focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 63.50
Bid: 62.00
Ask: 65.00
Change: -2.00 (-3.05%)
Spread: 3.00 (4.839%)
Open: 65.50
High: 65.50
Low: 63.50
Prev. Close: 65.50
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Gedabek - Exploration Update

25 Oct 2011 07:00

RNS Number : 7564Q
Anglo Asian Mining PLC
25 October 2011
 



Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

25 October 2011

Anglo Asian Mining plc ('Anglo Asian' or 'the Company')

Gedabek Gold/Copper Mine - Exploration Update, Positive Infill Drilling Results

 

Anglo Asian Mining plc, the AIM listed gold producer, announces positive results from its 5,460m Phase 1 drilling campaign at its flagship Gedabek gold/copper mine ('Gedabek') in Azerbaijan.

 

Overview

·; 5,460m infill drilling programme undertaken to re-classify the current mineral resources and ore reserves categories and assess the spatial continuity and metallurgy of the existing resource to consider future mineral processing options

·; Drilling concentrated on the existing resource pit boundaries at Gedabek - results demonstrated consistent gold, silver and copper grades and spatial continuity of mineralisation

·; Best intersections of 3.2m at 29.47 g/t gold ('Au'), 11.76 g/t silver ('Ag') and 0.61% copper ('Cu') and 17.3m at 11.57 g/t Au, 46.52 g/t Ag and 0.88% Cu

·; CAE Mining conducting review of all drilling programmes completed at Gedabek - new three dimensional orebody interpretation and modelling expected to be completed by the end of 2011

·; Phase 2 drilling underway concentrating on outside the boundaries of the existing pit

·; Upgraded JORC resource report targeted for Q1 2012 followed by a JORC compliant reserve estimate later in 2012 

 

Anglo Asian CEO Reza Vaziri said, "These latest drilling results covering the existing pit continue to demonstrate consistent solid gold, silver and copper grades and continuity of mineralisation at Gedabek. With a current resource base of 791,000oz of gold, 49,300t of copper and 7,597,000oz of silver for all categories, it is our intention to continue both infill and exploration drilling at Gedabek. This is focussed on expanding the existing resource outline in order to announce an increased and upgraded resource by Q1 2012 and in turn, a JORC compliant reserve estimate thereafter. Additionally the latest drilling programme has enabled the Company to gain a better understanding of the metallurgy of the current resource at Gedabek to help assess future mineral processing options and ensure an accurate evaluation of the proposed agitation leaching plant, which would potentially enable an increase in Gedabek's mine life and thereby further improving the economic fundamentals of the mine.

 

"In addition, with gold and copper production continuing to perform solidly at Gedabek we remain confident of realising our production target of 58,000 to 60,000oz of gold and 525 tonnes of copper for FY 2011."

 

Detailed Information

The latest infill drilling programme at Gedabek comprised 59 holes over 5,460m across a 90,000 sq m area and concentrated within the boundaries of the existing pit at Gedabek. The drilling campaign was undertaken with a view to increasing and upgrading Gedabek's JORC compliant resource, which currently stands at 791,000oz of gold, 49,300t of copper and 7,597,000oz of silver for all categories. Drilling was also carried out to increase the confidence of the spatial variability of the already known gold, silver and copper mineralisation; to assess the metallurgy of the existing resource and in turn future mineral processing options.

 

The link to Table 1 shows the average grades of gold, silver and copper of each infill drill hole with grades greater than or equal to 0.3 g/t Au from the fourth drilling programme. The colour in each drill hole interval highlights the classification of the mineralisation, as follows:

 

·; Yellow highlighted results - 0.3

·; Orange highlighted results - 1.5

·; Red highlighted results - 3.0

 

Link to Table 1

http://www.rns-pdf.londonstockexchange.com/rns/7564Q_-2011-10-24.pdf

 

Best intersections from this drilling programme at Gedabek include:

·; SGSDD02 - 19m at 3.61 g/t Au, 10.52 g/t Ag and 0.18% Cu

·; SGSDD16 - 17.3m at 11.57 g/t Au, 46.52 g/t Ag and 0.88% Cu

·; SGSDD22A - 3.2m at 29.47 g/t Au, 11.76 g/t Ag and 0.61% Cu

·; SGSDD31 - 2.3m at 16.05 g/t Au, 73.54 g/t Ag and 3.45 % Cu

·; SGSDD33 - 2.1m at 9.35 g/t Au, 23.26 g/t Ag and 0.42 % Cu

 

A designated competent person from the mining consultants, CAE Mining, has carried out a detailed review of the latest drilling programme results and of those collated from the previous three drilling campaigns. These data include plan and cross section views, together with mineral resource models for Gedabek compiled by mining consultants SRK in 2007 and SGS Geostat in 2010. The review has confirmed the continuity of the gold, silver and copper mineralisation and geological structures across the Gedabek deposit. The new three dimensional orebody interpretation and modelling is expected to be completed by the end of 2011 with a view to announcing an upgraded JORC resource estimate by the first quarter of 2012 and a JORC compliant reserve estimate thereafter. 

 

With the completion of this latest drilling programme the drilling grid in the north area of the existing resource at Gedabek has been reduced to 20 x 20 m in order to improve the classification and increase the confidence of the spatial distribution of gold, silver and copper grades across the mineral resource.

 

In addition to Phase 1 drilling, the Company commenced Phase 2 of the exploration and development programme of Gedabek in the first quarter of 2011. Drilling is focussed on increasing the existing resource base and is concentrated on exploring outside of the existing pit boundary. So far 55 drill holes for a total of 8,300m of drilling have been completed and some of the assays have been received. Further drill holes have been planned as the ore body shows extensions towards the south of the existing pit boundary.

