Ben Richardson, CEO at SulNOx, confident they can cost-effectively decarbonise commercial shipping. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 62.00
Bid: 60.00
Ask: 64.00
Change: 0.00 (0.00%)
Spread: 4.00 (6.667%)
Open: 62.00
High: 62.00
Low: 62.00
Prev. Close: 62.50
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Gedabek - Exploration Update

25 Oct 2011 07:00

RNS Number : 7564Q
Anglo Asian Mining PLC
25 October 2011
 



Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

25 October 2011

Anglo Asian Mining plc ('Anglo Asian' or 'the Company')

Gedabek Gold/Copper Mine - Exploration Update, Positive Infill Drilling Results

 

Anglo Asian Mining plc, the AIM listed gold producer, announces positive results from its 5,460m Phase 1 drilling campaign at its flagship Gedabek gold/copper mine ('Gedabek') in Azerbaijan.

 

Overview

·; 5,460m infill drilling programme undertaken to re-classify the current mineral resources and ore reserves categories and assess the spatial continuity and metallurgy of the existing resource to consider future mineral processing options

·; Drilling concentrated on the existing resource pit boundaries at Gedabek - results demonstrated consistent gold, silver and copper grades and spatial continuity of mineralisation

·; Best intersections of 3.2m at 29.47 g/t gold ('Au'), 11.76 g/t silver ('Ag') and 0.61% copper ('Cu') and 17.3m at 11.57 g/t Au, 46.52 g/t Ag and 0.88% Cu

·; CAE Mining conducting review of all drilling programmes completed at Gedabek - new three dimensional orebody interpretation and modelling expected to be completed by the end of 2011

·; Phase 2 drilling underway concentrating on outside the boundaries of the existing pit

·; Upgraded JORC resource report targeted for Q1 2012 followed by a JORC compliant reserve estimate later in 2012 

 

Anglo Asian CEO Reza Vaziri said, "These latest drilling results covering the existing pit continue to demonstrate consistent solid gold, silver and copper grades and continuity of mineralisation at Gedabek. With a current resource base of 791,000oz of gold, 49,300t of copper and 7,597,000oz of silver for all categories, it is our intention to continue both infill and exploration drilling at Gedabek. This is focussed on expanding the existing resource outline in order to announce an increased and upgraded resource by Q1 2012 and in turn, a JORC compliant reserve estimate thereafter. Additionally the latest drilling programme has enabled the Company to gain a better understanding of the metallurgy of the current resource at Gedabek to help assess future mineral processing options and ensure an accurate evaluation of the proposed agitation leaching plant, which would potentially enable an increase in Gedabek's mine life and thereby further improving the economic fundamentals of the mine.

 

"In addition, with gold and copper production continuing to perform solidly at Gedabek we remain confident of realising our production target of 58,000 to 60,000oz of gold and 525 tonnes of copper for FY 2011."

 

Detailed Information

The latest infill drilling programme at Gedabek comprised 59 holes over 5,460m across a 90,000 sq m area and concentrated within the boundaries of the existing pit at Gedabek. The drilling campaign was undertaken with a view to increasing and upgrading Gedabek's JORC compliant resource, which currently stands at 791,000oz of gold, 49,300t of copper and 7,597,000oz of silver for all categories. Drilling was also carried out to increase the confidence of the spatial variability of the already known gold, silver and copper mineralisation; to assess the metallurgy of the existing resource and in turn future mineral processing options.

