Copper and Nickel7 Sep 2020 13:27
Apart from the PGM, Monchetundra also has 28,124 tonnes of copper and 30,140 tonnes of Nickel. Using today's prices per tonne, that is:
28,124 x $6,103 = $171.64M
30,140 x $13,730 = $413.82M
Total is $585.46M
That's £440.84M.
If we get 15% of the in-situ value, that's an extra £66M.
These are the by-products of just the area of the mining license, not the flanks. The flanks would presumably increase these numbers significantly.