The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 62.50
Bid: 60.00
Ask: 65.00
Change: -1.00 (-1.57%)
Spread: 5.00 (8.333%)
Open: 63.50
High: 65.00
Low: 61.00
Prev. Close: 63.50
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Gedabek Gold Resource Update

29 Oct 2010 07:00

RNS Number : 2186V
Anglo Asian Mining PLC
29 October 2010
 



Anglo Asian Mining plc / Ticker: AAZ / Index: AIM / Sector: Mining

29 October 2010

Anglo Asian Mining plc ('Anglo Asian' or 'the Company')

Gedabek Resource increases to 704,000 oz Au in the Measured and Indicated classifications

 

Anglo Asian Mining plc, the AIM quoted gold producer, announces that following the issue of a new resource report, the gold resource at its Gedabek gold/copper mine in Azerbaijan ('Gedabek') has increased to 704,000 ounces ('oz') of gold ('Au') in the Measured and Indicated classifications. 

 

The JORC compliant block model estimate ('the Report') has been produced by mining consultants SGS Canada Incorporated Geostat Group ('SGS') on behalf of Anglo Asian and includes updated information available as of 7 June 2010. The Report significantly increases the resource from the estimate prepared in 2006 by SRK ('the SRK Estimate'). Both the Report and the SRK Estimate employ a cut-off grade of 0.3g/t Au for all categories. Newly available structural geologic information has been incorporated into the geologic model on which the Report was based. The resource estimate in the Report explicitly excludes mined materials, including ore mined in the period to 7 June 2010 and that which is currently in the leach pad process, or contained in ore stock piles.

 

Anglo Asian CEO Reza Vaziri said, "We are delighted to announce this upgraded resource which, after taking account of ore already mined, gives a total gold uplift across the Measured and Indicated resource categories of 31.2%. This resource increase reaffirms the inherent value of the Gedabek mine and, combined with the increasing gold production figures we are seeing at the mine and the favourable gold price environment will further strengthen our position as a profitable and cash generative gold production company."

 

Comparison of SGS 2010 Report and SRK 2006 resource estimate

 

SGS Canada 2010 Gedabek Resource (production era)

Tonnes

Au

Ag

Cu

Au

Ag

Cu

Classification

million

g/t

g/t

%

oz '000

oz '000

Tonnes

Measured

6.4

1.70

16.1

0.28

351

3,328

17,900

Indicated

9.8

1.12

11.1

0.27

353

3,487

26,200

Meas + Ind

16.2

1.35

13.1

0.27

704

6,814

44,100

Inferred

2.5

1.09

9.7

0.21

87

783

5,200

SRK 2006 Gedabek Resource (pre production)

Tonnes

Au

Ag

Cu

Au

Ag

Cu

Classification

millions

g/t

g/t

%

oz '000

oz '000

Tonnes

Indicated

12.4

1.5

13.0

0.26

598

5,183

32,200

Inferred

3.2

1.0

9.1

0.16

103

936

5,100

Numbers in tables above calculated with greater precision than displayed, then rounded.

 

A total of 3,252 holes have been drilled and the results incorporated into the Report: 3,076 air-rotary production holes; 59 diamond drill holes ('DDH'); 36 reverse circulation holes ('RC'); and 81 combination holes which started with RC, drilled proximal to the expected mineralised zone, and finished with DDH. A total of 13,895 assays were utilised.

 

 

Further Information

 

The updated resource estimate was prepared by SGS using inverse-distance squared estimation on 2.5x10x10 metre blocks. A geologic grade-shell constructed at 0.2g/t Au was used to constrain the estimation of the grades; the grade shell was designed on 20 sections paralleling the drillhole fences and 10 longitudinal orthogonal sections. Structural geology and continuity of gold grades were primary design factors in the grade shell design. Subsequently, four mineralised zones were identified, two of which were subdivided into two subzones each (in total six sub-zones). Search ellipsoids were constructed for grade estimation for each of the sub-zones. A nearest-neighbour estimate was also completed for validation purpose, using the same grade shell and search ellipsoids.

 

Gold grades were capped at 30g/t to limit the influence of sporadic high-grade assays, and thirty assays were thus capped.

 

The Block Model Estimate was classified to the standard three JORC classes: Measured/Indicated/Inferred on the following criteria:

 

·; Measured - within a radius of 15 metres from a composite value.

·; Indicated - between radii of 15 and 35 metres from a composite value.

·; Inferred - beyond the radius of 35 metres from a composite value, and up to the limits of the grade-shell envelope.

 

A value of 2.65 was used for specific gravity, derived from cumulative histogram analysis of 228 samples, with a mathematical average at 2.68.

 

The information within this resource update has been reviewed and signed off by D. Cukor, P.Geo, Senior Geologist of SGS, and Competent Person under JORC guidelines. The Report is available to be viewed at http://www.aamining.com/downloads.php.

 

This updated resource estimate follows the press release of 13 April 2010 in which the initial results of 'Phase 1 - Realistic Mineral Resources Model' (the 'Phase 1 Executive Summary') produced by SGS on behalf of the Company were announced. This earlier estimate was based on a total of 544 drill holes and the results were incorporated into the Phase 1 Executive Summary: 262 air-rotary production holes; 29 DDH; 34 RC holes; and 78 combination holes, started with RC, drilled proximal to the expected mineralised zone, and finished with DDH. The Phase 1 Executive Summary (not a JORC-compliant report) also indicated significant increases in the overall quantities of gold, silver and copper. However, like the SRK Estimate, the Phase 1 Executive Summary, produced by SGS, did not include structural geologic information, or the additional drill hole data (2,708 drill holes), which became available from 7 June 2010. The inclusion of this information has significantly improved the interpretation of the geologic model.

