Hopefully they are working on the RNS28 Nov 2021 17:01
Hopefully getting the wording exactly right. Simple, straightforward clean. No surprises and no qualifications.
Something like this (my best shot or maybe my dream only - numbers in parentheses are place holders) :
<
Following completion and a clean up period, the well was shut in and pressure built to (3000) psi at surface, estimated (7000) psi reservoir pressure). Well was then flow tested at various choke sizes including an extended 24 hour flow test.
The average flowback rate during the extended 24-hour test period was approximately (5,000) boe/d, including (25) MMcf/d of natural gas and (500) bbls/d of NGLs.
Approximately (50) MMcf of natural gas (8500) boe) and 1,100 barrels of NGLs were produced during the testing period.
Field analysis indicated liquids rich gas with no hydrogen sulfide and no produced water.
The well was then shut in for extended pressure build up testing . That testing is complete and the downhole recorder has been retrieved. Results from the pressure build up test will be analyzed by company and by independent analysis to determine reservoir size and expected initial production rates.
Attention has now been turned to the third planned test at Royston 1 of a separate and higher overthrust sheet at the top of the Gr7a Herrera sands which has shown 62 feet of net pay in an 84 foot interval. Results from this third test are expected before the end of the year. >>