RE: Fast track Gas utilisation facilities2 Dec 2019 14:59
to part answer my own query - this from the IEA
"For new fields, operators should aim to develop plans to use or conserve all the field's associated gas without routine flaring. At existing oil fields, operators are asked to eliminate routine flaring when it is economically viable as soon as possible, and no later than 2030"
Perhaps UKOG have realised potentially large flows already and with it large gas volumes so are looking to stay on the right side of the EA / OGA