RE: Checking in quick...27 May 2020 10:03
I know we’re waiting on the drilling plan for H2 2020 but does anyone have a rough idea what to expect? Drilling depth, amount of holes, cost of drilling etc? If we assume the cost is $200 per metre (rough average) at a depth of 300m (open pit) then with the latest placing if all the money was used for drilling each hole would cost £46,000 for 13 holes. Depending on results of the drilling another placing/raising funds would be needed but at a higher SP hopefully!