 

**ENDS**

 

For further information please visit www.aamining.com or contact:

Reza Vaziri

Anglo Asian Mining plc

Tel: +994 12 596 3350

Andrew Herbert

Anglo Asian Mining plc

Tel: +994 12 596 3350

John Harrison

Numis Securities Limited, as Nominated Adviser

Tel: +44 (0) 20 7260 1000

James Black

Numis Securities Limited, as Corporate Broker

Tel: +44 (0) 20 7260 1000

Felicity Edwards

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

Hugo de Salis

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

 

Notes:

Anglo Asian Mining plc (AIM:AAZ) is an emerging gold producer in Central Asia with a broad portfolio of production and exploration assets in Azerbaijan. The Company has a 1,962 sq km prospective exploration portfolio, assembled on the back of analysis of historic Soviet geological data and held under a Production Sharing Agreement ('PSA') based on the Azeri oil industry. The Company developed Azerbaijan's first operating gold/copper mine, Gedabek, which commenced gold production in May 2009. 

 

Anglo Asian is actively looking to exploit its first mover advantage in Azerbaijan to identify additional projects, as well as looking for other properties in Central Asia and Caucasia in order to fulfil its expansion ambitions and become a mid-tier gold and base metal production company focussed in these regions.

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDDBDGLSDBGGI
Date   Source Headline
28th May 20157:00 amRNSFinal Results
22nd May 20157:00 amRNSDirector Loan
14th Apr 20157:00 amRNSQ1 2015 Gedabek Update
19th Mar 201511:54 amRNSDirector Dealing
12th Mar 20152:37 pmRNSDirector Dealing
9th Mar 20158:40 amRNSFlotation Plant Update - Gedabek Mine Azerbaijan
14th Jan 20157:15 amRNSQ4 2014 and FY 2014 Production Update Gedabek
6th Jan 20151:35 pmRNSDirector Share Dealing
20th Nov 20143:32 pmRNSFlotation Plant Construction and Production Update
19th Nov 20147:00 amRNSIncrease in JORC Ore Reserve at Gedabek mine
15th Oct 201410:30 amRNSQ3 2014 Production and Operational Update
23rd Sep 20147:00 amRNSInterim Results
18th Jul 20147:00 amRNSQ2 2014 and H1 2014 Operations Update
30th Jun 20142:39 pmRNSResult of AGM
30th Jun 20147:00 amRNSAGM Statement
5th Jun 20143:44 pmRNS29% Increase in Resource - Gedabek (Replacement)
5th Jun 20147:00 amRNS29 per cent Increase in Resource at Gedabek
4th Jun 20143:58 pmRNSPosting of Report and Accounts and Notice of AGM
28th May 20147:00 amRNSFinal Results
22nd May 20147:00 amRNSLoan Agreement
14th May 20144:41 pmRNSSecond Price Monitoring Extn
14th May 20144:35 pmRNSPrice Monitoring Extension
14th May 20142:30 pmRNSUpdate re Final Results
6th May 20147:01 amRNSNew Copper Sales Contract - Gedabek Azerbaijan
17th Apr 20148:30 amRNSGedabek and Gosha Q1 2014 Update
28th Feb 20149:36 amRNSDirector's Shareholding
20th Feb 20143:10 pmRNSDirector's Shareholding
31st Jan 20147:00 amRNSTotal Voting Rights
23rd Jan 20149:33 amRNSDirector's Dealing and Issue of Equity
15th Jan 20147:00 amRNSQ4 Operations and FY 2013 Update for Gedabek Mine
8th Jan 20147:00 amRNSHighly Positive Exploration Update at Gedabek
20th Dec 20137:00 amRNSGedabek Gold Mine Update Azerbaijan
2nd Dec 20137:00 amRNSNew High Grade Gold Discovered at Gedabek Mine
18th Nov 20137:00 amRNSAppointment of Director of Geology
21st Oct 20139:00 amRNSHolding(s) in Company
16th Oct 20137:34 amRNSInvestor Evenings - Dublin and Manchester
11th Oct 201310:32 amRNSGedabek Resource Increase to 1.12 Moz of gold
10th Oct 20137:00 amRNSRecord Gold Production Q3 2013 - Gedabek
9th Oct 20137:00 amRNSDebt Refinancing - USD37M Loan Facility
26th Sep 20137:00 amRNSInterim Results
11th Sep 20137:00 amRNSGedabek & Gosha Gold Mining Update Azerbaijan
11th Jul 20137:00 amRNSQ2 2013 Gedabek Operations Update
8th Jul 20137:00 amRNSCopper Sales Update, Gedabek
1st Jul 20139:40 amRNSResult of AGM
28th Jun 20137:00 amRNSAGM Statement
5th Jun 20135:49 pmRNSNotice of AGM and Posting of R&A
5th Jun 20137:00 amRNSAgitation Leaching Plant - Full Commissioning
28th May 20137:00 amRNSFinal Results
22nd May 20137:00 amRNSAnalyst Conference Call for Final Results
10th Apr 20137:00 amRNSQ1 2013 Production and Operations Update - Gedabek

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.