The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 70.00
Bid: 69.00
Ask: 71.00
Change: -1.00 (-1.41%)
Spread: 2.00 (2.899%)
Open: 71.50
High: 72.50
Low: 70.00
Prev. Close: 71.00
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Significant Oxide Zone Drilled at Ugur Deposit

16 Dec 2016 07:00

RNS Number : 9991R
Anglo Asian Mining PLC
16 December 2016
 

Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

 

16 December 2016

Anglo Asian Mining plc

Significant oxide zone drilled at newly discovered Ugur deposit

 

Anglo Asian Mining plc ("Anglo Asian" or "the Company"), the AIM listed gold, copper and silver producer focused in Azerbaijan, is pleased to announce an exploration update for its new gold discovery, "Ugur", within its Gedabek licence area in western Azerbaijan ("Gedabek Licence").

 

Highlights

 

· Phase II drilling programme commenced in October 2016 to expand the potential resource at the Gedabek Licence - provides significant potential upside to the Company's future gold production

· Additional 35 reverse circulation drill holes completed since previous update - 1,842 metres of reverse circulation drilling now completed

· Core drilling commenced with six drill holes completed totalling 1,221 metres

· Initial Phase II core drilling programme has now confirmed an oxide zone to depth of about 60 metres

· Core drilling on-going based on a 40-metre grid system to allow for resource and reserve estimation

· Detailed geological structural and alteration mapping has started and an additional 240 metres of trenching completed

· Significant upside potential from results of alteration mapping - core drilling of flanks of main zone planned

 

Anglo Asian CEO, Reza Vaziri, said "These encouraging results from the newly discovered Ugur deposit enhance our understanding of the deposit and show that the oxide zone extends deeper than initially determined by previous drilling. Ugur is only three kilometres from our processing facilities at our main Gedabek site, highlighting the clear strategic value of developing this deposit. Work will continue to expand the potential resource of this new discovery. I look forward to updating shareholders on our progress as we work towards further enhancing our already profitable operation at Gedabek through the mining of multiple zones of mineralisation."

 

Anglo Asian Group Director of Geology, Stephen Westhead, said "With core drilling results having determined a significant oxide zone containing gold, it is planned to continue core drilling on a grid in the central area to allow for three-dimensional modelling for resource and reserve estimation of this exciting prospect. In conjunction with this, we will also drill the flanks of the area targeted by surface alteration mapping to expand the gold potential. We look forward to continuing to evaluate this deposit with a view to adding gold reserves in advance of mining as we aim to enhance our entire production profile for the Gedabek Licence."

 

Background

 

Anglo Asian's in-house exploration group has defined a new mineral occurrence named "Ugur" (meaning "good luck" or "success" in the Azeri language) located three kilometres north-west from its agitation leaching plant and heap leach facilities at its Gedabek Licence. This was defined as part of the on-going exploration programme to assess alteration zones and geological structures along strike from its Gedabek mine. As previously reported, this programme is designed to expand the Gedabek gold and copper resource.

 

The Ugur deposit area was defined from geological mapping. An alteration zone extends over an area of 1,000 metres (east-north-east by west-south-west) by 500 metres (north-west by south-east).

 

Detailed drill hole results

 

A total of 55 vertical reverse circulation ("RC") drill holes totalling 1,842 metres and six core drill holes totalling 1,221 metres have now been drilled at Ugur from which assay results have been subsequently obtained. The area covered by RC drilling is 600 metres (east-north-east) by 200 metres (north-north-west) within the alteration area, while a central mineralised zone of 225 metres (east-north-east) by 130 metres (north-north-west) has been defined with six core drill holes completed in this area.

 

The Company reported the significant results of RC drilling from the first twenty RC drill holes in its release of 17 October 2016. Subsequent to that release, a further 35 RC drill holes have been completed. Six of the RC drill holes contained significant mineralisation above the cut-off grade of 0.3 grammes per tonne.

 

The results of the six RC drill holes which contained significant mineralisation and the core drill holes one to six are set out in the tables below. These intersections (above 0.3 grammes per tonne) are all located in the oxide zone commencing from surface (unless otherwise stated). The assays returned no significant results for copper.

 

 

Additional Reverse Circulation drill holes since 17 October 2016 release (drill holes 21 to 55)*

 

 

Depth of drill hole

Grade

 

From

To

Total interval

Gold

Silver

Drill-hole

(metres)

(metres)

(metres)

(g/t)

(g/t)

UGRC21

0.0

8.0

8.0

0.20

1.38

UGRC24

5.0

23.0

18.0

0.19

1.19

UGRC24

23.0

27.0

4.0

0.34

0.75

UGRC24

27.0

34.0

7.0

0.16

0.75

UGRC25

1.0

4.0

3.0

0.34

1.54

UGRC25

4.0

12.0

8.0

0.18

0.86

UGRC25

12.0

19.0

7.0

0.41

1.51

UGRC25A

12.0

14.0

2.0

0.36

0.86

UGRC25A

14.0

19.0

5.0

0.12

0.91

UGRC25A

19.0

24.0

5.0

0.30

1.26

UGRC28

1.0

4.0

3.0

0.31

2.69

UGRC29

2.0

3.0

1.0

1.14

1.76

UGRC40

3.0

9.0

6.0

0.32

2.64

* The above results are for only those 6 drill holes which showed mineralisation above the cut-off grade of 0.3 grammes per tonne.

