RE: RE: Investor Presentation21 May 2019 08:57
Zeb. Each pipe section is about 30-35ft long but they join 3 together to make what is known as a 'stand' and then they rack it in to derrick. This way, when they run in and out o f the hole they do it with 3 x the length of one pipe, therefore 3 x faster than doing it with singles as Zen have been doing so far with the small rig.
A.J. They are probably waiting because they may have the other bits required to use the rotary table--I dunno, but once they start drilling using a particular method ( one or the other) it is better to continue with it, therefore better to wait a bit for the T Drive and use it. I also doubt they are ready to start drilling anyway, last picture showed me that there was still a bit of work to do. i.e there was no pipe deck or racks for the drill pipe in place ( not much work, but nevertheless indicates they are not ready).
Ironically after an inordinate amount of time to get the site ready and set up, the first section of the drill could be all over within a day !. Anyhow, interest lost, no longer really care, it will be what it will be.