RE: In Gauge energy announcement on Empire14 Jan 2025 13:21
Does anyone know if the plan is to frack and flow the SS2H ST1 (the 1,800 side track drilled before Christmas) and the SS4h (the full 3,000m) at the same time. The last RNS was the completion of the SS4H with sand on the way. We have some nice pictures of the frack fleet too. I presume they are going to frack one, let it soak or not, and then move the fleet and frack the other. So do we know which one is being fracked first and if it has kicked off yet? It's been a while since the last shorty and I can't recall if they did an RNS when they started fracking or when they finished.