 

Core drill holes (drill holes 1 to 6)

 

 

Depth of drill hole

Grade

 

From

To

Total interval

Gold

Silver

Drill-hole

(metres)

(metres)

(metres)

(g/t)

(g/t)

UGDD1

4.0

63.2

59.2

2.02

6.03

UGDD1

63.2

76.2

13.0

0.20

1.80

 

 

 

 

 

 

UGDD2

3.0

64.5

61.5

3.36

12.13

Including:

 

 

 

 

 

UGDD2

3.0

17.0

14.0

8.00

17.09

UGDD2

17.0

35.4

18.4

1.32

16.62

UGDD2

35.4

46.0

10.6

4.26

7.88

UGDD2

46.0

64.5

18.5

1.46

4.43

 

 

 

 

 

 

UGDD3

0.0

35.0

35.0

1.08

10.05

 

 

 

 

 

 

UGDD4

8.0

51.5

43.5

1.82

4.94

Including:

 

 

 

 

 

UGDD4

24.0

28.7

4.7

9.07

12.90

 

 

 

 

 

 

UGDD5

0.0

28.0

28.0

0.25

1.64

UGDD6

18.0

59.6

41.6

0.49

1.06

UGDD6

73.4

87.3

13.9

0.79

1.17

 

 

Summary and future evaluation

 

These drill results continue to expand the resource potential at the Gedabek Licence and the Company is encouraged by the positive findings at the Ugur deposit. The area has only partially been drilled and initial field mapping has provided further drill targets. The Phase II core drilling programme designed on a grid for resource estimation will continue over the winter.

 

Installation of six primary topographic base stations that tie into the Gedabek mine grid system to allow for determining the coordinate of the drill collar locations have been completed. A topographical survey of the area is planned which is required for exploration planning, resource estimation and reserve calculation.

 

The 29 RC drill holes, completed since the last release and not reported above, had results to a depth of 34 metres which were either barren or only showed mineralisation below the 0.3 grammes per tonne cut-off grade. They were located in an area of about 250 metres by 70 metres extending west-south-west from the main central mineralised zone. It is planned to test this area by core drilling to deeper levels to ascertain its mineralisation.

 

All RC drilling at Ugur was carried out utilising only one drill bit, indicating the oxide material is comparatively soft and is not abrasive. This suggests that the material would require minimal blasting for extraction, and comminution productivity should be high. Preliminary bottle roll test work results yielded an average recovery of gold of 87 per cent. with low cyanide consumption. The full metallurgical properties of the deposit will be assessed in due course.

 

Competent Person Statement

 

The information in the announcement that relates to exploration results is based on information compiled by Dr Stephen Westhead, Director of Geology at Anglo Asian, who is a Fellow of The Geological Society of London, a Chartered Geologist and a Member of The Institute of Materials, Minerals and Mining.

 

Stephen Westhead has sufficient experience, relevant to the style of mineralisation and type of deposit under consideration and to the activity, which he is undertaking, to qualify as a qualified person as defined by the AIM Rules for Companies. Stephen Westhead has reviewed the exploration results included in this announcement.

 

 

**ENDS**

 

For further information please visit www.angloasianmining.com or contact:

 

Reza Vaziri

Anglo Asian Mining plc

Tel: +994 12 596 3350

Bill Morgan

Anglo Asian Mining plc

Tel: +994 502 910 400

Stephen Westhead

Anglo Asian Mining plc

Tel: +994 502 916 894

Ewan Leggat

SP Angel Corporate Finance LLP

Nominated Adviser and Broker

Tel: +44 (0) 20 3470 0470

Laura Harrison

SP Angel Corporate Finance LLP

Tel + 44 (0) 20 3470 0470

Lottie Brocklehurst

St Brides Partners Ltd

Tel: +44 (0) 20 7236 1177

Susie Geliher

St Brides Partners Ltd

Tel: +44 (0) 20 7236 1177

 

Notes:

Anglo Asian Mining plc (AIM:AAZ) is a gold, copper and silver producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company has a 1,962 square kilometre portfolio, assembled from analysis of historic Soviet geological data and held under a Production Sharing Agreement modelled on the Azeri oil industry.

 

The Company developed Azerbaijan's first operating gold/copper/silver mine, Gedabek, which commenced gold production in May 2009. Gedabek is an open cast mine with a series of interconnected pits. The Company also mines high grade ore from the Gadir underground mine which is co-located at the Gedabek site. The Company has a second underground mine, Gosha, which is 50 kilometres from Gedabek. Ore mined at Gosha is processed at Anglo Asian's Gedabek plant.

