Falcon RNS out this morning15 Dec 2025 11:53
London South East
Check out our new Alternative Investment section.Click here
Share PricesFalcon Oil Share PriceFalcon Oil Share Regulatory NewsFalcon Oil & Gas Ltd. - Beetaloo Sub-basin - Completion of the SS2-1H well stimulation program
Pinned to quick picksFalcon Oil Regulatory News (FOG)
FOG Share Price
FOG Share
Price
FOG Share News
FOG Share
News
FOG Share Chat
FOG Share
Chat
FOG Share Trades
FOG Share
Trades
1
FOG Live RNS
FOG
Live RNS
1
Sponsored Content
Falcon Oil Information
Add FOG to Timeline
Remove FOG from Timeline
Add FOG to Watchlist
Add FOG to Watchlist
Add FOG to Alert
Add FOG to Alert
Buy FOG Shares
Buy FOG Shares
Share Price Information for Falcon Oil (FOG)
London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price:
10.75
Bid:
10.50
Ask:
11.00
Change:
0.00 (0.00%)
Spread: 0.50 (4.762%)Open: 10.75High: 10.75Low: 10.75Prev. Close: 10.75
FOG Live PriceLast checked at 11:52:21
Sponsored Content
Falcon Oil & Gas Ltd. - Beetaloo Sub-basin - Completion of the SS2-1H well stimulation program
Today 07:00
Falcon Oil & Gas Ltd. - Beetaloo Sub-basin - Completion of the SS2-1H well stimulation program
Falcon Oil & Gas Ltd (“Falcon”)
Beetaloo Sub-basin - Completion of the SS2-1H well stimulation program
15 December 2025 – Falcon Oil & Gas Ltd. (TSXV: FO, AIM: FOG) is pleased to announce that Falcon Oil & Gas Australia Limited’s (“Falcon Australia”) joint venture partner Tamboran (B2) Pty Limited (collectively the “BJV partners”) has completed the Shenandoah South SS2-1H well (“SS2-1H”) stimulation program.
Stimulation Program Details:
58 stages were stimulated across a ~3,050-metre (10,009 foot) horizontal section within the Amungee Member B Shale, with an average intensity of 2,206 pounds per foot of proppant placed along the completed horizontal section.Wellhead injection rates were consistently above 100 barrels per minute.The program utilized Liberty Energy’s (NYSE: LBRT) modern stimulation equipment.Optimization of the stimulation design during the campaign increased stage spacing from ~50 metres to ~60 metres (164 feet to 196 feet), reducing the total number of stages required. This adjustment is expected to lower costs in future stimulation programs. Due to an equipment issue encountered during the cleaning out of the well, it was determined that ~2,632-metres (8,635 feet) of the horizontal section (86%) will contribute to unimpeded flow but flow may be impeded for the remaining ~419-metre (1,374 feet) section from the toe.Following completion with tubing, the well will be soaked for 30 days before being flow tested for 30 days.30-day initial production (IP30) flow rates are expected during the first quarter of 2026.In H1 2026, three wells (which includes the second well of the 2024 drilling campaign) are expected to be stimulated ahead of the commencement of gas sales.All wells included in the Shenandoah So