Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 62.50
Bid: 61.00
Ask: 64.00
Change: 0.00 (0.00%)
Spread: 3.00 (4.918%)
Open: 62.00
High: 62.50
Low: 62.00
Prev. Close: 62.50
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Gedabek Gold Resource Update

29 Oct 2010 07:00

RNS Number : 2186V
Anglo Asian Mining PLC
29 October 2010
 



Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

29 October 2010

Anglo Asian Mining plc ('Anglo Asian' or 'the Company')

Gedabek Resource increases to 704,000 oz Au in the Measured and Indicated classifications

 

Anglo Asian Mining plc, the AIM quoted gold producer, announces that following the issue of a new resource report, the gold resource at its Gedabek gold/copper mine in Azerbaijan ('Gedabek') has increased to 704,000 ounces ('oz') of gold ('Au') in the Measured and Indicated classifications. 

 

The JORC compliant block model estimate ('the Report') has been produced by mining consultants SGS Canada Incorporated Geostat Group ('SGS') on behalf of Anglo Asian and includes updated information available as of 7 June 2010. The Report significantly increases the resource from the estimate prepared in 2006 by SRK ('the SRK Estimate'). Both the Report and the SRK Estimate employ a cut-off grade of 0.3g/t Au for all categories. Newly available structural geologic information has been incorporated into the geologic model on which the Report was based. The resource estimate in the Report explicitly excludes mined materials, including ore mined in the period to 7 June 2010 and that which is currently in the leach pad process, or contained in ore stock piles.

 

Anglo Asian CEO Reza Vaziri said, "We are delighted to announce this upgraded resource which, after taking account of ore already mined, gives a total gold uplift across the Measured and Indicated resource categories of 31.2%. This resource increase reaffirms the inherent value of the Gedabek mine and, combined with the increasing gold production figures we are seeing at the mine and the favourable gold price environment will further strengthen our position as a profitable and cash generative gold production company."

 

Comparison of SGS 2010 Report and SRK 2006 resource estimate

 

SGS Canada 2010 Gedabek Resource (production era)

Tonnes

Au

Ag

Cu

Au

Ag

Cu

Classification

million

g/t

g/t

%

oz '000

oz '000

Tonnes

Measured

6.4

1.70

16.1

0.28

351

3,328

17,900

Indicated

9.8

1.12

11.1

0.27

353

3,487

26,200

Meas + Ind

16.2

1.35

13.1

0.27

704

6,814

44,100

Inferred

2.5

1.09

9.7

0.21

87

783

5,200

SRK 2006 Gedabek Resource (pre production)

Tonnes

Au

Ag

Cu

Au

Ag

Cu

Classification

millions

g/t

g/t

%

oz '000

oz '000

Tonnes

Indicated

12.4

1.5

13.0

0.26

598

5,183

32,200

Inferred

3.2

1.0

9.1

0.16

103

936

5,100

Numbers in tables above calculated with greater precision than displayed, then rounded.

 

A total of 3,252 holes have been drilled and the results incorporated into the Report: 3,076 air-rotary production holes; 59 diamond drill holes ('DDH'); 36 reverse circulation holes ('RC'); and 81 combination holes which started with RC, drilled proximal to the expected mineralised zone, and finished with DDH. A total of 13,895 assays were utilised.

 

 

Further Information

 

The updated resource estimate was prepared by SGS using inverse-distance squared estimation on 2.5x10x10 metre blocks. A geologic grade-shell constructed at 0.2g/t Au was used to constrain the estimation of the grades; the grade shell was designed on 20 sections paralleling the drillhole fences and 10 longitudinal orthogonal sections. Structural geology and continuity of gold grades were primary design factors in the grade shell design. Subsequently, four mineralised zones were identified, two of which were subdivided into two subzones each (in total six sub-zones). Search ellipsoids were constructed for grade estimation for each of the sub-zones. A nearest-neighbour estimate was also completed for validation purpose, using the same grade shell and search ellipsoids.

 

Gold grades were capped at 30g/t to limit the influence of sporadic high-grade assays, and thirty assays were thus capped.

 

The Block Model Estimate was classified to the standard three JORC classes: Measured/Indicated/Inferred on the following criteria:

 

·; Measured - within a radius of 15 metres from a composite value.

·; Indicated - between radii of 15 and 35 metres from a composite value.

·; Inferred - beyond the radius of 35 metres from a composite value, and up to the limits of the grade-shell envelope.

 

A value of 2.65 was used for specific gravity, derived from cumulative histogram analysis of 228 samples, with a mathematical average at 2.68.

 

The information within this resource update has been reviewed and signed off by D. Cukor, P.Geo, Senior Geologist of SGS, and Competent Person under JORC guidelines. The Report is available to be viewed at http://www.aamining.com/downloads.php.

 

This updated resource estimate follows the press release of 13 April 2010 in which the initial results of 'Phase 1 - Realistic Mineral Resources Model' (the 'Phase 1 Executive Summary') produced by SGS on behalf of the Company were announced. This earlier estimate was based on a total of 544 drill holes and the results were incorporated into the Phase 1 Executive Summary: 262 air-rotary production holes; 29 DDH; 34 RC holes; and 78 combination holes, started with RC, drilled proximal to the expected mineralised zone, and finished with DDH. The Phase 1 Executive Summary (not a JORC-compliant report) also indicated significant increases in the overall quantities of gold, silver and copper. However, like the SRK Estimate, the Phase 1 Executive Summary, produced by SGS, did not include structural geologic information, or the additional drill hole data (2,708 drill holes), which became available from 7 June 2010. The inclusion of this information has significantly improved the interpretation of the geologic model.