 

Gold production for the year ended 31 December 2015 from Gedabek totalled 72,032 ounces with 969 tonnes of copper also produced. Gedabek is a polymetallic deposit and its ore has a high copper content, and as a result the Company produces copper concentrate from its Sulphidisation, Acidification, Recycling, and Thickening (SART) plant. Anglo Asian also produces a copper and precious metal concentrate from its flotation plant, which commenced production in the last quarter of 2015. This is initially processing tailings from the agitation leach plant.

 

Anglo Asian is also actively seeking to exploit its first mover advantage in Azerbaijan to identify additional projects, as well as looking for other properties in order to fulfil its expansion ambitions and become a mid-tier gold and copper metal production company.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFIEFSLELIR
Date   Source Headline
8th May 20247:00 amRNSVendor Financing Facility Agreement
17th Apr 20247:00 amRNSQ1 2024 Production and Operations Review
13th Mar 20247:00 amRNSEstablishment of a Sustainability Committee
20th Feb 20247:00 amRNSXarxar maiden JORC Mineral Resource Estimate
16th Feb 20247:00 amRNSUpdate on investment in Libero Copper & Gold Corp
25th Jan 20247:00 amRNSSignificant copper resource confirmed at Xarxar
19th Jan 20247:00 amRNSCommitment to GISTM
15th Jan 20247:00 amRNSQ4 and FY 2023 Production and Operations Review
12th Dec 20237:08 amRNSCaterpillar Underground Mining Equipment delivery
11th Dec 20237:00 amRNSGilar maiden JORC Mineral Resource completed
7th Nov 20237:00 amRNSAgreement of environmental action plan
23rd Oct 20237:00 amRNSDrill results increase mineralisation at Gilar
16th Oct 20237:00 amRNSQ3 and 9M 2023 Production and Operations review
10th Oct 202312:36 pmRNSLoan from the International Bank of Azerbaijan
9th Oct 20234:00 pmRNSLoan from the International Bank of Azerbaijan
4th Oct 20238:17 amRNSMeeting with residents of Soyudlu village
2nd Oct 202310:09 amRNSPDMR Dealing
28th Sep 20237:00 amRNSFinal Micon environmental report
26th Sep 20232:52 pmRNSEnvironmental report and restart of operations
26th Sep 20237:00 amRNSInterim Results
12th Sep 20237:00 amRNSMicon environmental report update
2nd Aug 202312:11 pmRNSUpdate on Environmental Study & Gedabek operations
17th Jul 20237:00 amRNSGedabek Tailings Dam
13th Jul 20237:00 amRNSQ2 & H1 2023 Production and Operations Review
11th Jul 202311:09 amRNSPayment of 2022 Final Dividend
22nd Jun 20232:42 pmRNSResult of AGM
22nd Jun 20237:00 amRNS2023 Annual General Meeting Statement
20th Jun 20237:00 amRNSNotice of Investor Presentation
19th Jun 20237:00 amRNSForward sale of gold
1st Jun 202310:00 amEQSHardman & Co Q&A on Anglo Asian Mining (AAZ): Mining at a key moment in its evolution
31st May 20239:51 amRNSPosting of 2022 Annual Report and Notice of AGM
31st May 20237:00 amRNSDrill results extend mineralisation at Gilar
16th May 20237:00 amRNS2022 Full year results
10th May 20237:15 amEQSHardman & Co Research on Anglo Asian Mining (AAZ): Growth in copper production poised to explode
17th Apr 20237:00 amRNSQ1 2023 Production and Operations Review
30th Mar 20237:00 amRNSStrategic growth plan
27th Mar 20237:00 amRNS300,000 plus tonnes of copper defined at Garadag
21st Mar 20237:00 amRNSIncreased Mineral Resource Estimate at Gilar
16th Mar 20237:00 amRNSXarxar annual copper production target
13th Mar 20237:09 amRNSSignificant copper identified at Xarxar
9th Mar 20237:00 amRNSRevolving Credit Facility Agreement
23rd Feb 20237:00 amRNS2023 Production Guidance
22nd Feb 20237:00 amRNSEquipment Purchase and flotation plant upgrade
21st Feb 20237:00 amRNSZafar mine design complete and construction starts
20th Feb 20237:00 amRNSFollow-on investment in Libero Copper & Gold Corp
24th Jan 20239:00 amRNSPrice Monitoring Extension
24th Jan 20237:00 amRNSGilar drill results extend mineralisation
18th Jan 20237:00 amRNSGilar Portal completed and tunnelling commences
16th Jan 20237:00 amRNSQ4 and FY 2022 Production and Operations review
9th Jan 20237:00 amRNSFollow-on investment in Libero Copper & Gold Corp

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.