Re: 260 etc15 Jul 2018 17:47
Things to consider.
B Robitics will provide a couple,of techs to show the Zen operators where the starting handle is and how to stop it when it all goes wrong. They have allocated 4 weeks for on the job training. Don't forget that this hydraulic gadget is non standard and will take some getting used-to. There will be a certain amount of resistance to its use I would guess initially and they will have to take things slowly as it would be wreckless to horse on with it without being competent.
Next question is wtf are they going to do at z21. Just complete it and see if it produces from an open hole arrangement or are they going to case it to bottom and perforate it, or are they going for gold and drilling down another 3-400m in which case August/Sept will become November/Dec b fore we get it flowing.
They may also want to run further tests so as to get as much geological data, well behaviour characteristics, reservoir estimate, recovery times, flow rates at different intervals etc. They may go for a double completion with two separate production tubes, who knows.
In other words mate, not a clue how long it will take. A quick in out, remove pipe and clean up could be done within 2-3 weeks, or if they go for the whole bifta, it might be Nov/Dec.
I would just like them to get it into production and case it all the way to help prevent collapse but I am fully expecting the re-drill. Progress of which has many variables such as the weight on the bit, torque, type of bit, mud weight, formation of the rock at that point etc etc, Could be about 10m per day which equates to about 5 -6 weeks after the existing tubing has been removed. Then they would need to sort out the completion and get it flowing with/without a pump
They/we are going to need over 200/day from it after such a cost and delay. .