 

**ENDS**

 

For further information please visit www.aamining.com or contact:

Reza Vaziri

Anglo Asian Mining plc

Tel: +994 12 596 3350

Andrew Herbert

Anglo Asian Mining plc

Tel: +994 12 596 3350

John Harrison

Numis Securities Limited, as Nominated Adviser

Tel: +44 (0) 20 7260 1000

James Black

Numis Securities Limited, as Corporate Broker

Tel: +44 (0) 20 7260 1000

Felicity Edwards

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

Hugo de Salis

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

 

Notes:

Anglo Asian Mining plc (AIM:AAZ) is an emerging gold producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company has a 1,962 sq km prospective exploration portfolio, assembled on the back of analysis of historic Soviet geological data and held under a Production Sharing Agreement ('PSA') based on the Azeri oil industry. The Company developed Azerbaijan's first operating gold/copper mine, Gedabek, which commenced gold production in May 2009. 

 

Anglo Asian is actively looking to exploit its first mover advantage in Azerbaijan to identify additional projects, as well as looking for other properties in Central Asia and Caucasia in order to fulfil its expansion ambitions and become a mid-tier gold and base metal production company focussed in these regions.

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDDBDGLSDBGGI
Date   Source Headline
17th Apr 20247:00 amRNSQ1 2024 Production and Operations Review
13th Mar 20247:00 amRNSEstablishment of a Sustainability Committee
20th Feb 20247:00 amRNSXarxar maiden JORC Mineral Resource Estimate
16th Feb 20247:00 amRNSUpdate on investment in Libero Copper & Gold Corp
25th Jan 20247:00 amRNSSignificant copper resource confirmed at Xarxar
19th Jan 20247:00 amRNSCommitment to GISTM
15th Jan 20247:00 amRNSQ4 and FY 2023 Production and Operations Review
12th Dec 20237:08 amRNSCaterpillar Underground Mining Equipment delivery
11th Dec 20237:00 amRNSGilar maiden JORC Mineral Resource completed
7th Nov 20237:00 amRNSAgreement of environmental action plan
23rd Oct 20237:00 amRNSDrill results increase mineralisation at Gilar
16th Oct 20237:00 amRNSQ3 and 9M 2023 Production and Operations review
10th Oct 202312:36 pmRNSLoan from the International Bank of Azerbaijan
9th Oct 20234:00 pmRNSLoan from the International Bank of Azerbaijan
4th Oct 20238:17 amRNSMeeting with residents of Soyudlu village
2nd Oct 202310:09 amRNSPDMR Dealing
28th Sep 20237:00 amRNSFinal Micon environmental report
26th Sep 20232:52 pmRNSEnvironmental report and restart of operations
26th Sep 20237:00 amRNSInterim Results
12th Sep 20237:00 amRNSMicon environmental report update
2nd Aug 202312:11 pmRNSUpdate on Environmental Study & Gedabek operations
17th Jul 20237:00 amRNSGedabek Tailings Dam
13th Jul 20237:00 amRNSQ2 & H1 2023 Production and Operations Review
11th Jul 202311:09 amRNSPayment of 2022 Final Dividend
22nd Jun 20232:42 pmRNSResult of AGM
22nd Jun 20237:00 amRNS2023 Annual General Meeting Statement
20th Jun 20237:00 amRNSNotice of Investor Presentation
19th Jun 20237:00 amRNSForward sale of gold
1st Jun 202310:00 amEQSHardman & Co Q&A on Anglo Asian Mining (AAZ): Mining at a key moment in its evolution
31st May 20239:51 amRNSPosting of 2022 Annual Report and Notice of AGM
31st May 20237:00 amRNSDrill results extend mineralisation at Gilar
16th May 20237:00 amRNS2022 Full year results
10th May 20237:15 amEQSHardman & Co Research on Anglo Asian Mining (AAZ): Growth in copper production poised to explode
17th Apr 20237:00 amRNSQ1 2023 Production and Operations Review
30th Mar 20237:00 amRNSStrategic growth plan
27th Mar 20237:00 amRNS300,000 plus tonnes of copper defined at Garadag
21st Mar 20237:00 amRNSIncreased Mineral Resource Estimate at Gilar
16th Mar 20237:00 amRNSXarxar annual copper production target
13th Mar 20237:09 amRNSSignificant copper identified at Xarxar
9th Mar 20237:00 amRNSRevolving Credit Facility Agreement
23rd Feb 20237:00 amRNS2023 Production Guidance
22nd Feb 20237:00 amRNSEquipment Purchase and flotation plant upgrade
21st Feb 20237:00 amRNSZafar mine design complete and construction starts
20th Feb 20237:00 amRNSFollow-on investment in Libero Copper & Gold Corp
24th Jan 20239:00 amRNSPrice Monitoring Extension
24th Jan 20237:00 amRNSGilar drill results extend mineralisation
18th Jan 20237:00 amRNSGilar Portal completed and tunnelling commences
16th Jan 20237:00 amRNSQ4 and FY 2022 Production and Operations review
9th Jan 20237:00 amRNSFollow-on investment in Libero Copper & Gold Corp
20th Dec 20227:00 amRNSIllegal Mining of Mineral Resources in Karabakh

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.