 

The link to Table 1 shows the average grades of gold, silver and copper of each infill drill hole with grades greater than or equal to 0.3 g/t Au from the fourth drilling programme. The colour in each drill hole interval highlights the classification of the mineralisation, as follows:

 

·; Yellow highlighted results - 0.3

·; Orange highlighted results - 1.5

·; Red highlighted results - 3.0

 

Link to Table 1

http://www.rns-pdf.londonstockexchange.com/rns/7564Q_-2011-10-24.pdf

 

Best intersections from this drilling programme at Gedabek include:

·; SGSDD02 - 19m at 3.61 g/t Au, 10.52 g/t Ag and 0.18% Cu

·; SGSDD16 - 17.3m at 11.57 g/t Au, 46.52 g/t Ag and 0.88% Cu

·; SGSDD22A - 3.2m at 29.47 g/t Au, 11.76 g/t Ag and 0.61% Cu

·; SGSDD31 - 2.3m at 16.05 g/t Au, 73.54 g/t Ag and 3.45 % Cu

·; SGSDD33 - 2.1m at 9.35 g/t Au, 23.26 g/t Ag and 0.42 % Cu

 

A designated competent person from the mining consultants, CAE Mining, has carried out a detailed review of the latest drilling programme results and of those collated from the previous three drilling campaigns. These data include plan and cross section views, together with mineral resource models for Gedabek compiled by mining consultants SRK in 2007 and SGS Geostat in 2010. The review has confirmed the continuity of the gold, silver and copper mineralisation and geological structures across the Gedabek deposit. The new three dimensional orebody interpretation and modelling is expected to be completed by the end of 2011 with a view to announcing an upgraded JORC resource estimate by the first quarter of 2012 and a JORC compliant reserve estimate thereafter. 

 

With the completion of this latest drilling programme the drilling grid in the north area of the existing resource at Gedabek has been reduced to 20 x 20 m in order to improve the classification and increase the confidence of the spatial distribution of gold, silver and copper grades across the mineral resource.

 

In addition to Phase 1 drilling, the Company commenced Phase 2 of the exploration and development programme of Gedabek in the first quarter of 2011. Drilling is focussed on increasing the existing resource base and is concentrated on exploring outside of the existing pit boundary. So far 55 drill holes for a total of 8,300m of drilling have been completed and some of the assays have been received. Further drill holes have been planned as the ore body shows extensions towards the south of the existing pit boundary.

 

Other exploration activities continue within the Gedabek Contract Area, namely at the Maarif target. To date, 1,520m of the planned 3,000m drilling programme has been completed at Maarif, and the samples have been sent for independent assay. Remote sensing has also commenced and is being conducted across the entire Gedabek Contract Area with several potential anomalies detected for further investigations, which are planned for 2012.

 

Qualified Person

 

This announcement has been reviewed by Mr Gerard Evans the Competent Person at mining consultants CAE Mining Inc, who has more than 20 years of relevant experience in the field of activity concerned. He has a B.Sc (Hons) in Geology, SACNASP registered (reg. no: 400015/08), member of GSSA and GASA, and has consented to the inclusion of the material in the form and context in which it appears.

 

**ENDS**

 

For further information please visit www.aamining.com or contact:

Reza Vaziri

Anglo Asian Mining plc

Tel: +994 12 596 3350

Andrew Herbert

Anglo Asian Mining plc

Tel: +994 12 596 3350

Stuart Skinner

Numis Securities Limited, as Nominated Adviser

Tel: +44 (0) 20 7260 1000

James Black

Numis Securities Limited, as Corporate Broker

Tel: +44 (0) 20 7260 1000

Felicity Edwards

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

Hugo de Salis

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

 

 

Notes:

Anglo Asian Mining plc (AIM:AAZ) is a gold producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company has a 1,962 sq km prospective exploration portfolio, assembled on the back of analysis of historic Soviet geological data and held under a Production Sharing Agreement ('PSA') based on the Azeri oil industry. The Company developed Azerbaijan's first operating gold/copper mine, Gedabek, which commenced gold production in May 2009. Gold production for the year ended 31 December 2010 totalled 67,267 oz of gold.

