres have now been drilled at Ugur from which assay results have been subsequently obtained. The area covered by RC drilling is 600 metres (east-north-east) by 200 metres (north-north-west) within the alteration area, while a central mineralised zone of 225 metres (east-north-east) by 130 metres (north-north-west) has been defined with six core drill holes completed in this area.

 

The Company reported the significant results of RC drilling from the first twenty RC drill holes in its release of 17 October 2016. Subsequent to that release, a further 35 RC drill holes have been completed. Six of the RC drill holes contained significant mineralisation above the cut-off grade of 0.3 grammes per tonne.

 

The results of the six RC drill holes which contained significant mineralisation and the core drill holes one to six are set out in the tables below. These intersections (above 0.3 grammes per tonne) are all located in the oxide zone commencing from surface (unless otherwise stated). The assays returned no significant results for copper.

 

 

Additional Reverse Circulation drill holes since 17 October 2016 release (drill holes 21 to 55)*

 

 

Depth of drill hole

Grade

 

From

To

Total interval

Gold

Silver

Drill-hole

(metres)

(metres)

(metres)

(g/t)

(g/t)

UGRC21

0.0

8.0

8.0

0.20

1.38

UGRC24

5.0

23.0

18.0

0.19

1.19

UGRC24

23.0

27.0

4.0

0.34

0.75

UGRC24

27.0

34.0

7.0

0.16

0.75

UGRC25

1.0

4.0

3.0

0.34

1.54

UGRC25

4.0

12.0

8.0

0.18

0.86

UGRC25

12.0

19.0

7.0

0.41

1.51

UGRC25A

12.0

14.0

2.0

0.36

0.86

UGRC25A

14.0

19.0

5.0

0.12

0.91

UGRC25A

19.0

24.0

5.0

0.30

1.26

UGRC28

1.0

4.0

3.0

0.31

2.69

UGRC29

2.0

3.0

1.0

1.14

1.76

UGRC40

3.0

9.0

6.0

0.32

2.64

* The above results are for only those 6 drill holes which showed mineralisation above the cut-off grade of 0.3 grammes per tonne.

 

Core drill holes (drill holes 1 to 6)

 

 

Depth of drill hole

Grade

 

From

To

Total interval

Gold

Silver

Drill-hole

(metres)

(metres)

(metres)

(g/t)

(g/t)

UGDD1

4.0

63.2

59.2

2.02

6.03

UGDD1

63.2

76.2

13.0

0.20

1.80

 

 

 

 

 

 

UGDD2

3.0

64.5

61.5

3.36

12.13

Including:

 

 

 

 

 

UGDD2

3.0

17.0

14.0

8.00

17.09

UGDD2

17.0

35.4

18.4

1.32

16.62

UGDD2

35.4

46.0

10.6

4.26

7.88

UGDD2

46.0

64.5

18.5

1.46

4.43

 

 

 

 

 

 

UGDD3

0.0

35.0

35.0

1.08

10.05

 

 

 

 

 

 

UGDD4

8.0

51.5

43.5

1.82

4.94

Including:

 

 

 

 

 

UGDD4

24.0

28.7

4.7

9.07

12.90

 

 

 

 

 

 

UGDD5

0.0

28.0

28.0

0.25

1.64

UGDD6

18.0

59.6

41.6

0.49

1.06

UGDD6

73.4

87.3

13.9

0.79

1.17

 

 

Summary and future evaluation

 

These drill results continue to expand the resource potential at the Gedabek Licence and the Company is encouraged by the positive findings at the Ugur deposit. The area has only partially been drilled and initial field mapping has provided further drill targets. The Phase II core drilling programme designed on a grid for resource estimation will continue over the winter.

 

Installation of six primary topographic base stations that tie into the Gedabek mine grid system to allow for determining the coordinate of the drill collar locations have been completed. A topographical survey of the area is planned which is required for exploration planning, resource estimation and reserve calculation.

 

The 29 RC drill holes, completed since the last release and not reported above, had results to a depth of 34 metres which were either barren or only showed mineralisation below the 0.3 grammes per tonne cut-off grade. They were located in an area of about 250 metres by 70 metres extending west-south-west from the main central mineralised zone. It is planned to test this area by core drilling to deeper levels to ascertain its mineralisation.

 

All RC drilling at Ugur was carried out utilising only one drill bit, indicating the oxide material is comparatively soft and is not abrasive. This suggests that the material would require minimal blasting for extraction, and comminution productivity should be high. Preliminary bottle roll test work results yielded an average recovery of gold of 87 per cent. with low cyanide consumption. The full metallurgical properties of the deposit will be assessed in due course.

 

Competent Person Statement

 

The information in the announcement that relates to exploration results is based on information compiled by Dr Stephen Westhead, Director of Geology at Anglo Asian, who is a Fellow of The Geological Society of London, a Chartered Geologist and a Member of The Institute of Materials, Minerals and Mining.

 

Stephen Westhead has sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity, which he is undertaking, to qualify as a qualified person as defined by the AIM Rules for Companies. Stephen Westhead has reviewed the exploration results included in this announcement.

