RE. Oh dear2 May 2019 18:21
GG. Was just getting off the train on last message. Raising it and getting it lined up with pins etc in place should be about half an hour or so,once they get going They should be checking, double and treble checking all pins, retaining clips to make sure they are all in place, tie up hanging lines so they don't get snagged in anything, check the structure to make sure there are no tools or loose items left on it anywhere, check that there is nothing in the way of the feet when it lands in the upright position. Hopefully they will install a retaining line to the opposite side to the pulling line so that it can be lowered under controlled conditions to the vertical. If they just let it drop in f rom say around 85degrees it might just flip over ! Also, hopefully they will check and double check the security of the draw works. We don't want it coming adrift with the weight of the jib trying to pull it off the platform. It's a safety critical operation, which will be completed by the b robotics techs so it's not like they haven't done it before innit.I reckon they are about 2 weeks behind where they should be tbh.