 

Anglo Asian is actively looking to exploit its first mover advantage in Azerbaijan to identify additional projects, as well as looking for other properties in Central Asia and Caucasia in order to fulfil its expansion ambitions and become a mid-tier gold and base metal production company focussed in these regions.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDBBDGBXDBGBS
Date   Source Headline
17th Apr 20247:00 amRNSQ1 2024 Production and Operations Review
13th Mar 20247:00 amRNSEstablishment of a Sustainability Committee
20th Feb 20247:00 amRNSXarxar maiden JORC Mineral Resource Estimate
16th Feb 20247:00 amRNSUpdate on investment in Libero Copper & Gold Corp
25th Jan 20247:00 amRNSSignificant copper resource confirmed at Xarxar
19th Jan 20247:00 amRNSCommitment to GISTM
15th Jan 20247:00 amRNSQ4 and FY 2023 Production and Operations Review
12th Dec 20237:08 amRNSCaterpillar Underground Mining Equipment delivery
11th Dec 20237:00 amRNSGilar maiden JORC Mineral Resource completed
7th Nov 20237:00 amRNSAgreement of environmental action plan
23rd Oct 20237:00 amRNSDrill results increase mineralisation at Gilar
16th Oct 20237:00 amRNSQ3 and 9M 2023 Production and Operations review
10th Oct 202312:36 pmRNSLoan from the International Bank of Azerbaijan
9th Oct 20234:00 pmRNSLoan from the International Bank of Azerbaijan
4th Oct 20238:17 amRNSMeeting with residents of Soyudlu village
2nd Oct 202310:09 amRNSPDMR Dealing
28th Sep 20237:00 amRNSFinal Micon environmental report
26th Sep 20232:52 pmRNSEnvironmental report and restart of operations
26th Sep 20237:00 amRNSInterim Results
12th Sep 20237:00 amRNSMicon environmental report update
2nd Aug 202312:11 pmRNSUpdate on Environmental Study & Gedabek operations
17th Jul 20237:00 amRNSGedabek Tailings Dam
13th Jul 20237:00 amRNSQ2 & H1 2023 Production and Operations Review
11th Jul 202311:09 amRNSPayment of 2022 Final Dividend
22nd Jun 20232:42 pmRNSResult of AGM
22nd Jun 20237:00 amRNS2023 Annual General Meeting Statement
20th Jun 20237:00 amRNSNotice of Investor Presentation
19th Jun 20237:00 amRNSForward sale of gold
1st Jun 202310:00 amEQSHardman & Co Q&A on Anglo Asian Mining (AAZ): Mining at a key moment in its evolution
31st May 20239:51 amRNSPosting of 2022 Annual Report and Notice of AGM
31st May 20237:00 amRNSDrill results extend mineralisation at Gilar
16th May 20237:00 amRNS2022 Full year results
10th May 20237:15 amEQSHardman & Co Research on Anglo Asian Mining (AAZ): Growth in copper production poised to explode
17th Apr 20237:00 amRNSQ1 2023 Production and Operations Review
30th Mar 20237:00 amRNSStrategic growth plan
27th Mar 20237:00 amRNS300,000 plus tonnes of copper defined at Garadag
21st Mar 20237:00 amRNSIncreased Mineral Resource Estimate at Gilar
16th Mar 20237:00 amRNSXarxar annual copper production target
13th Mar 20237:09 amRNSSignificant copper identified at Xarxar
9th Mar 20237:00 amRNSRevolving Credit Facility Agreement
23rd Feb 20237:00 amRNS2023 Production Guidance
22nd Feb 20237:00 amRNSEquipment Purchase and flotation plant upgrade
21st Feb 20237:00 amRNSZafar mine design complete and construction starts
20th Feb 20237:00 amRNSFollow-on investment in Libero Copper & Gold Corp
24th Jan 20239:00 amRNSPrice Monitoring Extension
24th Jan 20237:00 amRNSGilar drill results extend mineralisation
18th Jan 20237:00 amRNSGilar Portal completed and tunnelling commences
16th Jan 20237:00 amRNSQ4 and FY 2022 Production and Operations review
9th Jan 20237:00 amRNSFollow-on investment in Libero Copper & Gold Corp
20th Dec 20227:00 amRNSIllegal Mining of Mineral Resources in Karabakh

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.