Re : Rig etc7 Aug 2018 13:37
On the plus, it does show that it is under fabrication. What we don't know is how much more of it already exists.
Delivery dates from an Italian or pretty much any other fabrication yard in Europe is merely a starting point. I may have posted some time ago that the Sept dat must be taken as an approximation. If it were Chinese, then whatever date they give is almost always the date you get. Italy/Spain/Anywhere else in that general area is just to get you to sign up and commit.
This is not a production line where everything is timed to the fraction of a second with materials measured to the nearest gram, it is a small company fabricating and building to order. They will have to assemble it, get it commissioned after all of the electronics have been fitted and tested, limit switches, proximity sensors etc set up, pumps tested, hydraulics set up and tested. They will have some quality control procedures and likely some re-work but maybe we will get it painted in Rosso Red, of Fly Yellow. I don't care providing it is reliable and does the job. See y'all at Christmas.