RE: Presentation4 Dec 2018 16:57
Agree about 2, even though Dr S has raised the possibility of Heap Leaching at Kiziltepe the size of plant required at Tavsan would be on a different scale.
I like the idea of the additional ball mill at Kiziltepe, for several reasons:
Potentially expands production very quickly
Cost efficient, cant see any need for another loan as the JV will presumably have $1m down the back of the sofa
Builds in an element of redundancy in what must be a stressed part of the processing.
I get the feeling that the additional ball mill decision may have been made already, it has been mentioned a few times now, both by PG and in presentations. I don't know about timescales, but installing that at Kiziltepe combined with the stockpile of ore there is already would take the time pressure off needing Tavsan in production in order to get 50,000 oz by 2021