 

Other exploration activities continue within the Gedabek Contract Area, namely at the Maarif target. To date, 1,520m of the planned 3,000m drilling programme has been completed at Maarif, and the samples have been sent for independent assay. Remote sensing has also commenced and is being conducted across the entire Gedabek Contract Area with several potential anomalies detected for further investigations, which are planned for 2012.

 

Qualified Person

 

This announcement has been reviewed by Mr Gerard Evans the Competent Person at mining consultants CAE Mining Inc, who has more than 20 years of relevant experience in the field of activity concerned. He has a B.Sc (Hons) in Geology, SACNASP registered (reg. no: 400015/08), member of GSSA and GASA, and has consented to the inclusion of the material in the form and context in which it appears.

 

**ENDS**

 

For further information please visit www.aamining.com or contact:

Reza Vaziri

Anglo Asian Mining plc

Tel: +994 12 596 3350

Andrew Herbert

Anglo Asian Mining plc

Tel: +994 12 596 3350

Stuart Skinner

Numis Securities Limited, as Nominated Adviser

Tel: +44 (0) 20 7260 1000

James Black

Numis Securities Limited, as Corporate Broker

Tel: +44 (0) 20 7260 1000

Felicity Edwards

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

Hugo de Salis

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

 

 

Notes:

Anglo Asian Mining plc (AIM:AAZ) is a gold producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company has a 1,962 sq km prospective exploration portfolio, assembled on the back of analysis of historic Soviet geological data and held under a Production Sharing Agreement ('PSA') based on the Azeri oil industry. The Company developed Azerbaijan's first operating gold/copper mine, Gedabek, which commenced gold production in May 2009. Gold production for the year ended 31 December 2010 totalled 67,267 oz of gold.

 

Anglo Asian is actively looking to exploit its first mover advantage in Azerbaijan to identify additional projects, as well as looking for other properties in Central Asia and Caucasia in order to fulfil its expansion ambitions and become a mid-tier gold and base metal production company focussed in these regions.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDBBDGBXDBGBS
Date   Source Headline
23rd Oct 20187:00 amRNSPayment of interim dividend - sterling amount
11th Oct 20187:00 amRNSQ3 2018 Production and Operations Review
8th Oct 20187:00 amRNSExercise of Share Options and Issue of Equity
19th Sep 20187:00 amRNSInterim Results and Maiden Dividend
18th Sep 20187:00 amRNSGedabek Open Pit - JORC Resources and Reserves
17th Sep 20187:00 amRNSH1 Geological Exploration Activities and Results
13th Sep 20187:00 amRNSAirborne Geophysical Survey at Gedabek
5th Sep 20189:30 amRNSCorporate Presentation and Net Cash
3rd Sep 201811:30 amRNSTechnical Presentation and Paper
29th Aug 20188:30 amRNSApproval of Capital Reduction by the Court
31st Jul 20187:00 amRNSTotal Voting Rights
30th Jul 201811:30 amRNSResult of General Meeting
19th Jul 20185:09 pmRNSExercise of Share Options and Issue of Equity
17th Jul 20187:00 amRNSQ2 & H1 2018 Production and Operations Review
13th Jul 201810:00 amRNSPosting of Circular and Notice of General Meeting
5th Jul 201811:00 amRNSPDMR Exercise of Share Options and Issue of Equity
29th Jun 20184:15 pmRNSResult of AGM
29th Jun 20187:00 amRNSAGM Statement
7th Jun 20189:30 amRNSNotice of General Meeting
24th May 20187:00 amRNSFinal Results
3rd May 201811:16 amRNSNew Corporate Presentation
16th Apr 20187:25 amRNSQ1 2018 Production and Operations Review
3rd Apr 201812:00 pmRNSRepayment of Director Loan
26th Mar 20189:00 amRNS2017 Exploration Activities & Results
13th Mar 20187:00 amRNSLaunch of 2018 Exploration Programme
12th Feb 20187:00 amRNS$15 million Syndicated 2-year 7% Loan Facility
6th Feb 201812:30 pmRNSUpdated Corporate Presentation
6th Feb 20187:00 amRNSFY2018 Production Guidance of 78,000 - 84,000 GEOs
16th Jan 20184:40 pmRNSSecond Price Monitoring Extn
16th Jan 20184:35 pmRNSPrice Monitoring Extension
16th Jan 20187:00 amRNSQ4 & FY 2017 Production and Operations Review
10th Jan 20184:40 pmRNSSecond Price Monitoring Extn
10th Jan 20184:35 pmRNSPrice Monitoring Extension
10th Jan 20182:05 pmRNSSecond Price Monitoring Extn
10th Jan 20182:00 pmRNSPrice Monitoring Extension
10th Jan 20181:13 pmRNSUpdate re Director Loan
26th Oct 20177:00 amRNSExploration and Development Activity Update
19th Oct 201710:15 amRNSBritish Ambassador to Azerbaijan visits Gedabek
13th Oct 20177:00 amRNSQ3 2017 Production Update
2nd Oct 20177:00 amRNSCompletion of Ugur JORC Resource
21st Sep 20177:00 amRNSInterim Results
13th Sep 20178:00 amRNSCommencement of Production from Ugur Open Pit Mine
11th Sep 20179:47 amRNSPresentation at Conference of Metallurgists
14th Aug 20177:00 amRNSUgur Gold Deposit - JORC Resource and Reserves
31st Jul 20178:30 amRNSTotal Voting Rights
27th Jul 20174:30 pmRNSDirector Dealing
27th Jul 20177:00 amRNSIssue of Equity and Director Shareholding
24th Jul 201710:33 amRNSUgur Gold Deposit Development & Gedabek Update
17th Jul 20177:00 amRNSQ2 and H1 2017 Production and Operations Update
3rd Jul 20177:00 amRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.