RE: all good13 Jan 2020 16:04
"Immediately prior to rig arrival, test production from the HH-1 Kimmeridge oil pool was temporarily shut-in to permit a safe rig-up process and will be resumed prior to the pilot hole spud" same during rig down. "To permit safe operations during the HH-2z rig-down operation, HH-1 Kimmeridge EWT production has also been temporarily shut in" and the pump was off. its not beyond the realm of possibility they are doing the same again for putting up the work over rig is it? time will tell.