 

 

**ENDS**

 

For further information please visit www.angloasianmining.com or contact:

 

Reza Vaziri

Anglo Asian Mining plc

Tel: +994 12 596 3350

Bill Morgan

Anglo Asian Mining plc

Tel: +994 502 910 400

Stephen Westhead

Anglo Asian Mining plc

Tel: +994 502 916 894

Ewan Leggat

SP Angel Corporate Finance LLP

Nominated Adviser and Broker

Tel: +44 (0) 20 3470 0470

Laura Harrison

SP Angel Corporate Finance LLP

Tel + 44 (0) 20 3470 0470

Lottie Brocklehurst

St Brides Partners Ltd

Tel: +44 (0) 20 7236 1177

Susie Geliher

St Brides Partners Ltd

Tel: +44 (0) 20 7236 1177

 

Notes:

Anglo Asian Mining plc (AIM:AAZ) is a gold, copper and silver producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company has a 1,962 square kilometre portfolio, assembled from analysis of historic Soviet geological data and held under a Production Sharing Agreement modelled on the Azeri oil industry.

 

The Company developed Azerbaijan's first operating gold/copper/silver mine, Gedabek, which commenced gold production in May 2009. Gedabek is an open cast mine with a series of interconnected pits. The Company also mines high grade ore from the Gadir underground mine which is co-located at the Gedabek site. The Company has a second underground mine, Gosha, which is 50 kilometres from Gedabek. Ore mined at Gosha is processed at Anglo Asian's Gedabek plant.

 

Gold production for the year ended 31 December 2015 from Gedabek totalled 72,032 ounces with 969 tonnes of copper also produced. Gedabek is a polymetallic deposit and its ore has a high copper content, and as a result the Company produces copper concentrate from its Sulphidisation, Acidification, Recycling, and Thickening (SART) plant. Anglo Asian also produces a copper and precious metal concentrate from its flotation plant, which commenced production in the last quarter of 2015. This is initially processing tailings from the agitation leach plant.

 

Anglo Asian is also actively seeking to exploit its first mover advantage in Azerbaijan to identify additional projects, as well as looking for other properties in order to fulfil its expansion ambitions and become a mid-tier gold and copper metal production company.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFIEFSLELIR
Date   Source Headline
6th Feb 20137:00 amRNSCompany Gold Production Update, Azerbaijan
9th Jan 20137:00 amRNSQ4 2012 Production and Operations Update - Gedabek
8th Jan 201312:45 pmRNSIBA Loan Update
17th Dec 20127:00 amRNSCopper sales contract signed with Glencore
29th Oct 20127:30 amRNSChange of Adviser
17th Oct 20127:00 amRNSInvestor Presentation Evening
8th Oct 20127:00 amRNSQ3 2012 Gedabek Operations Update
27th Sep 20127:00 amRNSInterim Results
20th Sep 20127:00 amRNSFurther Loan Agreed to Develop Gedabek Gold Mine
12th Jul 20127:00 amRNSQ2 Operations Update Gedabek Gold Mine
29th Jun 201212:00 pmRNSTotal Voting Rights
25th Jun 20121:45 pmRNSResult of AGM & Management Changes
25th Jun 20127:00 amRNSAGM Statement
8th Jun 20129:52 amRNSIssue of Equity
7th Jun 20127:00 amRNSReserve Report Gedabek Gold Mine Azerbaijan
1st Jun 20127:00 amRNSNotice of AGM and Posting of R&A
23rd May 20127:00 amRNSFinal Results
18th May 20127:00 amRNSUSD 7.5 Million Loan
14th May 20127:00 amRNSApproval to Establish Second Mine in Azerbaijan
10th May 20127:00 amRNSGold Recovery Enhancements at Gedabek Azerbaijan
23rd Apr 20127:00 amRNSNotice of Discovery for Gold at Ordubad Azerbaijan
12th Apr 20127:07 amRNSQ1 2012 Gedabek Operations Update
3rd Apr 20127:00 amRNS50% Resource Increase at Gedabek Gold/Copper Mine
20th Jan 20127:00 amRNSQ4/ FY2011 Gedabek Gold Mine Update
24th Nov 201110:30 amRNSChange of Adviser
21st Nov 20117:00 amRNSGosha Gold Project Update, Azerbaijan
2nd Nov 20117:00 amRNSLoan Update
25th Oct 20117:00 amRNSGedabek - Exploration Update
17th Oct 20117:00 amRNSQ3 Operations Update - Gedabek Gold/Copper Mine
6th Oct 20117:00 amRNSNew Website Launch
20th Sep 20117:00 amRNSInterim Results
11th Jul 20117:00 amRNSQ2 Operations Update - Gedabek Gold/Copper Mine
24th Jun 20112:00 pmRNSAGM Result
15th Jun 201110:45 amRNSGedabek Gold/Copper Mine and Gosha Update
3rd Jun 20117:00 amRNSNotice of AGM and Report and Accounts
26th May 20117:00 amRNSFinal Results
26th Apr 20117:00 amRNSExploration Licence Update
6th Apr 20117:00 amRNSQ1 Operations Update - Gedabek Gold/Copper Mine
15th Mar 20113:40 pmRNSHolding(s) in Company
22nd Feb 20117:00 amRNSNotice of Discovery & Gold Exploration Update
24th Jan 201111:30 amRNSDirector Exercise of Options
11th Jan 20119:15 amRNSDirector Dealings
10th Jan 20117:00 amRNSQ4 Operations Update
23rd Dec 20104:40 pmRNSSecond Price Monitoring Extn
23rd Dec 20104:35 pmRNSPrice Monitoring Extension
23rd Dec 20102:15 pmRNSLoan repayment update
29th Oct 20107:00 amRNSGedabek Gold Resource Update
18th Oct 201012:29 pmRNSIssue of New Shares - Replacement Announcement
15th Oct 20104:26 pmRNSIssue of new shares
14th Oct 20107:00 amRNSStatement re Press Coverage

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.